# AURA-AERO account plan

> Aura Aero is a Toulouse maker of electric and hybrid aircraft and a MALE drone, founded in 2018: about 250 employees, €340 million raised.

## At a glance

Aura Aero, based at Toulouse-Francazal Airport, was founded in 2018 by three former Airbus engineers, Jérémy Caussade, Fabien Raison and Wilfried Dufaud. It designs and builds the Integral two-seat trainers (including the all-electric Integral E), the 19-seat hybrid-electric ERA regional aircraft and, through its defence unit Aura M, the ENBATA MALE drone. Its customers are flying schools, regional airlines and armed forces. It has about 250 employees, and its €50 million Series B in April 2026 brought total funding, including grants and Florida state support, to €340 million. It joined the French Tech Next40 on 15 June 2026 and took over VoltAero's assets on 23 June 2026.

## Business units

- **Integral (trainers)**: Two-seat aircraft for pilot training, aerobatics and leisure: the Integral R, EASA-certified in December 2024, with three delivered last year and production to stabilise at one a month; the Integral S in certification; and the all-electric Integral E, whose certification moved to the end of 2027. Aura Aero is talking to several air forces about the certified trainer.
- **ERA (regional aircraft)**: A 19-seat hybrid-electric regional aircraft for poorly served regional routes, with more than 700 purchase intentions and about twenty firm orders (Pan Européenne Air Service, Air Atlantique). First flight is planned end 2027 and market entry in 2030, at an expected price of €10 to €15 million.
- **Aura M (defence)**: Defence unit led since 1 October 2025 by General (2S) Stéphane Mille, former Chief of Staff of the French Air and Space Force. It develops the ENBATA MALE drone (up to 55 hours endurance, ITAR-free, first flight targeted for autumn 2026) and a dual-use ERA; no operational order is confirmed.
- **Cassio 330 (from VoltAero)**: A five-seat aircraft, extendable to twelve, taken over with VoltAero's assets, filling the gap between Integral and ERA; its EASA certification file restarts from the base, with no stabilised timetable.

## Strategic priorities

- **Fly the ERA prototype**: First flight of the hybrid-electric ERA in late 2027, with three to four prototypes for certification and entry into service by the end of the decade; the company wants to confirm its first 50 firm orders by year end.
- **Ramp up Integral production**: Stabilise Integral R output at one a month, obtain Integral S EASA certification and certify Integral E by the end of 2027.
- **Build defence with ENBATA**: Fly the ITAR-free ENBATA MALE drone, backed by a DGA grant agreement and a Thales partnership for its AirMaster C AESA radar.
- **Industrialise in France and the U.S.**: Build the Toulouse-Francazal factory, operational by 2028, and the ERA plant at Daytona Beach, Florida, planned for 2028.
- **Raise more capital**: A second tranche is being negotiated to reach 500 million, with more equity and financing for the French plant to follow.

## Investments and deals

- **Series B round**: €50 million in April 2026, led by Safran Corporate Ventures with the French Tech Souveraineté fund (Bpifrance), the EIC Fund, Blast, Innovacom, Florida Opportunity Fund and EDF; total funding reached €340 million.
- **Toulouse-Francazal factory**: Building permit secured in March 2026 for a 40,000 m² plant targeting 150 aircraft a year and 1,600 jobs at full rate; groundbreaking planned for the second half of 2026.
- **Daytona Beach plant**: A hangar opened in October 2025 on the Embry-Riddle campus ahead of a 46,450 m² plant planned for 2028, funded with Space Florida's support.
- **VoltAero assets**: On 23 June 2026 the La Rochelle court validated Aura Aero's offer for VoltAero's assets: the Rochefort plant, hybrid patents, the HPU 210 module, the Cassio S demonstrator and the Cassio 330 programme, without its debts.

## Challenges and risks

- **Four programmes at once**: ERA, ENBATA, Integral S deliveries and Cassio 330 certification are all in a critical phase, with heavy hiring ahead.
- **Certification delays**: Integral E certification slipped from 2026 to the end of 2027, and the Cassio 330 certification file restarts from the base.
- **Florida delivery obligations**: The Florida money creates delivery obligations on US soil.
- **Workforce scale-up**: The Toulouse-Francazal site is expected to employ 1,500 to 1,600 people, against about 200 employees in April 2026.

## What leadership says

> "We are building much more than just airplanes: we are building a new European industrial player." — Jérémy Caussade, President and co-founder, Series B press release, 8 April 2026

> "Sticking to the plan – that is our strongest asset." — Jérémy Caussade, CEO and co-founder, AIN, Series B article, 14 April 2026

> "are no longer just prospects, they are realities" — Antoine Blin, Chief of Staff, Series B press release, 8 April 2026


## Where a supplier can help

- **Factory equipment and construction**: The Toulouse-Francazal and Daytona Beach plants, both due by 2028, need tooling, assembly equipment, facility systems and construction partners.
- **ERA supply chain**: With the ERA first flight in late 2027 and a metal fuselage production contract being allocated, aerostructure, avionics and propulsion suppliers have an entry point.
- **Recruiting at scale**: Growing from about 250 employees toward 1,600 jobs at full rate calls for recruiting, onboarding and training partners.
- **Certification support**: Integral S, Integral E and Cassio 330 certification files point to demand for certification engineering, testing and quality-management services.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Aura Aero, nouveau champion de l'aviation de demain (L'Essentiel de l'Éco)](https://lessentieldeleco.fr/7570-aura-aero-nouveau-champion-de-laviation-de-demain/)

Report · 2026-06-25

- Toulouse aircraft maker founded in 2018 by three former Airbus engineers (Jérémy Caussade, Fabien Raison, Wilfried Dufaud); about 250 employees; civil and military (Aura M) catalogue.
- Range: Integral R two-seater (EASA-certified December 2024, deliveries since April 2025), Integral S (availability announced for July 2026), all-electric Integral E (first flight 3 December 2024, deliveries targeted early 2027), the 19-seat hybrid ERA (first flight end 2027, market 2030) and the ENBATA MALE drone (first flight autumn 2026).
- ERA traction: more than 700 purchase intentions and about twenty firm orders (Pan Européenne Air Service 2 March 2026, Air Atlantique 10 June 2026); stated commercial potential above twelve billion dollars.
- June 2026: entered the French Tech Next40 (15 June), Thales partnership for ENBATA's AirMaster C AESA radar (16 June), took over VoltAero's assets after its liquidation (23 June): Rochefort plant, hybrid patents, HPU 210 module, Cassio S demonstrator, Cassio 330 programme.
- Funding: €50 million Series B in April 2026 (Safran Corporate Ventures, EDF, EIC Fund, Innovacom, Florida Opportunity Fund, Bpifrance, Blast), about €120 million of grants and $200 million from Space Florida; about €340 million secured, a second tranche being negotiated to reach 500 million.
- Industrial footprint: 40,000 m² Toulouse-Francazal plant (150 aircraft a year, 1,600 jobs at full rate), Rochefort research site, Daytona Beach (Florida) hangar opened October 2025 ahead of a 46,450 m² plant planned for 2028.
- Risks named: four programmes in critical phase at once, a Cassio 330 certification file to restart, obligations tied to the Florida money.

### [AURA AERO scales up: Series B completed, first firm orders, and two industrial sites to be built in France and the U.S.](https://www.aura-aero.com/en/actualites/nouvelle-lev%C3%A9e-de-fonds-de-50-m%E2%82%AC)

Report · 2026-04-08

- New €50 million funding round (Series B), with French and European grants and Florida state support, brings AURA AERO's total funding to €340 million.
- Investors: French Tech Souveraineté fund (managed by Bpifrance for the French government), EIC Fund, Safran Corporate Ventures, Blast, Innovacom, Florida Opportunity Fund and EDF Group.
- Three priorities funded: first flight of the ERA hybrid-electric regional aircraft, ramping up INTEGRAL production, and expanding drone operations with ENBATA.
- Commercial traction for ERA: over 700 purchase intentions and 20 firm orders.
- Industrial base: building permit secured for the Toulouse-Francazal factory; a 16-hectare plot opened at Daytona Beach International Airport for ERA's American factory, funded with Space Florida's support.
- Targets three "world firsts": first flight of a hybrid-electric regional commercial aircraft (ERA), first CS-23 certification of a 100% electric aircraft (INTEGRAL E), first flight of an ITAR-free MALE drone (ENBATA).
- Round led by Chief of Staff Antoine Blin; more equity and financing for the French plant to follow.

### [Aura Aero Secures €50 million in Series B Funding Round (AIN)](https://www.ainonline.com/aviation-news/futureflight/2026-04-13/aura-aero-secures-additional-eu50-million-series-b-round)

Executive talk · Jérémy Caussade, CEO and co-founder · 2026-04-14

- €50 million Series B led by Safran Corporate Ventures takes total money raised to €340 million; €170 million grant from the State of Florida for the Daytona Beach factory.
- Use of funds: ERA first flight in late 2027, Integral production ramp-up, development of the Enbata drone.
- Integral: three Integral R delivered last year, production to stabilise at one a month by July; Integral S EASA certification expected by end of September; Integral E certification pushed from 2026 to end 2027 to integrate the latest battery cells.
- ERA: about 700 purchase intentions, over 20 firm orders, aim to confirm the first 50 by year end; Caussade: "Sticking to the plan – that is our strongest asset."
- Toulouse-Francazal factory permit March 2026, operational by 2028, 100 ERA and 50 Integral a year at full capacity in 2035, 1,500-1,600 staff versus about 200 today.
- ERA expected to cost €10 to €15 million when it enters service around the end of the decade.

### [Aura Aero targeting defense sector as civilian platforms progress (AIN)](https://www.ainonline.com/aviation-news/defense/2026-03-25/aura-aero-targeting-defense-sector-civilian-platforms-progress)

Executive talk · Jérémy Caussade, CEO and co-founder · 2026-03-25

- Aura Aero has launched Aura M, a military business unit: a dual-use version of the 19-seat ERA (shown as Intruder at IDEX Abu Dhabi in February 2025, possibly uncrewed) and the Enbata MALE drone, first flight later this year.
- Caussade: defence was always planned but hard to finance before the 2022 invasion of Ukraine; hiring General Stéphane Mille as chief defense officer is a "strong signal".
- Civil ERA and the all-electric Integral E remain the priority; defence contracts "could be a way to get stronger, sooner".
- Talks with several air forces about the certified Integral trainer; a production site in Abu Dhabi is still under consideration.
- Building permit received for a Toulouse-Francazal manufacturing complex for ERA, Enbata and Integral E.
- ERA prototype first flight late next year; metal fuselage production contract being allocated, wings built in-house (first samples by year end), three to four prototypes for certification and service entry by end of decade; first firm ERA contract signed early March.

## Questions about AURA-AERO

### What does Aura Aero do?

Aura Aero designs and builds aircraft in Toulouse: Integral two-seat trainers, the 19-seat hybrid-electric ERA regional aircraft and, through Aura M, the ENBATA MALE drone.

### How much funding has Aura Aero raised?

Its €50 million Series B in April 2026 brought total funding, including French and European grants and Florida state support, to €340 million.

### How many employees does Aura Aero have?

About 250 employees in June 2026.

### Who leads Aura Aero?

Co-founder Jérémy Caussade is President and CEO and co-founder Fabien Raison is COO; General (2S) Stéphane Mille leads the defence unit Aura M.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_
