# ENGIE account plan

> ENGIE is a French energy utility in renewables, gas and power networks, energy supply and services, with €71.9bn of 2025 revenues and 91,189 employees.

## At a glance

ENGIE, headquartered in La Garenne-Colombes, France, is a global energy utility that generates renewable, gas and nuclear power, operates gas and electricity networks, runs local energy infrastructure such as district heating, and supplies and manages energy for more than 200,000 B2B customers and about 20 million B2C contracts. It is present in 31 geographies, with France, the UK, Belgium, Brazil and the US as its top five, and had 91,189 employees at end-2025. FY2025 revenues were €71.9bn, EBITDA €14.7bn and net recurring income Group share €4.9bn. The French State holds over 23% of the capital; Catherine MacGregor is CEO and Jean-Pierre Clamadieu chairs the Board.

## Business units

- **Renewables & Flex Power** (2025 revenues €9,860m, EBIT €3,577m): Wind, solar, hydro and battery storage (57.2 GW at end-2025, 95 GW targeted by 2030) plus 45.5 GW of thermal capacity, mostly gas plants in Europe and the Gulf. Renewables & BESS EBIT grew 6.2% organic in 2025 while gas generation fell on lower European spreads. Paulo Almirante stepped down in 2026 and was replaced by Pedro Vasconcelos.
- **Networks** (2025 revenues €7,992m, EBIT €3,054m): French gas distribution (GRDF), transmission (NaTran), storage (Storengy) and LNG terminals (Elengy), gas networks in Brazil, Mexico and Romania, and power transmission in Latin America. UK Power Networks, serving 8.5 million customers, was added in May 2026. EBIT grew 28.8% organic in 2025 on new tariffs; led by Cécile Prévieu.
- **Local Energy Infrastructures** (2025 revenues €8,831m, EBIT €482m): District heating and cooling (372 networks in 2025), on-site energy for industry, energy performance contracts and EV charging through ENGIE Vianeo, with nearly 28,500 employees. Order intake was €9.5bn in 2025; led by Frank Lacroix.
- **Supply & Energy Management** (2025 revenues €42,495m, EBIT €2,357m): B2B supply and PPAs for over 200,000 business customers, B2C supply for about 20 million contracts in six countries, and global energy management optimising nearly 60 GW of assets. EBIT fell 23.7% organic in 2025 as energy markets normalised; led by Edouard Neviaski.
- **Nuclear** (2025 revenues €539m, EBIT €714m): Belgian reactors Doel 4 and Tihange 3, run in a 50/50 joint venture with the Belgian State, plus drawing rights in France. Since April 2026 ENGIE is in exclusive talks for the Belgian State to acquire all of its nuclear activities.

## Strategic priorities

- **2026-2028 investment plan**: €34-38bn of gross capex over 2026-2028, about 90% in renewables, batteries and infrastructure, targeting EBIT ex-nuclear of €10.3-11.3bn in 2028.
- **More regulated and contracted earnings**: Raise the share of EBIT that is regulated or long-term contracted to 67% in 2028, from 42% in 2024 and 55% in 2025, helped by UK Power Networks.
- **Renewables and storage growth**: 95 GW of renewable and battery capacity targeted by 2030 from a 122 GW pipeline; 59.5 GW installed at mid-2026.
- **Power for data centers**: 2030 goals of 3-4 GW of co-located data centers, 5 GW of enabled renewable and battery projects and 50 TWh delivered to the tech and data-center sector; 47% of the 50 TWh target was secured by mid-2026.
- **Performance plan**: €0.8-1.0bn of EBIT over 2026-2028 from fixing loss-making activities, operational efficiency, one SAP ERP and shared services, after €823m delivered in 2025.
- **Net Zero 2045**: A Net Zero Carbon target for 2045 written into the bylaws, with biomethane and hydrogen to decarbonise gas alongside electrification.

## Latest results

In H1 2026 (six months to 30 June 2026) revenue was €36.7bn (-2.9% organic), EBIT excluding nuclear rose 3.3% to €5.3bn and net recurring income Group share was €3.0bn, while net income Group share rose 13.7% to €3.3bn. Power networks, B2C and Energy Management grew, while B2B EBIT fell 39.4% as legacy high-margin contracts normalised and nuclear EBIT fell 75.9%. The UK Power Networks acquisition lifted economic net debt to €60.3bn, or 4.2x EBITDA, expected back near 4.0x. ENGIE raised its 2026 net recurring income guidance to €4.9-5.5bn and EBIT ex-nuclear to €9.2-10.2bn.

## Investments and deals

- **UK Power Networks**: Acquired on 7 May 2026 for €12.2bn (£10.6bn) in cash, financed with a €3bn capital increase and €2.3bn of hybrid debt; the UK becomes ENGIE's second-largest country.
- **Renewables and batteries**: A record 6.2 GW added in 2025 and 2.4 GW in H1 2026, including BESS in Belgium and Chile and the Dieppe-Le Tréport offshore farm.
- **Latin American transmission**: Four 30-year transmission concessions in Peru (over 400 km) and two Brazilian concessions in 2026, toward 10,000 km of lines by 2030.
- **Disposals**: About €6bn of disposals planned over 2026-2028 (€4bn tied to UKPN), including an agreement to sell interests in Qatar and the transfer of the Jirau stake into EBE.
- **Local energy and supply**: New district-heating concessions in France and Poland, a DeutschlandNetz truck-charging lot, and the acquisition of IGNIS Luz, a Spanish SME supply business, on 29 May 2026.

## Challenges and risks

- **Regulatory and political intervention**: Rising risk from the post-ARENH VNU in France, capacity mechanisms, Brazilian tax changes and the threat of a gas-network bypass to TAG; the CEO asks for a stable framework.
- **US renewables headwinds**: US offshore wind suspensions and the end of IRA support led ENGIE to assume a four-year delay on US offshore and lower US onshore ambitions; federal wind permitting remains slow.
- **Normalising energy margins**: B2B and Energy Management earnings fell as crisis-era margins and volatility faded, and captured gas spreads in Europe dropped.
- **Higher leverage**: Economic net debt/EBITDA reached 4.2x after UKPN, against a long-term target at or below 4.0x.
- **Cybersecurity and climate**: Cybersecurity risk is rising, and climate change affects demand, hydro output and asset integrity.

## What leadership says

> "fundamentally rebalances our Group to be much more of an electrician" — Catherine MacGregor, Chief Executive Officer, FY2025 results and UKPN conference call, 26 February 2026, on the UK Power Networks deal

> "We create more value organically than inorganically." — Catherine MacGregor, Chief Executive Officer, FY2025 results and UKPN conference call, 26 February 2026

> "ENGIE delivered a very strong first half, once again demonstrating its ability to create value in various market conditions." — Catherine MacGregor, Chief Executive Officer, 2026 First-Half Financial Report, 31 July 2026

> "I am reasonably optimistic that a deal can be concluded." — Catherine MacGregor, Chief Executive Officer, H1 2026 results call, 31 July 2026, on the Belgian nuclear transfer talks


## Where a supplier can help

- **Grid equipment and services**: Tied to the UK Power Networks acquisition and Latin American transmission build-out: grid equipment, engineering and asset-management suppliers can serve a fast-growing networks business.
- **Battery and renewables supply chain**: Tied to the 95 GW renewables and storage target: BESS, solar, wind and repowering suppliers fit a pipeline of over 6 GW under construction.
- **Data-center energy solutions**: Tied to the data-center priority: co-siting partners, on-site generation and energy-management tooling can help ENGIE meet data centers' short time-to-market needs.
- **ERP, AI and shared services**: Tied to the performance plan: SAP migration, B2B/B2C re-platforming and AI productivity tools support the one-ERP and shared-services moves.
- **Cybersecurity**: Tied to the rising cybersecurity risk: NIS2-compliant security services for critical gas and power infrastructure.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Universal Registration Document 2025 (including Annual Financial Report)](https://www.engie.com/app/uploads/2026/03/Universal-Registration-Document-2025.pdf)

Annual report · 2026-03-12

- ENGIE (La Garenne-Colombes, France; CEO Catherine MacGregor, Chairman Jean-Pierre Clamadieu; the French State holds over 23% of the capital) is a global energy utility organised since February 2025 into four Global Business Units (Renewables & Flex Power, Networks, Local Energy Infrastructures, Supply & Energy Management) plus a Nuclear operating entity, with 91,189 employees, 31 geographies and a stated ambition to be "the best energy transition utility". Its purpose, written into the bylaws, is to accelerate the transition to a carbon-neutral economy; the Net Zero Carbon target is 2045.
- FY2025: revenues €71.9bn (-2.5% gross, -0.7% organic), EBITDA €14.7bn, EBIT excluding Nuclear €8.8bn (+2.2% organic), net recurring income Group share €4.9bn (vs €5.5bn in 2024, at the top end of guidance), net income Group share €3.8bn, CFFO €13.6bn, gross capex €7.9bn (net growth capex €5.2bn, over 75% in Renewables & Flex Power and Networks), economic net debt €45.2bn (3.1x EBITDA), financial net debt €38.9bn (+€5.7bn, from the €15bn Belgian nuclear-waste payment). Proposed dividend €1.35 per share (67% payout).
- EBIT by activity 2025: Renewables & Flex Power €3,577m (Renewables & BESS €2,485m, +6.2% organic; Gas generation €1,093m), Infrastructures €3,536m (Networks €3,054m, +28.8% organic on new French and European tariffs; Local Energy Infrastructures €482m), Supply & Energy Management €2,357m (B2C €525m, B2B €1,200m, Energy Management €632m, -51.6% as markets normalised), Nuclear €714m (-50.7%). By geography (ex-nuclear): France €3.9bn, Rest of Europe €2.2bn, Latin America €2.1bn, North America €0.8bn, AMEA €0.5bn.
- Operational scale: 57.2 GW of renewable and battery capacity (record 6.2 GW added in 2025, 7.9 GW under construction, 121 GW pipeline, 95 GW target for 2030), 45.5 GW of thermal capacity (15.8 GW of gas plants in Europe, 23.7 GW in the Gulf), 4.8 GW of PPAs signed (global corporate-PPA leader, clients include Meta, Google, Apple), 232 TWh of electricity delivered to end customers, more than 200,000 B2B customers and about 20 million B2C contracts, 307,650 km of gas and power networks (GRDF 201,000 km distribution, NaTran 32,000 km transmission, Storengy 12.2 bcm storage, Elengy 21.5 bcm LNG regasification), 14.5 TWh/year of biomethane connected in France, 372 district heating and cooling networks, ENGIE Vianeo 10,000 charging points.
- Strategy and 2026-2028 plan (presented 25-26 February 2026): €34-38bn gross capex, ~90% in renewables, batteries and infrastructure; EBIT contribution of new investments €2.7-3.1bn; performance plan €0.8-1.0bn of EBIT (after €823m delivered in 2025); ~€6bn of disposals (€4bn tied to the UKPN acquisition); 67% of EBIT regulated or long-term contracted by 2028 (42% in 2024, 55% in 2025). Guidance: NRIgs €4.6-5.2bn in 2026, €4.9-5.5bn in 2027, €5.2-5.8bn in 2028; EBIT ex-nuclear €8.7-9.7bn, €9.8-10.8bn, €10.3-11.3bn.
- The transformational move is the agreement signed 25 February 2026 to buy 100% of UK Power Networks (UKPN), the regulated distributor serving 8.5 million customers in London, the East and South East of England (6,500 employees), closing assumed from 1 July 2026, financed by up to €3bn of equity (ABB), ~€5bn of senior and hybrid debt and disposals; the UK becomes ENGIE's second-largest country.
- Data centers are a named growth lever: 2030 goals of 3-4 GW of co-located data centers (6 GW pipeline at end-2025), 5 GW of renewable and battery projects enabled, and 50 TWh of power delivered to the tech and data-center sector; the Group positions itself as a supplier and energy manager, not a data-center investor.
- Belgium: the December 2023 agreement with the Belgian State was completed on 14 March 2025; ENGIE paid €15bn (2022 value) in two instalments (€12.2bn in March, €3.6bn after the Doel 4 restart) to transfer nuclear-waste liabilities; Tihange 3 and Doel 4 were restarted (10 July and 8 October 2025) in a 50/50 joint venture with the State under a contract-for-difference; Doel 1, Tihange 1 and Doel 2 were shut down in 2025. Dismantling provisions are under a disputed triennial review (ONDRAF report suggests higher costs; ENGIE disagrees).
- Main risks (net, by criticality): State intervention and regulatory change (rising; post-ARENH "VNU" in France, French capacity mechanism, Brazilian taxes and gas "bypass"), downward return on French gas networks, climate effects on demand and assets (hydro most exposed), adaptation of business models (US offshore wind suspensions, One Big Beautiful Bill Act ending IRA support; four-year delay assumed on US offshore, lower US onshore ambitions), commodity and counterparty risk (rising, from US tariffs and the Middle East), renewable supply chain, cybersecurity (rising), industrial accidents, nuclear.
- Executives' framing: Catherine MacGregor says "only a pragmatic approach based on an energy mix combining electrons and molecules" delivers an affordable transition, that renewables "bolster a country's sovereignty", and that "our robust utility model means we can face the future with confidence"; Clamadieu calls 2025 "a tipping point" and UKPN "an important step in the Group's transformation".

### [2026 First-Half Financial Report (six months ended 30 June 2026)](https://www.engie.com/app/uploads/2026/07/2026-First-Half-financial-report-1.pdf)

Interim report · 2026-07-31

- H1 2026 (published 31 July 2026): revenue €36.7bn (-3.6% gross, -2.9% organic), EBITDA €7.9bn (-4.9%), EBITDA ex-nuclear €7.7bn (+1.6% organic), EBIT ex-nuclear €5.3bn (+1.2% organic, +3.3% gross), net recurring income Group share €3.0bn (vs €3.1bn), net income Group share €3.3bn (+13.7%, helped by a €0.6bn positive commodity mark-to-market), CFFO €6.9bn (-€1.5bn, nuclear phase-out and working capital).
- Guidance upgraded: 2026 net recurring income Group share now €4.9-5.5bn (from €4.6-5.2bn) and EBIT ex-nuclear €9.2-10.2bn (from €8.7-9.7bn), on a lower expected tax rate of 18-22%, €/USD 1.16, €/BRL 5.96, €/GBP 0.87 and commodity prices at 30 June 2026.
- UK Power Networks was acquired on 7 May 2026, nearly two months early, for €12.2bn (£10.6bn) in cash, adding €19bn to net financial debt (including €7bn of assumed debt), financed with a €3bn capital increase (107 million shares at €28, 4.4% of capital) and €2.3bn of hybrid debt; UKPN contributed €180m of EBIT and €0.4bn of revenue over two months; provisional goodwill €7.7bn.
- Balance sheet: capex €22.9bn (€19.0bn for UKPN; €3.9bn otherwise, 90% in Renewables & Flex Power and Infrastructure), net financial debt €54.9bn (+€16.0bn), economic net debt €60.3bn, economic net debt/EBITDA 4.2x, expected back near 4.0x once UKPN contributes a full year; liquidity €20.9bn; ratings BBB+/Baa1/BBB+ stable.
- EBIT by activity: Renewables & BESS €1,342m (+2.8% organic, new assets offset by lower European captured prices), gas generation €477m (-22.3%, lower spreads, Peru pipeline outage), gas networks €1,656m (+2.9%), power networks €320m (+18.6% organic, Brazil indexation, plus UKPN), LEI €248m (+7.6%, margin 5.7%), B2C €461m (+74.1%), B2B €558m (-39.4% as legacy high-margin contracts normalise), Energy Management €530m (+42.7%, gas settlements), Nuclear €121m (-75.9%). The performance plan added €304m.
- Growth markers: 59.5 GW of renewables and batteries (+2.4 GW), 6.4 GW under construction, 122 GW pipeline, 2.4 GW of PPAs signed (double H1 2025), 325 MW of onshore wind awarded in France, Dieppe-Le Tréport offshore first turbine, Tocopilla BESS (116 MW/660 MWh) in Chile, Drogenbos BESS (80 MW/320 MWh) started in Belgium, four Peruvian transmission concessions (over 400 km), 15.1 TWh of biomethane connected in France, 602 district networks and industrial plants (+33), Vianeo 11,000 charging points and a DeutschlandNetz truck-charging lot, acquisition of IGNIS Luz (Spanish SME supply) on 29 May, Google 24/7 carbon-free partnership extended to 2030.
- Data centers: pipeline of 7 GW of data-center load (+1 GW), of which 4 GW advanced-stage (0.8 GW at end-2025); close to 1 GW of PPAs signed in H1, 7 GW of PPAs with tech and data-center companies in total; 47% of the 50 TWh-by-2030 supply target already secured.
- Belgium: a letter of intent signed 30 April 2026 opens exclusive talks for the Belgian State to acquire all of ENGIE's nuclear activities (seven reactors, staff, subsidiaries, liabilities), with heads of terms targeted by 1 October 2026 and an intent that the deal be neutral for ENGIE's financial position; dismantling works are suspended meanwhile. The Constitutional Court dismissed the appeal against the Phoenix Law on 18 May 2026; the Gazprom arbitration was terminated by mutual withdrawal.
- After the half: on 14 July EBE completed a €1.4bn capital increase absorbing ENGIE's Jirau stake (ENGIE's interest in Jirau falls to 27.5%); an agreement to sell interests in Qatar; LINK 2026 employee share plan took employee ownership to nearly 4%. The CEO: "ENGIE delivered a very strong first half, once again demonstrating its ability to create value in various market conditions."

### [FY 2025 results, UK Power Networks acquisition and 2026-2028 outlook: conference call transcript (26 February 2026)](https://www.engie.com/app/uploads/2026/05/ENGIE-FY-2025-Transcript.pdf)

Executive talk · Catherine MacGregor, Chief Executive Officer; Pierre-François Riolacci, Chief Financial Officer · 2026-02-26

- Catherine MacGregor (CEO) and Pierre-François Riolacci (CFO) presented FY2025 results, the UK Power Networks acquisition and the 2026-2028 outlook from London on 26 February 2026: EBIT ex-nuclear "virtually flat" at €8.8bn, net recurring income €4.9bn at the top end of guidance, CFFO €13.6bn (about €40bn over three years), economic net debt/EBITDA 3.1x, dividend €1.35 (67% payout) "to soften the dividend decrease versus EPS".
- 2025 drivers: commissioning +€507m, performance +€823m (including €368m from fixing legacy underperformers, mostly EVBox losses stopped), prices and volatility negative in S&EM, Renewables & BESS EBIT +7% organic with capex overruns below 1%, record 6 GW of new capacity (2.4 GW in the US led by batteries from the 2023 BRP pipeline), 4.8 GW of PPAs (3.6 GW corporate clean PPAs). Belgium moved from almost 4 GW of merchant nuclear and €11bn of waste liabilities to quasi-regulated output from two co-owned reactors, Flémalle and Vilvoorde on capacity payments.
- UKPN: enterprise value £15.8bn, 1.5x the estimated March 2026 RAV (£9.2bn in March 2025, £10.5bn expected by March 2028), 10x implied 2027 EBITDA, expected EBIT of £0.8bn in the year to March 2026, mid-single-digit long-run profit growth; UKPN was "not for sale" and ENGIE had been the second bidder on ENWL. Funding: €6bn of existing UKPN debt stays; the ~€12bn equity cheque is covered by bridge loans, then ~€5bn of debt and hybrids, €4bn of disposals by 2028 and up to €3bn of equity via ABB.
- Mid-term plan: capex €34-38bn over 2026-2028 (vs ~€31bn before), split roughly equally between Renewables & BESS and Infrastructures; EBIT ex-nuclear CAGR of 7% to €10.3-11.3bn in 2028 (more than twice 2021), about €3bn of additional EBIT from investments and performance; Networks EBIT up more than half with power rising to about 35% of it; cash from Networks covers all Networks capex; regulated and contracted EBIT share from 42% (2024) to two-thirds (2028); €60bn of RAB and networks capital employed by 2030; Group capital employed from €69bn to ~€100bn by 2028.
- 2026 is "broadly in line with '25" (NRIgs €4.6-5.2bn), B2B EBIT resets to about €900m after €300m of 2025 one-offs and crisis-locked margins, S&EM EBIT "a bit north of 2 billion" euros in 2026, tax rate falls to 20-23% as Belgian "tax frictions" are retired; leverage goes above 4x in 2026 and back below in 2027; the rating agencies confirmed ratings and relaxed their thresholds.
- Positions: MacGregor says the deal "fundamentally rebalances our Group to be much more of an electrician"; no further distribution M&A "anytime soon"; new gas plants only with a capacity mechanism and low risk ("today everybody loves gas. I don't know that in five years everybody will love gas again"); "we create more value organically than inorganically"; disposal themes are non-controlled stakes, opening minorities, and portfolio housekeeping.
- Data centers: a dedicated team with 2030 goals of 3-4 GW co-sited (6 GW pipeline, "30, 40" projects, mostly US), 5 GW of enabled renewables and BESS, 50 TWh of supply; "We are not taking participation in data center... We remain, who we are, we are an energy provider."
- Riolacci on performance: 10% of the €0.8-1.0bn plan from loss-making activities, 40% from operational efficiency, half from "competitiveness and culture" (G&A, one SAP ERP, shared services moving from France and Belgium to Romania); "we are maybe at the end of the beginning"; UKPN's culture is "under-promise, over-deliver".

### [H1 2026 results: conference call transcript (31 July 2026)](https://www.engie.com/app/uploads/2026/07/ENGIE-1H26-Transcript.pdf)

Executive talk · Catherine MacGregor, Chief Executive Officer; Pierre-François Riolacci, Chief Financial Officer · 2026-07-31

- On 31 July 2026 Catherine MacGregor and CFO Pierre-François Riolacci presented H1 2026: EBIT ex-nuclear +3% at €5.3bn, performance +€304m, net recurring income "little changed" at €3bn, economic net debt up a third to €60bn with UK Power Networks; full-year NRIgs guidance raised to €4.9-5.5bn "with a new midpoint at the top end of the former one" — "confidence, not optimism".
- MacGregor calls 2026 "a tipping point": the Middle East conflict after Ukraine forces countries to prioritise energy security; the EU targets a 46% electricity share by 2040; French EV sales jumped 63% in H1; France, Germany, Spain and the Netherlands advance capacity-remuneration schemes (ENGIE is preparing a project for Germany's second CCGT auction in December with land and turbine supply secured); climate is "less predictable, more extreme".
- Asset-value levers: Jirau raising its reservoir for up to 236 MW extra, £1bn invested in First Hydro pumped storage for 25 more years, repowering of a 440-unit European onshore fleet (0.2 GW done, over 1 GW by 2030), a gas fleet capable of 1,000 start-ups a quarter, 1.5 GW of PPA extensions in Oman; a June heatwave produced €11m of value from the European gas fleet in a few days.
- Renewables: 2.4 GW commissioned, nearly 60 GW installed, 84 projects and over 6 GW under construction; US fundamentals strong (ERCOT peak above 91 GW on 22 July) but federal wind permitting via FAA reviews is slow, so 8-10 GW of the 26 GW US pipeline is safe-harboured; 1-1.2 GW to reach COD in the US in 2026 plus 1.4 GW at FID; 2026 additions "somewhat below" 2025's 5.5 GW organic, with the 2030 target confirmed and small-to-medium acquisitions possible. Paulo Almirante stepped down as EVP Renewables & Flex Power, replaced by Pedro Vasconcelos.
- Data centers: 47% of the 50 TWh 2030 supply target achieved, 7 GW of PPAs with tech and data centers, 7 GW co-siting pipeline with 4 GW advanced; a three-level "pyramid" of value (higher-margin supply deals, PPAs enabling new generation, co-siting with land sales and energy management); some advanced projects should "bear fruit" within 12 months; data centers want COD in two to three years.
- UKPN consolidated from May, €180m EBIT in two months, integration "going well", draft ED3 business plan submitted to Ofgem that day; UKPN debt stays local but gearing will be optimised; Latin America transmission on track for 10,000 km by 2030 (400 km Peru award, nearly 300 km in Q1), with a big Brazilian auction in October approached "very disciplined".
- Supply & Energy Management: former GEMS perimeter expected around €1.7bn of EBIT for 2026 (B2B near €1bn, Energy Management ~€0.7bn including gas settlements, mostly booked in Q1), with cautious H2 de-risking; PPA pricing supportive in the US, "flattish at best" in Europe; the next GRDF regulatory period is prepared in 2027, with a CRE report confirming gas's role to 2050 and the expected clawback from lower volumes.
- AI and performance: three pillars (digital core convergence incl. SAP and B2B/B2C re-platforming, proprietary data, AI for all/builders/business); developer productivity "30%, I think it's higher"; public-tender analysis cut from six hours to seven minutes with 100% coverage; AI in French B2C saves ~€5m; the €0.8-1.0bn three-year performance plan should extend beyond three years. Tax rate guided to 18-22% with Belgian timing uncertainties and contingencies.
- Belgium: nuclear transfer talks "moving forward constructively" toward heads of terms on 1 October; "I am reasonably optimistic that a deal can be concluded." Jirau's transfer into EBE simplifies the Brazilian structure and strengthens EBE's credit ratios.

### [Hearing of Catherine MacGregor before the French Senate's Economic Affairs Committee (22 October 2025): official written record](https://www.senat.fr/compte-rendu-commissions/20251020/affecos.html)

Executive talk · Catherine MacGregor, Chief Executive Officer · 2025-10-22

- Catherine MacGregor was heard on 22 October 2025 by the French Senate's economic affairs committee (chair Dominique Estrosi Sassone). She described ENGIE as 98,000 employees worldwide (46,000 in France), about 100 GW of generation "nearly half" renewable, number one in wind and solar and number two in hydro in France, supplier of 5 million French households for electricity and 6 million for gas, operator of almost all French gas infrastructure, investing "around €10 billion every year", with a Net Zero 2045 target written into the bylaws.
- Her three convictions: a well-run transition is "a source of competitiveness and sovereignty", it repatriates production, growth and jobs, and it cannot happen without the territories. Electrification is the main lever but will cover "at best half" of final energy, so gas must be decarbonised through biomethane and hydrogen: "the alliance of the electron and the molecule". On a winter Tuesday France drew 87 GW of electricity while gas delivered 123 GW; gas cannot be removed from heating, so hybrid systems with gas as back-up are the way.
- Policy asks: a stable framework and a national multi-year energy plan (she backs the Gremillet bill), simplification (ZAN), faster and steadier tender calendars (offshore wind, floating), stability of tax rules and permits, local decision-making on project siting, and staying inside the European electricity market ("we are very worried" about France becoming an "island"; the British are trying to get back in).
- She rejects the claim that French renewables will cost €300bn: "rather around €50bn", calling the €300bn figure "fake news" she felt an obligation to counter; French solar at €70-80/MWh versus €30-35 in Spain shows the need for bigger, better-sited projects, batteries where solar is saturated, and repowering.
- Data centers are "an opportunity for France and Europe" but should bring "additionality" (new decarbonised generation) so they do not push up prices; a data center consuming like a city of 100,000 should come with its own clean capacity.
- Nuclear: ENGIE favours a balance of nuclear and renewables; new nuclear will not arrive before 2038 and will cost more than renewables ("the discussion will be about the number of EPR2"); ENGIE paid €15bn to the Belgian State for long-term waste and remains responsible for about €10bn of dismantling.
- Gas sourcing: ENGIE does not produce gas; Russian supply was below 20% before the war and is now zero in the portfolio; US LNG is bought within limits to avoid new dependencies, with traceability requirements on shale production; the EU-US $750bn purchase pledge "has hardly any practical bearing" on ENGIE's supply, which will decline steadily to 2045.
- Other positions: a 90% EU emissions target for 2040 would send "a bad signal" since 2050 neutrality can be reached with a less strict interim goal; protecting precarious households is "essential" or the transition will be rejected; Equans will not be sold piecemeal (the whole sale is taking longer than wished); no new dams in France, rather modernisation; floating wind costs are still "a little high" but promising in the Mediterranean; the "Happy Heures Vertes" offer (cheaper power when there is surplus) is tested on up to 100,000 customers; the 2023 renewables acceleration law is "a bit disappointing" because the rest (PPE, permits) does not follow.

## Questions about ENGIE

### What does ENGIE do?

ENGIE generates renewable, gas and nuclear power, operates gas and electricity networks, runs district heating and on-site energy, and supplies and manages energy for businesses and households.

### What is ENGIE's revenue?

FY2025 revenues were €71.9bn, with EBITDA of €14.7bn and net recurring income Group share of €4.9bn.

### How many employees does ENGIE have?

91,189 employees at end-2025.

### What is ENGIE's strategy?

To be the best energy transition utility: €34-38bn of capex over 2026-2028 mostly in renewables, batteries and networks, more regulated and contracted earnings, and Net Zero by 2045.

### Who leads ENGIE?

Catherine MacGregor is CEO, Jean-Pierre Clamadieu chairs the Board and Pierre-François Riolacci is CFO.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_