# Amprion GmbH account plan

> Amprion is one of Germany's four transmission system operators, with €6,137.3 million FY2025 revenue and a €42.1 billion 2026-2030 investment plan.

## At a glance

Amprion GmbH, based in Dortmund, runs the 220/380 kV extra-high-voltage transmission grid "From the North Sea to the Alps" and says it supplies 29 million people and a third of the German economy. Its customers are distribution system operators, energy-intensive industrial companies and power plants, and its revenue is set by a regulator-defined revenue cap. In FY2025 (IFRS) it reported external revenue of €6,137.3 million (+8.9%), adjusted EBITDA of €1,530.7 million and adjusted consolidated net income of €671.9 million, with a workforce of 3,434 FTEs at end-2025. At 30 June 2026 it was owned by the M31 consortium of mainly German insurers and pension funds (74.9%) and RWE Alkaios Holding (25.1%); after that date RWE lifted its economic stake to around 55%. Its debt is listed on the Euro MTF market in Luxembourg.

## Business units

- **Transmission System Operation (Amprion GmbH)** (about 97% of FY2025 IFRS segment revenue (€6,522.7 million)): Runs the onshore extra-high-voltage grid under incentive regulation, earning grid fees and grid connection revenue (€4,402.0 million in 2025) and system services revenue (€1,095.6 million). It carries the large onshore DC projects A-Nord, Ultranet, Corridor B and the Rhine-Main Link, and invested €3,638.4 million in 2025. All Group employees work here; operations were reorganised as an independent division on 1 November 2025.
- **Offshore Grid Connections (Amprion Offshore GmbH)** (about 3% of FY2025 IFRS segment revenue (€211.4 million, almost all intra-group)): Builds, owns and leases within the Group the offshore grid connection systems, with costs recovered through the offshore grid levy. Projects include DolWin4 and BorWin4 (scheduled to go into operation in 2028), BalWin1 and BalWin2. It invested €1,807.6 million in 2025 and plans around €16,800 million to 2030 for ten offshore grid connections; it has no staff of its own.

## Strategic priorities

- **Finishing the DC electricity highways**: Ultranet is due in December 2026 and A-Nord fully in 2027; the CEO says the two lines will cut redispatch costs by 700 million euros from 2027.
- **Delivering the 2026-2030 investment programme**: €42.1 billion of investment to 2030: around €25,400 million onshore at Amprion GmbH and around €16,800 million at Amprion Offshore GmbH. The 2026 capex target is around €7.4 billion (€4.3 billion onshore, €3.1 billion offshore).
- **Funding a 6 to 6.5 billion euro yearly debt need**: About 60% of the 42 billion euros is to be financed with debt, about 25% with equity and about 15% internally. The bond programme was raised to €25.0 billion and Amprion is considering issuing in Australian dollars, Swiss francs or sterling.
- **A competitive regulatory return**: BNetzA plans a WACC-based return on capital, with the final TSO framework expected in Q3 2026; the CFO wants a return "at least at the average of the European continent".
- **Managing scarce grid connections**: Amprion has given 70 GW of connection commitments against a peak load of 27 GW, with 35 GW to be actually connected by end-2029; the CEO wants government and lawmakers to set priorities.
- **System stability**: Five new grid-stabilising installations were commissioned in 2025 (16 in total), with five to seven more planned every year.

## Latest results

In H1 2026 (IFRS) external revenue fell 10.9% to €2,748.8 million and consolidated net income fell to €290.8 million (H1 2025: €522.8 million), reflecting a lower revenue cap and higher interest costs. HGB net income of Amprion GmbH, the steering KPI, rose 23.8% to €352.7 million on higher capital-cost income from investment. H1 investment was €1,944.2 million (IFRS). Full-year 2026 HGB net income guidance was raised to €680-760 million (from €600-690 million), and the around €7.4 billion capex target was confirmed. The workforce reached 3,595 FTEs at 30 June 2026, with the year-end target trimmed to 3,800 FTEs.

## Investments and deals

- **Record 2025 investment**: €5,446.1 million (IFRS) invested in 2025: €3,638.4 million in Transmission System Operation and €1,807.6 million in Offshore Grid Connections; the regulated asset base reached about €16.5 billion.
- **Onshore HVDC projects**: A-Nord, Ultranet, Corridor B (710 km HVDC), Rastede-Bürstadt DC34, Ovelgönne-Marxheim DC35 and the Rhine-Main Link (four bundled projects, four converters).
- **Offshore grid connections**: DolWin4 and BorWin4 (in operation 2028), BalWin1 and BalWin2, around €3,200 million of offshore investment in 2026.
- **Equity and debt raised**: €2,200.0 million shareholder equity injection (December 2025), €2.6 billion triple-tranche green bond (January 2026), first green hybrid bond of €1.0 billion (April 2026) and a syndicated loan raised to €6,500.0 million with 15 core banks.
- **Grid innovation**: Decentralised grid booster with LEW Verteilnetz and E.ON (250 MWh of battery storage, contracts signed 10 December 2025) and the KuPilot curative redispatch pilot in Emsland (200 MW).

## Challenges and risks

- **Regulation and legislation risk**: Rated the highest risk class ("High"); appeals on equity returns were dismissed by the Higher Regional Court of Düsseldorf on 29 October 2025 and have been taken to the Federal Court of Justice.
- **Rating pressure**: Moody's downgraded Amprion to Baa2 (stable) on heavy investment and pressure on cash-flow metrics; the equity ratio fell to 32.6% at 30 June 2026 from 36.8%.
- **Redispatch and balancing costs**: Balancing-power costs rose approximately 54% in 2025, and the CEO expects redispatch price effects if wholesale prices stay high as the Iran war goes on.
- **Skilled-labour shortage**: End-2025 headcount was 5.7% below forecast because of the skilled-labour shortage.
- **Project delivery and cyber risk**: Project delays and cost overruns are rated medium risk; NIS 2 makes TSOs "particularly important entities" for IT and cyber security.

## What leadership says

> "The Ultranet and A-Nord lines alone will lower redispatch costs by 700 million euros from 2027" — Dr Christoph Müller, CEO, FY2025 results press conference, reported by ZfK, 2026-04-01 (translated from German)

> "Grid connections are a scarce good, so we must use this resource efficiently" — Dr Christoph Müller, CEO, FY2025 results press conference, reported by ZfK, 2026-04-01 (translated from German)

> "financing on such a scale is not a sure-fire success!" — Peter Rüth, CFO, CFO interview in the Amprion Financial Report 2025, 2026-04-01

> "In the end we need a regulatory return that is at least at the average of the European continent" — Peter Rüth, CFO, Börsen-Zeitung interview, 2026-10-12 (translated from German)


## Where a supplier can help

- **HVDC and offshore project delivery**: The €42.1 billion investment programme and the ten offshore grid connections create demand for construction, cable, converter and project-control capacity, especially with project delays and cost overruns rated a medium risk.
- **Recruiting and workforce tools**: Headcount ended 2025 below forecast because of the skilled-labour shortage; recruiting, training and productivity offers tie directly to the 3,800 FTE year-end 2026 target.
- **Treasury and capital-markets services**: A 6 to 6.5 billion euro yearly debt need and plans to issue in new currencies open room for treasury, hedging and investor-relations support.
- **Grid stability and flexibility solutions**: Five to seven new grid-stabilising installations a year, the battery-based grid booster and rising redispatch costs point to demand for storage, voltage-control and congestion-management technology.
- **Cyber security for critical infrastructure**: NIS 2 classifies TSOs as "particularly important entities", making security services and compliance tooling relevant to Amprion's IT and cyber risk.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Amprion Financial Report 2025](https://www.amprion.net/Dokumente/Amprion/Geschaeftsberichte/2025/Amprion_Financial-Report-2025.pdf)

Annual report · 2026-04-01

- Amprion GmbH (Dortmund) is one of Germany's four transmission system operators (TSOs), running the 220/380 kV extra-high-voltage grid "From the North Sea to the Alps"; it says it supplies 29 million people and a third of the German economy, and is the only German TSO coordinating the security of the European interconnected grid (more than 500 million people connected).
- FY2025 (IFRS): external revenue €6,137.3 million (+8.9%), EBITDA €2,147.0 million, adjusted EBITDA €1,530.7 million, consolidated net income €1,109.0 million and adjusted consolidated net income €671.9 million (+72.1%); HGB net profit of Amprion GmbH €641.6 million (+68.2%), well above the €440-530 million guidance.
- Record investment of €5,446.1 million (IFRS; +around 32%): €3,638.4 million in Transmission System Operation and €1,807.6 million in Offshore Grid Connections. Regulated asset base about €16.5 billion (previous year €11.7 billion).
- Investment programme 2026-2030: €42.1 billion (around €25,400 million onshore at Amprion GmbH, around €16,800 million at Amprion Offshore GmbH, including ten offshore grid connections); 2026 capex forecast €7,300 million; 2026 HGB net profit guidance €600-690 million.
- Flagship projects: Ultranet and A-Nord (A-North) DC "electricity highways" (each around 2,000 MW) due in 2026 and 2027, Corridor B (710 km HVDC), Rhine-Main Link, DolWin4/BorWin4 (in operation 2028), BalWin1/BalWin2.
- Financing: €2,200.0 million shareholder equity injection (Dec 2025), €2.5 billion of green bonds in 2025 (outstanding bonds €8,400 million), €2.6 billion triple-tranche green bond in January 2026; DIP raised to €25.0 billion; ratings Baa1 (negative) Moody's and BBB+ (stable) Fitch.
- Owners: M31 consortium of mainly German insurers and pension funds (74.9%) and RWE Alkaios Holding (25.1%, indirectly RWE and Apollo). Workforce 3,434 FTEs (+11.2%), target 3,891 FTEs by end-2026.
- Main risks: regulation and legislation rated "High" (equity return, BNetzA's new WACC-based TSO framework expected Q3 2026); CFO Peter Rüth says Germany lags "behind international standards significantly when it comes to return on equity".

### [Amprion Half-Year Financial Report 2026](https://www.amprion.net/Dokumente/Amprion/Gesch%C3%A4ftsberichte/2026/Amprion_Half-Year-Financial-Report-2026.pdf)

Interim report · 2026-08-20

- H1 2026 (IFRS): external revenue €2,748.8 million (-10.9%), EBIT €618.7 million (H1 2025: €850.2 million), consolidated net income €290.8 million (H1 2025: €522.8 million); the drop reflects a lower revenue cap (grid fees €1,913.8 million vs €2,187.1 million) and higher interest costs.
- HGB net income of Amprion GmbH, the steering KPI, rose 23.8% to €352.7 million on higher capital-cost income from investment; full-year 2026 HGB guidance raised to €680-760 million (from €600-690 million).
- Investment: €1,944.2 million (IFRS) in H1, of which €1,193.5 million Transmission System Operation and €750.7 million Offshore Grid Connections; HGB capex €2,012.7 million; full-year target of around €7.4 billion confirmed (€4.3 billion onshore, €3.1 billion offshore).
- Funding: €2.6 billion green triple-tranche bond (January), first green hybrid bond of €1.0 billion (April, 50% equity credit), outstanding bonds €12,000.0 million; syndicated loan refinanced and raised to €6,500.0 million.
- Moody's downgraded Amprion one notch to Baa2 (stable) on heavy investment and pressure on cash-flow metrics; Fitch kept BBB+ stable. Equity ratio fell to 32.6%.
- Workforce 3,595 FTEs at 30 June 2026; year-end target trimmed to 3,800 FTEs (from 3,891).
- After the balance sheet date RWE acquired further indirect shares, lifting its economic stake in Amprion to around 55%.
- Policy backdrop: capacity market law (StromVKG, 11 GW of tenders planned for 2026), draft BBPlG move away from underground cabling for new HVDC projects, NEP 2037/2045 approval expected Q4 2026.

### [Amprion warnt vor steigenden Redispatch-Kosten durch Iran-Krieg (FY2025 results press conference, ZfK)](https://www.zfk.de/energie/strom/redispatch-kosten-iran-krieg-amprion-netzpaket)

Executive talk · Dr Christoph Müller, CEO · 2026-04-01

- At the FY2025 results press conference in Dortmund, CEO Christoph Müller warned that redispatch costs could rise if wholesale prices stay high or climb as the Iran war goes on.
- Relief should come from the big DC projects: Müller said Ultranet and A-Nord alone will cut redispatch costs by 700 million euros from 2027; Ultranet is due in December 2026 and A-Nord fully next year.
- Grid build 2025: around 320 km of new lines (50% more than the previous year), work on 1380 km, record investment of 5.4 billion euros; around 42 billion planned to 2030.
- Grid connections: Amprion has given 70 GW of connection commitments against a peak load of 27 GW, with 35 GW to be actually connected by end-2029. Müller wants government and lawmakers to set priorities, and proposes regionally differentiated construction-cost contributions for generators.
- System stability: five new grid-stabilising installations commissioned in 2025 (16 in total), with five to seven more planned every year.
- CFO Peter Rüth called for regulation "comparable on a European scale"; the article reports that Germany's equity return currently sits in the lower European midfield.
- Figures quoted: revenue up about 9% to about 6.1 billion euros, adjusted EBITDA about 1.5 billion (+25%), adjusted profit up 72% to 672 million, regulated asset base about 16.5 billion.

### [Hoher Investitionsbedarf zwingt Amprion zu breiterer Finanzierung (Interview Peter Rüth, Börsen-Zeitung)](https://www.boersen-zeitung.de/unternehmen-branchen/hoher-investitionsbedarf-zwingt-amprion-in-finanzierung-zu-breiterer-aufstellung)

Executive talk · Peter Rüth, CFO · 2026-10-12

- CFO Peter Rüth (Börsen-Zeitung interview, October 2026) explains how Amprion will fund 42 billion euros of investment to 2030: about 60% debt, about 25% equity and about 15% internal financing, with internal financing rising sharply a decade out as projects start earning.
- Amprion expects to raise 6 to 6.5 billion euros of debt every year in the coming years; the bond programme was raised from 9 to 25 billion euros.
- First green hybrid bond (April 2026, two tranches, 1 billion euros total) diversifies funding and counts 50% as equity for ratings; the spread over senior bonds was 90 to 105 basis points. Rüth says it was unrelated to the Moody's downgrade; Baa2 is "a solid rating".
- The syndicated credit line, now green, doubled from 3.2 to 6.5 billion euros and the bank group grew from 8 to 15 core banks, adding BNP Paribas, Crédit Agricole, Sumitomo, Royal Bank of Canada, Goldman Sachs, Bank of America and Deutsche Bank.
- Amprion is considering issuing in Australian dollars, Swiss francs or sterling (medium-term) to relieve its euro senior bond curve; large US and UK asset managers are now in its investor base.
- Ownership: German pension funds that invested in 2011 are reducing; RWE again holds an indirect majority with a public commitment to 2031. Rüth insists Amprion stays an Independent Transmission Operator, "financially, organisationally and operationally completely independent".
- Rüth calls for a regulatory return "at least" at the European average, given that Germany invests the most in the energy transition.

## Questions about Amprion GmbH

### What does Amprion do?

Amprion is one of Germany's four transmission system operators, running the 220/380 kV extra-high-voltage grid from Dortmund. It also builds offshore grid connections through Amprion Offshore GmbH.

### What is Amprion's revenue?

In FY2025 Amprion reported external revenue of €6,137.3 million (IFRS), up 8.9%. In H1 2026 external revenue was €2,748.8 million.

### How many employees does Amprion have?

Amprion had 3,434 FTEs at end-2025 and 3,595 FTEs at 30 June 2026, with a year-end 2026 target of 3,800 FTEs.

### How much is Amprion investing?

Amprion plans €42.1 billion of investment over 2026-2030, with around €7.4 billion targeted for 2026.

### Who leads Amprion?

Dr Christoph Müller is CEO, Peter Rüth CFO, Dr Hendrik Neumann CTO and, from 1 March 2026, Katrin Hilmer COO.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_