# Aliaxis account plan

> Aliaxis is a privately held Brussels group making plastic pipe and fitting systems in over 40 countries, with €3,542 million revenue in 2025.

## At a glance

Aliaxis SA is a privately held group based in Brussels whose shares are not listed on any regulated market. It designs and makes plastic pipe and fitting systems for fluid and energy management, sold into construction and infrastructure, with operations in over 40 countries. In 2025 revenue was €3,542 million (down 6.8% like-for-like), Recurring EBITDA €364 million (10.3% margin) and the group reported a net loss. It employed an average of 16,028 FTE in 2025. Thierry Vanlancker is Managing Director and Koen Sticker is CFO.

## Business units

- **Americas** (€1,796m of 2025 revenue): The largest segment, including North America (€1,452m of revenue in 2025) and Latin America. U.S. pipe pricing drove €170 million of the 2025 Recurring EBITDA decline. In H1 2026 revenue was €933 million (+6.4% like-for-like) with REBITDA of €200 million on partial recovery in Canada and the U.S. and the Asheville ramp-up.
- **EMEA** (€860m of 2025 revenue): European and Middle East operations. H1 2026 revenue was €414 million (+0.7%), broadly stable; the EMEA ERP rollout is still 18 to 24 months away.
- **Asia** (€449m of 2025 revenue): Essentially Ashirvad in India. H1 2026 revenue was €224 million (+3.5%).
- **Pacific** (€394m of 2025 revenue): Australia and New Zealand, disrupted by an ERP go-live in 2025. H1 2026 revenue rebounded to €254 million (+37.5% like-for-like) with REBITDA of €35 million.

## Strategic priorities

- **Horizon 2030, phase one: fixing the basics**: The five-year plan starts with the cost and asset base, processes and systems (SAP ERP, Integrated Business Planning, APS, TMS), operational excellence and performance culture; growth is the second phase.
- **Fixed-cost reset**: About €30 million taken out in 2025 toward a mid-term run-rate target of at least €125 million in fixed costs; fixed costs were down €29 million or 7% in H1 2026.
- **Cash and deleveraging**: Capex cut to €197 million in 2025, working capital targeted at the mid-50s days, leverage down from 2.5x to 2.2x by H1 2026, and a commitment to investment grade.
- **Portfolio pruning**: Divestment of non-core legacy assets (Marley Deutschland, Lenham, Querétaro, Chile, then China, Spain, Italy) to finish by end-2026; about 8% of turnover pruned overall.
- **U.S. profitability reset**: Management accepts that U.S. pipe margins will stay lower for a long period and is de-duplicating the North American network.

## Latest results

In H1 2026 (six months to 30 June 2026) revenue was €1,844 million, up 8.0% like-for-like. Recurring EBITDA rose 39.7% like-for-like to €289 million, a 15.6% margin, and net profit was €100 million. Pricing and operational measures offset higher resin and energy costs caused by the Middle East conflict; the Pacific rebounded after its 2025 ERP disruption. Net financial debt was €978 million and leverage 2.2x LTM REBITDA. Management expects H2 markets to stay challenging and unpredictable, with the pre-buy and temporary margin uplift unwinding and U.S.-Canada tariffs weighing.

## Investments and deals

- **Lower, maintenance-focused capex**: Capex fell to €197 million in 2025 and was just below €50 million in H1 2026, focused on maintenance and productivity: the Cholet six-year modernisation, the Tongeren warehouse and the Philmac factory of the future.
- **New R&D centre near Toronto**: A new €20 million R&D centre opened near Toronto, while the Elancourt research facility (hydrogen flow systems) was closed.
- **ERP and planning systems**: SAP ERP, Integrated Business Planning (certification targeted by end-2026), APS and TMS are part of fixing the basics; North America is upgrading before further rollouts.
- **Divestments**: About €70 million of disposals in 2025 (Lenham, Marley Germany); exits from China, Spain and Italy removed about €65 million of revenue in 2026.

## Challenges and risks

- **U.S. pipe margins**: Of the €186 million Recurring EBITDA decline in 2025, €170 million came from the Americas, mainly U.S. pipe pricing tied to low PVC resin prices.
- **Raw material volatility**: The Strait of Hormuz blockade from early March 2026 drove PVC prices up 10% to 40% and polyethylene/polypropylene prices 50% to 80%.
- **Operational disruptions**: Hurricane Helene at the Asheville plant and the Pacific ERP go-live cost €51 million in 2025; Asheville's total impact is put at around €130 million net of insurance.
- **Weak construction markets and tariffs**: Markets are expected to remain challenging; U.S.-Canada tariffs will weigh on H2 2026.
- **Balance sheet limits**: With leverage at 2.5x at end-2025, management said acquisitions are not possible for now and cut the dividend 50%.

## What leadership says

> "A lot of things that should be simple for our people are actually complicated in Aliaxis" — Thierry Vanlancker, Managing Director, FY2025 investor call, March 2026

> "with a certain sense of satisfaction because we had no help from the market" — Thierry Vanlancker, Managing Director, H1 2026 investor call, 3 September 2026

> "around 2% is coming from price, with the remainder coming from volume" — Koen Sticker, CFO, H1 2026 investor call, 3 September 2026


## Where a supplier can help

- **Systems and process simplification**: Tied to the Horizon 2030 fixing-the-basics priority: SAP ERP, Integrated Business Planning, APS and TMS rollouts need integration and change support, with EMEA still to come.
- **Fixed-cost reduction**: Tied to the fixed-cost reset toward at least €125 million: offers that lower overhead or shared-service cost fit the target.
- **Productivity capex in plants**: Tied to the maintenance-focused capex: the Cholet modernisation, Tongeren warehouse and Philmac factory of the future are where equipment and automation suppliers fit.
- **Resin sourcing and pricing tools**: Tied to the raw material volatility challenge: supply continuity and fast price adjustment were decisive in H1 2026.
- **Working capital reduction**: Tied to the cash priority: inventory and planning tools that move working capital toward the mid-50s days target.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Aliaxis SA Consolidated Annual Report 2025](https://aliaxis.com/wp-content/uploads/2026/03/Aliaxis_Annual-Report_2025.pdf)

Annual report · 2026-03-31

- Aliaxis SA is a privately held Brussels-based group (shares not listed on any regulated market) that designs and makes plastic pipe and fitting systems for fluid and energy management, with operations in over 40 countries and an average of 16,028 employees (FTE) in 2025.
- 2025 revenue was €3,542 million, down 9.5% reported and 6.8% like-for-like; Recurring EBITDA fell to €364 million (margin 10.3%, vs 14.1% in 2024) and recurring net profit to €50 million (down 79%); the group reported a net loss.
- Of the €186 million Recurring EBITDA decline, €170 million came from the Americas, mainly U.S. pipe pricing; one-off business events (Hurricane Helene at the Asheville plant, ERP go-live in the Pacific) cost €51 million.
- Four reportable segments: Americas (€1,796m revenue), EMEA (€860m), Asia (€449m, essentially Ashirvad in India) and Pacific (€394m); North America alone was €1,452m of revenue.
- Cash focus: capex cut to €197 million (a €109 million reduction), working capital down €198 million to €609 million (63 days), total cash flow €63 million, net financial debt €919 million, leverage 2.5x Recurring EBITDA (1.8x in 2024).
- Horizon 2030 strategy, phase one "fixing the basics": cost and asset base, processes and systems (SAP ERP, Integrated Business Planning, APS, TMS), operational excellence and performance culture; growth is the second phase.
- Portfolio pruning in 2025: divestment of Marley Deutschland (DIY), sale of the Lenham (UK) and Querétaro (Mexico) sites, exit from Chile, closure of the Elancourt research facility; a new €20 million R&D centre opened near Toronto.
- Leadership: Thierry Vanlancker is Managing Director, Koen Sticker CFO, Jan Suykens Chairperson since 6 January 2025; Colleen Pritchett became EVP North America and Travis Lutes EVP Global Enterprise Transformation (ExCom as of 1 January 2026).
- Dividend proposed at €0.473 gross per share, a 50% cut; 2026 outlook: markets expected to remain challenging with a gradual strengthening anticipated in the second half.

### [Aliaxis publishes solid H1 2026 results with improved profitability amid continued market complexity (press release)](https://aliaxis.com/wp-content/uploads/2026/09/Press_Release_Aliaxis_H1_2026.pdf)

Interim report · 2026-09-02

- H1 2026 (six months to 30 June 2026, published 2 September 2026): revenue €1,844 million, up 8.0% like-for-like and 0.2% reported.
- Recurring EBITDA €289 million, up 39.7% like-for-like from €206 million; REBITDA margin 15.6%, up 3.5 pp like-for-like; net profit €100 million, up €87 million; basic EPS €1.32.
- Pricing adjustments and operational measures offset higher resin and energy costs caused by the Middle East conflict; a cost reset programme remains on track.
- Americas: revenue €933 million (+6.4% like-for-like), REBITDA €200 million (21.5% margin) on partial recovery in Canada and the U.S., Asheville ramp-up and cost measures; Latin America kept growing volumes.
- Pacific rebounded after 2025 ERP disruptions: revenue €254 million (+37.5% like-for-like), REBITDA €35 million (13.7% margin). Asia €224 million (+3.5%), EMEA €414 million (+0.7%), broadly stable.
- Working capital €801 million (82 days), down €57 million year on year; net financial debt €978 million, up €59 million vs December on seasonality; leverage 2.2x LTM REBITDA, down 0.3x.
- Outlook: H2 markets challenging and unpredictable; pre-buy and temporary margin uplift expected to unwind; U.S.-Canada tariffs monitored.

### [Aliaxis FY2025 investor call transcript](https://aliaxis.com/wp-content/uploads/2026/03/Investor-Call-Transcript-March_VF.pdf)

Executive talk · Thierry Vanlancker, Managing Director · 2026-03-06

- FY2025 investor call (March 2026) with Managing Director Thierry Vanlancker and CFO Koen Sticker: 2025 was "a tough year" in construction and infrastructure; results have "returned to the pre-COVID period".
- The main hit was U.S. pipe margins: PVC resin prices low and flat-lining is "rather a headwind", since pipe prices track resin; competitors Orbia/Wavin, Atkore, Westlake and Fletcher also issued warnings or restructured.
- Net sales €3.5 billion (-6.8% like-for-like), REBITDA €364 million; pro forma for Asheville and the Australian ERP disruption REBITDA would have been around €415 million.
- One-offs of €151 million before tax (impairments €57m, Asheville €37m, restructuring €73m, gains/losses on disposals); Asheville's total financial impact is put at around €130 million net of insurance, with the plant back to 100% expected by summer 2026.
- Cost reset: about €30 million taken out in 2025 with a mid-term run-rate target of at least €125 million in fixed costs, returning fixed costs to their 2019 share of variable margin.
- Capex cut from €300+ million average to €197 million, with a further reduction planned; working capital to fall to the mid-50s days; divestments of non-core legacy assets to finish by end-2026.
- Balance sheet "does not allow" acquisitions for now; leverage of 2.5x seen as "the peak of the curve"; €1.1 billion liquidity headroom; commitment to investment grade; dividend cut 50%.
- 2026 planning assumes no market help; Elancourt R&D (hydrogen flow systems) closed in favour of near-term R&D such as the new IPEX centre.

### [Aliaxis H1 2026 investor call transcript](https://aliaxis.com/wp-content/uploads/2026/09/20260903_Investors-Call_Transcript_RW-Delphine.pdf)

Executive talk · Thierry Vanlancker, Managing Director · 2026-09-03

- H1 2026 investor call (3 September 2026) with Managing Director Thierry Vanlancker and CFO Koen Sticker: results delivered when "we had no help from the market"; like-for-like growth of 8%.
- Strait of Hormuz blockade from early March 2026 drove PVC prices up 10% to 40% and polyethylene/polypropylene prices 50% to 80%, with availability "touch and go" in Australia and New Zealand; Aliaxis raised prices quickly worldwide.
- REBITDA €289 million (+40% like-for-like); part of the margin gain is a temporary uplift from cheaper resin in inventory that will reverse in H2; growth split as roughly 2 points price, the rest volume.
- Fixed costs down €29 million or 7%; headquarters about 30% cheaper than before; cost reset on track (about €40 million additional delivered year to date toward a €125 million mid-term run rate).
- Capex just below €50 million in H1 versus €197 million for 2025, focused on maintenance and productivity (Cholet six-year modernisation, Tongeren warehouse, Philmac factory of the future).
- Divestments of non-core businesses (China, Spain, Italy) removed about €65 million of revenue with no profit impact; about 8% of turnover pruned overall.
- Leverage down from 2.5x to 2.2x; about €1 billion liquidity headroom with financing committed to end-2028; a phased refinancing started, aiming for lower gross debt; investment grade remains the policy.
- Safety rate improved to 3.7; IBP certification targeted by end-2026; EMEA ERP still 18 to 24 months away; U.S.-Canada tariffs will weigh on H2.

## Questions about Aliaxis

### What does Aliaxis do?

Aliaxis designs and makes plastic pipe and fitting systems for fluid and energy management, with operations in over 40 countries across the Americas, EMEA, Asia and the Pacific.

### What is Aliaxis's revenue?

Revenue was €3,542 million in 2025, down 6.8% like-for-like, and €1,844 million in H1 2026, up 8.0% like-for-like.

### How many employees does Aliaxis have?

An average of 16,028 employees (FTE) in 2025.

### What is Aliaxis's strategy?

Horizon 2030, whose first phase fixes the basics: costs, assets, processes and systems, with growth as the second phase.

### Who leads Aliaxis?

Thierry Vanlancker is Managing Director, Koen Sticker is CFO and Jan Suykens has been Chairperson since 6 January 2025.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_
