# BHP account plan

> BHP is a global miner of copper, iron ore, coal and potash, with FY2026 revenue of US$58,760M and 84,309 employees and contractors.

## At a glance

BHP mines and sells copper, iron ore and steelmaking and energy coal, and is building the Jansen potash mine in Canada, from large, long-life, low-cost assets mainly in Australia and Chile. It runs the full chain from exploration and development through mining, processing and logistics to centralised sales and marketing. In the year ended 30 June 2026 revenue was US$58,760M, Underlying EBITDA US$32,947M and attributable profit US$9,833M. It had 84,309 employees and contractors globally, including 44,254 in Australia and 30,892 in Chile. Brandon Craig became CEO on 1 July 2026.

## Business units

- **Copper** (about 49% of FY2026 Group revenue (US$29,031M)): Escondida and Pampa Norte in Chile, Copper South Australia (Olympic Dam, Carrapateena, Prominent Hill) and stakes in Antamina, Resolution and Vicuña. FY2026 production was 1,953 kt and Underlying EBITDA US$18,187M at a 70% margin, more than half of the Group for the first time. Jessica Farrell leads the Americas and Geraldine Slattery Copper South Australia.
- **Iron Ore** (about 41% of FY2026 Group revenue (US$23,883M)): Western Australia Iron Ore, with five mines, more than 1,000 km of rail and port facilities at Port Hedland, plus 50% of Samarco in Brazil. WAIO produced a record 257 Mt (BHP share) and has been the lowest-cost major producer for seven years. Led by Geraldine Slattery, President Australia.
- **Coal** (about 10% of FY2026 Group revenue (US$5,590M)): BHP Mitsubishi Alliance (five steelmaking coal mines in Queensland's Bowen Basin) and New South Wales Energy Coal (Mt Arthur, mining to cease in June 2030). Segment Underlying EBITDA was US$832M and ROCE 0%.
- **Potash**: The Jansen project in Saskatchewan: Stage 1 (4.15 Mtpa) is 84% complete with first production mid-CY2027, and Stage 2 (4.36 Mtpa) is 16% complete. BHP expects Jansen to supply around 10% of global potash at margins above 60%.
- **Western Australia Nickel**: Temporarily suspended since December 2024, with an Underlying EBITDA loss of US$255M in FY2026. BHP will review the suspension by February 2027 and is assessing a potential divestment.

## Strategic priorities

- **Accelerate operating performance**: The BHP Operating System plus faster technology and AI adoption; the CEO targets a company-wide Operational Excellence Index of 65 and technology-driven EBITDA beyond US$650 million by the end of 2027.
- **Programmatic copper growth**: Around 50% growth by the mid-2030s to around 2.5 Mtpa of attributable copper equivalent, through the Escondida New Concentrator, Copper South Australia expansion, Vicuña and Spence projects.
- **Grow WAIO to more than 305 Mtpa**: WAIO targets >305 Mtpa (100% basis) by Q4 FY2028 via the sixth car dumper, rail productivity, autonomous haulage and the Ministers North mine.
- **Deliver Jansen potash**: Stage 1 first production mid-CY2027 at US$8.4bn; each stage is expected to bring around US$1 billion of EBITDA per year once ramped up.
- **Unlock capital**: A US$10bn capital unlock target, with ~US$6.5bn done in nine months, including the Antamina silver stream (US$4.3bn upfront) and the WAIO power deal with GIP.
- **Decarbonisation**: Renewables supplied 80% of electricity at operated assets and operational GHG emissions were down 33% on the FY2020 baseline.

## Latest results

In FY2026 (year ended 30 June 2026), revenue rose to US$58,760M from US$51,262M and Underlying EBITDA to US$32,947M from US$25,978M, driven by a copper realised price of US$5.74/lb against US$4.25/lb. Attributable profit was US$9,833M after a US$2.3bn Jansen impairment, and the full-year dividend was US$8.7bn. Net debt was US$8,694M. FY2027 guidance is copper of 1,650-1,800 kt (lower on Escondida grade decline), WAIO 253-264 Mt and BMA 18.5-20.5 Mt, with capex of around US$11bn a year over the medium term.

## Investments and deals

- **Escondida New Concentrator**: US$5.4-6.3bn for 230-270 ktpa capacity, FID expected CY2027-2028, with around US$500 million of pre-commitment funding approved.
- **Jansen potash Stage 1 and 2**: Stage 1 at US$8.4bn and Stage 2 at ~US$6.9bn, first production late FY2031.
- **Vicuña copper project**: 50% with Lundin Mining, granted RIGI status with 40 years of fiscal stability; Stage 1 FID potentially by end CY2026.
- **Ministers North and Spence projects**: Ministers North (~US$0.9bn, ~20 Mtpa, first ore FY2029) and the Spence Concentrator Upgrade Recovery and Chalcopyrite Leaching projects were approved in June 2026.
- **Portfolio moves**: Carajás divestment completed on 2 April 2026 and San Manuel transferred to Faraday Copper for an equity interest.

## Challenges and risks

- **Escondida grade decline**: Feed grade fell to 0.90% and is guided to ~0.70% in FY2027, cutting Escondida output to 1,000-1,100 kt.
- **Major project delivery**: Jansen Stage 1 costs were raised to US$8.4bn and the CEO says Jansen has shown the need to improve major project performance.
- **Queensland coal royalties**: BHP says Queensland's royalty regime is not supportive of long-term investment in steelmaking coal, and coal segment ROCE was 0%.
- **Input cost inflation**: High sulphuric acid and diesel prices drove 40% of the increase in copper cost guidance; the Middle East conflict affects diesel and other inputs.
- **Safety and operational events**: A contractor died at BMA's Peak Downs in July 2026, and a conveyor failure at Carrapateena will cost up to eight weeks of production.

## What leadership says

> "The only acceptable number is zero, and we are not there yet." — Brandon Craig, Chief Executive Officer, FY2026 results presentation, 18 August 2026

> "The frank assessment is that our initial results are encouraging, but I think the runway is long." — Brandon Craig, Chief Executive Officer, FY2026 results Q&A, 18 August 2026, on technology

> "A key feature of our copper growth program is that we expect it to be self-funding." — Vandita Pant, Chief Financial Officer, BHP Annual Report 2026, August 2026

> "BHP is in great shape and well placed to seize the opportunities ahead." — Ross McEwan, Chair, BHP Annual Report 2026, August 2026


## Where a supplier can help

- **AI and process optimisation**: The push for faster technology adoption, including AI models on the Spence concentrator, fits suppliers of process analytics, AI and integrated pit-to-port software.
- **Project delivery capability**: The lessons from Jansen and four concurrent copper projects create demand for project controls, contractor integration and construction management services.
- **Input cost reduction**: High diesel and sulphuric acid costs point to energy, fuel efficiency, electrification (such as battery-electric haul trucks) and reagent suppliers.
- **Autonomy and rail productivity at WAIO**: The >305 Mtpa target relies on autonomous haulage and the Rail Technology Program, an opening for automation and rail technology vendors.
- **Safety and asset reliability**: The Peak Downs fatality and the Carrapateena conveyor failure make safety systems, maintenance and reliability services relevant.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [BHP Annual Report 2026 (year ended 30 June 2026)](https://www.bhp.com/-/media/documents/investors/annual-reports/2026/260818_bhpannualreport2026.pdf)

Annual report · 2026-08-18

- BHP is a global resources company with large, long-life, low-cost assets in copper, iron ore, steelmaking and energy coal, with potash (Jansen, Canada) coming and nickel suspended. It calls itself the world's largest copper producer and WAIO the world's lowest-cost major iron ore producer for the seventh year. 84,309 employees and contractors; total economic contribution US$50.8bn.
- FY2026 (year to 30 June 2026): revenue US$58,760M (+15%), Underlying EBITDA US$32,947M (+27%, margin almost 60%), underlying attributable profit US$13,204M, attributable profit US$9,833M after a US$3.4bn exceptional loss (US$2.3bn Jansen impairment, US$1.1bn Samarco). Free cash flow US$9.8bn (+83%); net debt US$8.7bn; underlying ROCE 26.1%.
- Copper contributed more than half of Group Underlying EBITDA for the first time: Copper revenue US$29,031M, EBITDA US$18,187M at a 70% margin; production 1,953 kt (-3%); average realised copper price US$5.74/lb (FY2025: US$4.25/lb).
- Iron Ore revenue US$23,883M, EBITDA US$14,529M; record 265 Mt production; WAIO unit cost US$19.66/t. Coal revenue US$5,590M, EBITDA US$832M.
- Dividends of 172 US cents a share (US$8.7bn, 66% payout), above the 50% minimum of the Capital Allocation Framework. US$6.3bn of capital unlocked via the Antamina silver stream (US$4.3bn) and a WAIO power deal with GIP (US$2bn).
- Growth: copper-equivalent production growth of ~3-4% a year FY2027-FY2035, ~5% a year in copper; attributable copper to ~2 Mtpa (~2.5 Mtpa CuEq) by FY2035. Capex expected around US$11bn a year over the medium term, more than half for copper.
- Projects: Escondida New Concentrator (US$5.4-6.3bn, FID CY2027-2028), Copper South Australia expansion, Vicuña Stage 1 FID as early as end CY2026, Jansen Stage 1 84% complete (US$8.4bn, first potash mid-CY2027), Jansen Stage 2 at US$6.9bn; WAIO to >305 Mtpa by Q4 FY2028.
- Leadership: Brandon Craig succeeded Mike Henry as CEO on 1 July 2026; Ross McEwan is Chair; Vandita Pant CFO. Craig's three pillars: accelerating performance (BHP Operating System plus technology/AI), disciplined programmatic growth, strengthening foundations.
- Risks named: operational events and safety (a contractor fatality at Peak Downs in July 2026), cybersecurity, Middle East conflict disrupting diesel, ammonia and supply chains, US-China trade tensions and tariffs, Queensland coal royalties, Samarco liabilities, Jansen cost overruns.

### [BHP Operational review for the year ended 30 June 2026](https://www.bhp.com/-/media/documents/media/reports-and-presentations/2026/260716_bhpoperationalreviewfortheyearended30june2026.pdf)

Interim report · 2026-07-16

- Headline: "Record iron ore and ~2 Mt copper production, disciplined cost performance and strengthened growth pipeline" for FY26, the first release under CEO Brandon Craig.
- Copper 1,952.8 kt (-3%) within FY26 guidance of 1,900-2,000 kt; Escondida 1,261.2 kt; Spence 212.6 kt (-21%); Copper South Australia 320.7 kt (+2%); Antamina record 151.5 kt (+27%). FY27 copper guidance 1,650-1,800 kt on Escondida grade decline.
- Iron ore a record 264.7 Mt (+1%), WAIO 256.9 Mt (291.2 Mt on 100% basis); FY27 guidance 260-272 Mt. BMA steelmaking coal 18.6 Mt (+3%), NSWEC energy coal 16.4 Mt (+9%).
- Realised prices: copper US$5.74/lb (+35%), WAIO iron ore US$84.56/wmt (+3%), steelmaking coal US$210.21/t (+8%).
- Unit costs expected at the bottom end of guidance for all copper assets, within range at WAIO and towards the top end at BMA, despite inflation, diesel prices and supply chain disruption.
- Growth milestones: Vicuña granted RIGI PEELP status (fiscal framework fixed for 40 years), Stage 1 FID in CY26; Spence upgrade and leaching projects sanctioned; Cerro Colorado restart EIA filed; Ministers North (~US$0.9bn, ~20 Mtpa) approved; Faraday deal giving BHP ~32.5%; Jansen potash first production next year.
- Preliminary H2 FY26 items: Jansen impairment ~US$2.3bn, Antamina silver stream proceeds ~US$4.3bn, capital and exploration spend ~US$5.0bn, net debt ~US$9bn at 30 June 2026.
- Leadership: Jessica Farrell President North America and acting President South America from 1 July; Geraldine Slattery adds Copper SA from 1 September; Edgar Basto becomes Chief Enterprise Performance Officer.

### [BHP FY2026 results presentation speech (Brandon Craig and Vandita Pant)](https://www.bhp.com/-/media/documents/media/reports-and-presentations/2026/260818_bhpresultsfortheyearended30june2026_speech.pdf)

Executive talk · Brandon Craig, Chief Executive Officer (with Vandita Pant, Chief Financial Officer) · 2026-08-18

- Brandon Craig's first results as CEO: "BHP is in great shape", and his agenda is "accelerating performance, delivering programmatic growth, and strengthening our foundations for the future" - "greater ambition… more velocity... but the same discipline".
- Copper produced around 2 Mt for the second year and contributed more than half of EBITDA for the first time; copper EBITDA a record US$18bn, 54% of the Group, at a 70% margin. Underlying EBITDA US$33bn (+27%); full-year dividend US$8.7bn.
- BHP Operating System: Operational Excellence Index up from 36 to 52 since 2020, ~7,000 initiatives delivering more than US$5bn of first-year cost savings; Craig targets a company-wide 65.
- Technology delivered incremental EBITDA at an annual run rate of almost US$500M; target beyond US$650M by end-2027. Next step: integrating the supply chain "from pit to port".
- Growth of 3-4% a year 2027-2035 (around 5% in copper), versus ~2% modelled by many investors; attributable copper equivalent to ~2.5 Mtpa by the mid-2030s.
- Capex around US$11bn a year medium term; copper capex self-funded at consensus prices; ~US$50bn of attributable free cash flow over five years at spot, ~US$15bn in a downside scenario.
- BMA coal stays: "that plan doesn't include selling the business". Jansen expected to deliver around US$1bn of EBITDA per stage per year at margins above 60%.
- Escondida new concentrator: ~US$500M pre-commitment funding, FID 2027 or 2028; Vicuña Stage 1 FID possibly by end of the calendar year.

### [BHP FY2026 results investor and analyst briefing, Q&A transcript - Session 1](https://www.bhp.com/-/media/documents/media/reports-and-presentations/2026/260818_bhpresultsfortheyearended30june2026_investoranalysttranscript1.pdf)

Executive talk · Brandon Craig, Chief Executive Officer (with Vandita Pant, Chief Financial Officer) · 2026-08-18

- Analyst Q&A on Brandon Craig's first results as CEO, with CFO Vandita Pant.
- Costs: Escondida leads on the BHP Operating System; about 40% of the increase in Escondida's FY27 cost guidance is input costs (sulphuric acid, diesel, FX). WAIO's underlying cost increase is only 1.3% excluding one-offs.
- M&A: "very hard to see value at the moment" - organic copper growth at US$16,000-30,000 per tonne versus US$85,000 a tonne for pure-play copper and over US$100,000 with a takeover premium.
- Payout: "50% is the 50%" minimum, but strong balance sheet allows higher returns; US$115bn returned over 10 years. ~US$6.5bn of the US$10bn capital unlock done; no timeline for the remaining US$3.5bn and no giving up control of critical assets.
- Vicuña: Glacier Law, RIGI, power and the San Juan royalty settled; final estimate (camp at 4,000-4,200 m) under way; FID possible before end of calendar year.
- BMA coal: staying in and lifting productivity; medium-term guidance 43-45 Mt at under US$120/t; still working with the Queensland Government on royalties.
- Technology: AI model on the Spence concentrator lifted recovery within a couple of months; large language models applied to leaching. "Initial results are encouraging, but I think the runway is long."
- Jansen Stage 2 (~US$7bn) continued because deferring costs more; potash market seen growing from 75 Mt to over 100 Mt, BHP wants 8.5 Mt of the additional 25 Mt.
- Escondida concentrator upsized: intensity now about US$19,000-22,000 per tonne CuEq. Olympic Dam long-term potential 1 Mtpa CuEq; Vicuña up to 800,000 tpa.

### [BHP H1 FY2026 results investor and analyst briefing, Q&A transcript - Session 1 (Mike Henry)](https://www.bhp.com/-/media/documents/media/reports-and-presentations/2026/260217_bhpresultsforthehalfyear31december2025_investoranalysttranscript1.pdf)

Executive talk · Mike Henry, Chief Executive Officer (with Vandita Pant, Chief Financial Officer) · 2026-02-17

- Mike Henry's analyst Q&A on the half year to 31 December 2025, with CFO Vandita Pant; Henry retired as CEO at the end of June 2026.
- Payout: "60% is not the new 50%"; 50% is the minimum, with proceeds from operations and asset deals run through the Capital Allocation Framework.
- Antamina silver stream (US$4.3bn upfront to Wheaton): sold at roughly the consensus value of BHP's whole Antamina stake - "roughly twice of the P/NAV". No appetite for a gold stream at Copper SA or Vicuña, where upside is unknown.
- Capital unlock: US$6.3bn done of a US$10bn target (WAIO power deal with GIP plus the silver stream); bar is not giving up strategic or operational control.
- Vicuña: Stage 1 FID as early as end-2026, first production possibly in CY2030; RIGI approval the key condition (since obtained). Copper growth of 5% CAGR 2027-2035.
- Jansen: learnings from Stage 1 (contractor integration, project tracking, BOS deployment) applied to Stage 2; potash demand seen up 70% by 2050; BHP at circa 10% of global market.
- BMA: stabilisation under way, but upside "bounded by the draconian royalty approach that's in place in Queensland".
- WAIO: autonomous haulage almost 80%, aiming for over 90-95%; US$17.50/t medium-term cost described as "very bankable".

## Questions about BHP

### What does BHP do?

BHP mines copper, iron ore and coal, mainly in Australia and Chile, and is building the Jansen potash mine in Canada.

### What is BHP's revenue?

Revenue for the year ended 30 June 2026 was US$58,760M, up from US$51,262M, with Underlying EBITDA of US$32,947M.

### How many people work at BHP?

BHP had 84,309 employees and contractors globally in FY2026, including 44,254 in Australia and 30,892 in Chile.

### Who leads BHP?

Brandon Craig has been CEO since 1 July 2026, succeeding Mike Henry. Vandita Pant is CFO and Ross McEwan is Chair.

### What is BHP's strategy?

BHP aims to accelerate operating performance with its operating system and technology, grow copper and potash with discipline, and strengthen its social and safety foundations.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_