# ACCIONA account plan

> ACCIONA is a Spanish infrastructure, water and renewable-energy group: record €20,236 M revenue in 2025, 68,502 employees in more than 60 countries.

## At a glance

ACCIONA develops, finances, builds, operates and owns infrastructure, water and renewable-energy assets, and holds 47.08% of wind turbine maker Nordex. It operates in more than 60 countries with 68,502 employees at end-2025; Australia, Spain, Brazil, Canada and the United States are its main infrastructure markets. In 2025 revenue reached a record €20,236 M (+5.5%) and EBITDA a record €3,211 M (+31%), with net debt/EBITDA at 2.18x. EBITDA came 47% from ACCIONA Energía, 25% from Infrastructure, 23% from Nordex and 5% from other activities. José Manuel Entrecanales Domecq is chairman and CEO.

## Business units

- **ACCIONA Energía** (47% of 2025 group EBITDA; revenue €2,925 M): Renewable-only energy operator with 14.6 GW of owned capacity in 22 countries, led by CEO Arantza Ezpeleta. 2025 EBITDA rose 37.7% to €1,546 M, of which €614 M from asset rotation. The strategy has shifted to selective growth and debt reduction, with storage, repowering and power for data centres as growth areas.
- **Infrastructure: Construction** (revenue €6,949 M in 2025): Transport, urban, water, industrial and mining construction within the Infrastructure division, which is led by CEO José Díaz-Caneja; Australia is 42% of construction revenue and Spain 18%. Works include the Western Harbour Tunnel, Central West Orana, Ontario Line and São Paulo Metro Line 6, at a 7.3% margin in H1 2026.
- **Infrastructure: Concessions** (revenue €175 M in 2025): A young portfolio of managed lanes, transmission, metro, waste-to-energy and water concessions, 90% under construction, including SR-400 in Atlanta and Central West Orana in Australia. The Concessional Asset Backlog reached a record €141,282 M at 9M 2026, expected to return about €64,000 M to ACCIONA.
- **Infrastructure: Water** (revenue €1,385 M in 2025): Desalination, treatment plants, O&M and water utility concessions; 2025 EBITDA rose 49.7% to €140 M on the Collahuasi and Casablanca desalination plants. The 35-year Pernambuco water and sanitation concession in Brazil, with BRK, was signed in April 2026.
- **Nordex** (23% of 2025 group EBITDA; revenue €7,554 M): Hamburg-based wind turbine maker, 47.08% owned, with a 48% market share in Central Europe and the world's second-largest turbine maker outside China. Backlog reached €19,341 M at 9M 2026 and 2026 margin guidance was raised to 11.5-12.5%.
- **Other activities** (5% of 2025 group EBITDA; revenue €1,574 M): Real estate (Living, 1,244 homes delivered in 2025), asset manager Bestinver (AUM €8,386 M at 9M 2026), Facility Services and Urban & Environmental Services, Silence electric mobility, ACCIONA Cultura and airport handling.

## Strategic priorities

- **Win the infrastructure cycle with integrated systems**: The chairman describes an infrastructure hypercycle and positions ACCIONA as able to develop, design, finance, build, operate and own complex assets; Brazil and the United States are named as the two largest growth markets.
- **Grow concessions, led by US managed lanes**: ACCIONA won 17 concession projects in 2023-2025 (€27 billion) and tracks about 130 greenfield opportunities worth about €300 billion; it is shortlisted for I-77 South Express Lanes in North Carolina.
- **Deleverage ACCIONA Energía**: Asset rotation of €3,200 M was signed in 2024-2025; 2026 guidance targets about €1,200 M EBITDA and net debt of €3.25-3.50bn, with about €40 million of annualised savings.
- **Selective renewables growth**: The medium-term model is 1.0-1.2 GW of new capacity a year with 0.4-0.5 GW rotated, with storage and data centre power supply as priorities; the data centre pipeline is "more like over 2 GW".
- **Keep leverage below 3x**: 2026 guidance: EBITDA at the upper end of €2,800-3,100 M, ordinary net investment of about €2,000 M and net debt/EBITDA below 3.0x at year-end.

## Latest results

In the first nine months of 2026 ACCIONA said operations were ahead of expectations and now expects 2026 EBITDA at the upper end of €2,800-3,100 M. In H1 2026 revenue rose 9.9% to €10,142 M but EBITDA fell 25.9% to €1,153 M and attributable net profit to €83 M, because H1 2025 included €443 M of asset-rotation gains; EBITDA from operations grew 3.6%. ACCIONA Energía's captured price was €57.3/MWh at 9M (-8.1%), while Nordex reached a 10.6% EBITDA margin. Net financial debt was €8,243 M at June 2026. The ~€2bn 2026 asset-rotation target will not be met, mainly because conditions for the MIP deal were not satisfied.

## Investments and deals

- **2026 investment plan**: Ordinary net investment for 2026 was cut to about €2,000 M from €2,200-2,500 M; 2025 ordinary investment was €2,252 M, of which Energy €1,437 M and Infrastructure €624 M.
- **Concession equity commitments**: Equity invested in concessions was €1,071 M at 9M 2026, with further commitments of €1,990 M to 2035.
- **Energy asset rotation**: In July 2026 ACCIONA Energía sold 64 MW of hydro to White Summit Capital for €66 M and 361 MW of wind to Galp New Energies for €432 M, cutting debt by close to €500 M.
- **Support for ACCIONA Energía's rating**: ACCIONA, S.A. is granting ACCIONA Energía a €500 M perpetual subordinated loan to strengthen its balance sheet and protect its credit rating.
- **Storage and new projects**: Approvals include the El Romero battery in Chile (196 MW), the Madison 125 MWp PV plant in the United States and three battery projects in the Dominican Republic.

## Challenges and risks

- **Lower Spanish power prices**: Strong hydro depressed Spanish prices: the captured price in Spain fell to €59.3/MWh (-26.7%) in H1 2026 and Spanish generation EBITDA dropped 52.9%.
- **Asset rotation delays**: The ~€2bn 2026 asset-rotation target is not expected to be met because the MIP transaction's conditions were not satisfied; Fitch had moved ACCIONA Energía's outlook to negative.
- **Chinese wind competition**: The chairman warns that Chinese competition in wind turbines "does not always occur on a level playing field", a risk for Nordex.
- **Execution on MacIntyre**: Blade damage at the 923 MW MacIntyre wind farm in Australia, related to transport, delayed ramp-up; full commissioning is expected in Q2 2027.
- **Lost US tenders and policy risk**: ACCIONA lost the I-24 and I-285 managed-lanes bids, and new US executive orders on tax incentives and foreign equipment are being mitigated for US solar projects.

## What leadership says

> "The constraint is not demand, it is not capital. It is the scarcity of bankable, execution-ready projects and the ability of companies to deliver these projects as integrated systems rather than isolated assets." — José Manuel Entrecanales, Chairman & CEO, H1 2026 results presentation, 31 July 2026

> "We are entering an infrastructure hypercycle" — José Manuel Entrecanales, Chairman & CEO, AGM address, 25 June 2026

> "Climate resilience is no longer simply an environmental consideration; it has become an economic imperative." — José Manuel Entrecanales, Chairman & CEO, AGM address, 25 June 2026

> "we do not see Nordex as a temporary investment, very much on the contrary, as an industrial holding, not a financial holding." — José Manuel Entrecanales, Chairman & CEO, H1 2026 results presentation, 31 July 2026


## Where a supplier can help

- **Construction delivery capacity in Australia and the Americas**: Tied to the record backlog and the integrated-systems priority: subcontractors, equipment, materials and project controls suppliers can support works such as Western Harbour Tunnel, HumeLink and Ontario Line.
- **Battery storage and data centre power**: Tied to the selective renewables growth priority: battery, grid and EPC suppliers fit projects like El Romero and a data centre pipeline of over 2 GW.
- **Cost efficiency at ACCIONA Energía**: Tied to the deleveraging priority and about €40 million of targeted savings: O&M, asset-performance and procurement solutions that cut operating cost are relevant.
- **Water concessions in Brazil**: Tied to the Pernambuco and Paraíba concessions: water treatment, network, metering and digital operations providers can support large utility build-outs.
- **Turbine supply chain for Nordex**: Tied to Chinese competition and Nordex's cost-reduction strategy: component and logistics suppliers that lower cost per MW support a backlog of €19,341 M.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [ACCIONA Integrated Report 2025](https://www.acciona.com/content/dam/acciona-global/documentos/informes/2025-acciona-integrated-report.pdf)

Annual report · 2026-06-18

- ACCIONA is a Spanish group that develops, finances, builds, operates and owns infrastructure, water and renewable-energy assets, with 68,502 employees in more than 60 countries; 2025 revenue reached a record €20,236 M (+5.5%) and EBITDA a record €3,211 M (+31%).
- EBITDA mix 2025: ACCIONA Energía 47%, Infrastructure 25%, Nordex 23%, Other activities 5%.
- ACCIONA Energía (14.6 GW installed, 22 GW pipeline): revenue €2,925 M (-4.1%), EBITDA €1,546 M (+37.7%), of which €614 M from asset rotation; €3,200 M of divestments signed in 2024-2025; strategy shifts from capacity growth to selective growth, with 1.3 GW committed for 2026-2027.
- Infrastructure: revenue €8,690 M (+6.7%), EBITDA €801 M (+5.1%); total aggregated backlog €120,591 M (+124%), driven by concession assets (€96,898 M, +217.9%) such as the SR-400 managed lanes in Atlanta; Australia is the largest market (36% of Infrastructure revenue).
- Water had an outstanding year (revenue +16.5%, EBITDA +49.7% to €140 M) and was named preferred bidder for the Pernambuco (Brazil) water and sanitation concession, expected to add about €30,000 M of backlog.
- Nordex (47.08% owned): revenue €7,554 M, record backlog €16,094 M, 48% market share in Central Europe; contributed €749 M to ACCIONA's EBITDA.
- Balance sheet: net financial debt €6,989 M, net debt/EBITDA 2.18x (2.90x in 2024); ordinary investment €2,252 M (-19%); 98.2% of capex EU-taxonomy aligned.
- The chairman frames an infrastructure and energy investment "supercycle" and warns that Chinese wind competition "does not always occur on a level playing field".

### [ACCIONA Results Report January-June 2026](https://www.acciona.com/content/dam/acciona-global/documentos/cnmv/2026/2026-acciona-results-report.pdf)

Interim report · 2026-07-30

- H1 2026 revenue €10,142 M (+9.9%); EBITDA €1,153 M (-25.9%) because H1 2025 held €443 M of asset-rotation gains; EBITDA from operations +3.6%; attributable net profit €83 M (-84.3%).
- EBITDA split: Energy €388 M (33%), Infrastructure €384 M (33%), Nordex €354 M (30%), Other Activities €52 M (4%).
- ACCIONA Energía: captured price €54.8/MWh (-13.7%; Spain €59.3/MWh, -26.7%); 245 MW added, 763 MW under construction; July sales of 64 MW hydro (White Summit Capital) and 361 MW wind (Galp New Energies) bring about €310 M rotation EBITDA and nearly €500 M debt reduction.
- Infrastructure revenue +12.2% and EBITDA +12.0% (margin 8.6%); D&C and O&M backlog €22,429 M; Concessional Asset Backlog a record €136,050 M (+40.4%) after signing the Pernambuco water concession in Brazil.
- Nordex EBITDA €354 M (margin 9.4%), orders 4,923 MW (+9.6%), backlog €18,385 M, about 800 MW won in the United States.
- Net financial debt €8,243 M (+€1,253 M on seasonality and investment); liquidity €10,069 M; ratings BBB (low) Stable (DBRS) and BBB+ Stable (JCR).
- 2026 guidance kept: EBITDA €2,800-3,100 M, investment €2,200-2,500 M, net debt/EBITDA below 3x.

### [ACCIONA 9M 2026 Trading Statement](https://www.acciona.com/content/dam/acciona-global/documentos/informes/9m-2026-ana-trading-statement.pdf)

Interim report · 2026-11-12

- Operating performance in the first nine months of 2026 was "ahead of expectations"; ACCIONA now expects 2026 EBITDA at the upper end of €2,800-3,100 M, helped by Nordex's raised margin guidance.
- Ordinary net investment for 2026 cut to about €2,000 M (from €2,200-2,500 M); net debt/EBITDA target below 3.0x kept.
- The ~€2bn 2026 asset-rotation target will not be met, mainly because conditions for the MIP deal announced in December 2025 were not satisfied; ACCIONA, S.A. is lending ACCIONA Energía a €500 M perpetual subordinated loan to protect its rating.
- Energy: consolidated output 18,558 GWh (+3.9%), captured price €57.3/MWh (-8.1%); full-year guidance of about €1,200 M EBITDA, ~25.5 TWh and ~0.7 GW added; net debt guided to €3.25-3.50bn.
- Infrastructure: D&C and O&M backlog €22,614 M; Concessional Asset Backlog a record €141,282 M (+45.8% vs December 2025), 79 assets in 12 countries, expected to return about €64,000 M to ACCIONA over 49 years.
- ACCIONA lost the I-24 and I-285 US managed-lanes tenders but is shortlisted for I-77 South; awards of €6,596 M year to date.
- Nordex: 9M EBITDA €633 M (margin 10.6%), 2026 margin guidance raised to 11.5-12.5%; backlog €19,341 M.

### [ACCIONA H1 2026 results presentation (earnings call transcript)](https://stockanalysis.com/quote/bme/ANA/transcripts/576077-q2-2026/)

Executive talk · José Manuel Entrecanales, Chairman & CEO · 2026-07-31

- Entrecanales frames an infrastructure investment cycle driven by geopolitics and AI/electrification (global power demand up "at least 40%" in a decade); "The constraint is not demand, it is not capital", but the scarcity of bankable, execution-ready projects.
- Renewables are "an asset of national security"; storage and batteries are "where the greatest opportunity lies".
- Infrastructure backlog: €22 billion D&C/O&M plus a €136 billion concession backlog (above €140 billion with pre-awards), expected to yield €61 billion of dividends; first section of São Paulo Metro Line 6 opened; US managed-lanes platform being scaled, including the Vertical Earth acquisition.
- ACCIONA Energía CEO Arantza Ezpeleta: two Spanish disposals (~€500 M proceeds), >1 GW more in sale processes, ~€40 M annual cost savings, 2027 additions of 1,148 MW, El Romero 196 MW battery in Chile; outlook EBITDA €1.2 billion, net debt below €3 billion.
- Medium-term Energía target: 1.0-1.2 GW new capacity a year with 0.4-0.5 GW rotated.
- On selling ACCIONA Energía outright after fund interest: "it's unlikely" but "definitely a possibility".
- Nordex is "an industrial holding, not a financial holding"; Europe should protect its "few remaining champions".
- Data centre pipeline "more like over 2 GW"; 2026 group guidance reiterated (EBITDA €2.8-3.1 billion, net debt/EBITDA below 3x).

### [ACCIONA FY2025 results presentation (earnings call transcript)](https://stockanalysis.com/quote/bme/ANA/transcripts/403562-q4-2025/)

Executive talk · José Manuel Entrecanales, Chairman & CEO · 2026-02-27

- Entrecanales calls the infrastructure boom "not a cyclical rebound, but a structural shift"; 2025 EBITDA hit a record €3.2 billion (+31%), above the €2.7-3 billion target.
- 2026 guidance: group EBITDA €2.8-3.1 billion, investment cash flow €2.2-2.5 billion, net debt/EBITDA below 3x, dividend of €5.65 per share to be kept stable "with a small growth".
- ACCIONA Energía: €3.2 billion of asset rotation and about €900 million of gains since 2024; Fitch outlook moved to negative; 2026 targets ~€2 billion of disposals, ~€1.5 billion of debt reduction, ~€900 million capex, ~€35 million cost cuts, about €1.2 billion EBITDA; output target about 30 TWh by 2030.
- MacIntyre (Australia) blade damage, believed to come from transport, is the main 2026 execution task.
- Concessions: 17 projects won in 2023-2025 (€27 billion), a pipeline of about 130 greenfield opportunities worth about €300 billion, with US managed lanes the main driver.
- Nordex is "an integral part of the group"; ACCIONA will not trade stakes.
- On the rating: "I don't think maintaining the rating is critical. I think it's important." A bank has been retained to analyse options for ACCIONA Energía.

### [“Infrastructure has become critical to strategic sovereignty and social cohesion” (AGM 2026 address)](https://www.acciona.com/updates/news/infrastructure-become-critical-strategic-sovereignty-social-cohesion)

Executive talk · José Manuel Entrecanales, Chairman & CEO · 2026-06-25

- At ACCIONA's 2026 AGM, Entrecanales said infrastructure "has become critical to strategic sovereignty and social cohesion" and that "We are entering an infrastructure hypercycle".
- He cited more than US$150 trillion of global infrastructure investment over 25 years, with annual investment rising from US$4.4 trillion to US$7 trillion by 2050.
- Climate adaptation is a second driver: "Climate resilience is no longer simply an environmental consideration; it has become an economic imperative."
- 2025 strengths: record EBITDA of €3.211 billion (+31%), an infrastructure backlog above €120 billion, net debt/EBITDA 2.2x; ACCIONA Energía EBITDA above €1.5 billion.
- Growth areas named for ACCIONA Energía: energy storage, repowering and power supply for data centers.
- Integrated systems are the competitive edge: "The future belongs to infrastructure conceived as integrated systems rather than isolated assets."
- Shareholders approved a gross dividend of €5.65 per share (paid July 9, 2026) and KPMG as auditor through 2029.

## Questions about ACCIONA

### What does ACCIONA do?

ACCIONA develops, finances, builds, operates and owns infrastructure, water and renewable-energy assets, and holds 47.08% of wind turbine maker Nordex.

### What is ACCIONA's revenue?

2025 revenue was a record €20,236 M (+5.5%) with EBITDA of €3,211 M (+31%). In H1 2026 revenue was €10,142 M (+9.9%).

### How many employees does ACCIONA have?

ACCIONA had 68,502 employees at end-2025 in more than 60 countries; the average workforce for 9M 2026 was 70,515.

### Who leads ACCIONA?

José Manuel Entrecanales is chairman and CEO; Arantza Ezpeleta leads ACCIONA Energía and José Díaz-Caneja leads Infrastructure.

### What is ACCIONA's 2026 guidance?

ACCIONA expects 2026 EBITDA at the upper end of €2,800-3,100 M, ordinary net investment of about €2,000 M and net debt/EBITDA below 3.0x.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_