# Freeport-McMoRan account plan

> Freeport-McMoRan is a Phoenix-based copper, gold and molybdenum miner, third-largest copper producer in 2025, with $25,915 million of 2025 revenues.

## At a glance

Freeport-McMoRan Inc. (FCX), headquartered in Phoenix, Arizona, mines copper, gold and molybdenum at the Grasberg district in Indonesia, the Morenci district and six other mines in Arizona and New Mexico, Cerro Verde in Peru and El Abra in Chile, and refines and rods copper for wire and cable makers. Wood Mackenzie ranked it third among copper producers in 2025, with approximately 5% of world mined copper, and it provides approximately 70% of U.S. refined copper production. FY2025 revenues were $25,915 million (copper 75%, gold 15%, molybdenum 8%), operating income $6,518 million and net income attributable to common stock $2.2 billion. It has approximately 29,000 employees, plus large contractor workforces. The company is publicly listed.

## Business units

- **Indonesia operations (PT Freeport Indonesia / Grasberg)** (about 33% of 2025 revenues ($8,618 million)): Three underground mines in the Grasberg district plus the Gresik smelter and precious metals refinery, 48.76% owned and operated by FCX; 30% of group copper and 98% of group gold in 2025. Output fell after the September 8, 2025 mud rush; mill throughput reached about 67% of capacity in Q3 2026, with near full capacity targeted by year-end 2027.
- **U.S. Rod & Refining** (about 26% of 2025 revenues ($6,850 million)): The El Paso refinery and rod mill and the Miami rod mill turn copper from the U.S. mines into about one billion pounds of continuous cast rod a year for wire and cable manufacturers.
- **South America operations (Cerro Verde, El Abra)** (about 18% of 2025 revenues ($4,615 million)): Cerro Verde in Peru (now 55.66% owned) and El Abra in Chile (51%), 31% of group copper in 2025. Operating income rose over 90% in the first nine months of 2026 on higher prices; El Abra filed an environmental impact study in March 2026 for a mill project of over 700 million pounds a year.
- **Atlantic Copper** (about 12% of 2025 revenues ($3,155 million)): A wholly owned smelter and refinery in Huelva, Spain, buying most of its concentrate from third parties.
- **U.S. copper mines**: Morenci, Bagdad, Safford, Sierrita and Miami in Arizona and Chino and Tyrone in New Mexico, 39% of group copper in 2025; most output is sold through Rod & Refining. Operating income more than doubled in the first nine months of 2026; extreme weather hurt operating rates.
- **Molybdenum mines**: Climax and Henderson in Colorado produced 37 million pounds of molybdenum in 2025, with conversion plants in Arizona, Iowa, Rotterdam and Stowmarket.

## Strategic priorities

- **Grasberg recovery**: Restore Grasberg Block Cave after the 2025 mud rush: 80% of capacity by mid-2027 and near full capacity by year-end 2027, with Grasberg copper sales rising from about 700 million pounds in 2026 to about 1.2 billion in 2027.
- **Volume growth without new capital**: About 3 billion pounds of copper in 2026, 3.7 billion in 2027 and over 4 billion in 2028, with a path to 4.5 to 5 billion pounds a year around 2030.
- **Innovative leaching**: Recover copper from stockpiles with proprietary additives and heat: from a run rate of about 220 million pounds to 300 million pounds in 2027, with 800 million pounds by 2030 as an aspiration.
- **Brownfield expansions**: Bagdad expansion approved in November 2026, El Abra mill project, Safford/Lone Star studies and Kucing Liar in Indonesia, preferred over greenfield projects.
- **Indonesian operating rights**: A February 2026 MOU and June 2026 application for a life-of-resource extension beyond 2041, with FCX keeping 48.76% through 2041 and approximately 37% from 2042.
- **Technology and automation**: Autonomous haulage at Bagdad, 400-ton ultra-class trucks and a remote operating center in Phoenix to cut costs at lower-grade U.S. mines in a tight labor market.

## Latest results

In Q3 2026 revenues were $7,546 million against $6,972 million a year earlier, operating income $2,353 million and net income attributable to common stock $1,174 million ($0.81 per share). Over the first nine months net income reached $3,039 million, as operating income from the U.S. copper mines more than doubled and South America rose over 90% on record copper prices, offsetting lower Indonesia income during the Grasberg ramp-up. The 2026 outlook is 3.0 billion pounds of copper sales, unit net cash costs of $1.90 per pound, operating cash flows of about $8.5 billion and capex of $4.4 billion.

## Investments and deals

- **Bagdad expansion**: A $4.5 billion program approved in November 2026 to more than double mining and milling rates, adding approximately 225 million pounds of copper a year, with initial production targeted for mid-2030.
- **Kucing Liar**: Underground development in Indonesia with $1.6 billion incurred and approximately $4 billion more through 2033; ramp-up expected in the 2029-2030 timeframe.
- **El Abra mill project**: Capital estimated at approximately $7.5 billion (2024 estimate) for over 700 million pounds of copper a year; environmental impact study submitted in March 2026.
- **Capital expenditure**: $4.4 billion in 2026 and $5.2 billion in 2027, including more U.S. mining equipment and Atlantic Copper's CirCular project; Bagdad is excluded.
- **Cerro Verde stake**: 2.0 million Cerro Verde shares bought for $107 million in May 2026, raising the stake to 55.66%.

## Challenges and risks

- **Grasberg restart and costs**: The mud rush killed seven workers; idle facility, recovery and restoration costs reached $934 million in nine months of 2026, and dry weather limits water for milling.
- **Energy and input inflation**: Energy, mainly diesel, raised costs by about $500 million versus 2025; the U.S. cost target of $2.50 per pound is not achievable in 2027 at current energy, sulfur and acid prices.
- **Indonesian regulation**: The operating-rights extension is pending and a 10% export duty on refined gold conflicts with PTFI's IUPK.
- **Tight U.S. labor market**: Arizona mines compete for workers with semiconductor and data center projects.
- **Trade policy and commodity prices**: Section 232 copper tariffs, commodity price volatility and weather affect results; each $0.10 per pound of copper equals about $390 million of EBITDA.

## What leadership says

> "Electrification continues to advance at a rapid pace, bigger and faster than we've seen in the past, and copper is the metal of electrification." — Richard Adkerson, Chairman, Q3 2026 earnings call, October 27, 2026

> "this could represent the major breakthrough technology that we've been working to achieve." — Kathleen Quirk, President and CEO, Q3 2026 earnings call, October 27, 2026, on the new leach additive

> "I would not rule out M&A, but our base case is our organic growth opportunities" — Kathleen Quirk, President and CEO, Q3 2026 earnings call, October 27, 2026

> "The best lies ahead for Indonesia and for PT Freeport-McMoRan Indonesia." — Richard Adkerson, Chairman, Q2 2026 earnings call, July 23, 2026


## Where a supplier can help

- **Mining equipment and autonomy**: The Bagdad expansion, ultra-class trucks and autonomous haulage tied to the U.S. labor shortage create demand for equipment, autonomy software and remote operations technology.
- **Energy cost reduction**: About $500 million of higher energy costs, mostly diesel, favour suppliers of fuel efficiency, electrification, alternative power and energy procurement.
- **Leaching chemistry and process technology**: The innovative leaching programme needs reagent production, heating, sensors and analytics to move from about 220 million to 300 million pounds a year.
- **Underground recovery in Indonesia**: The Grasberg ramp-up and Kucing Liar development need drilling, dewatering, water supply and safety monitoring services.
- **Project delivery capacity**: Running Bagdad, El Abra, Safford/Lone Star and Kucing Liar in parallel makes execution harder, opening room for EPC, project controls and contractor workforce partners.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Annual Report on Form 10-K for the fiscal year ended December 31, 2025](https://www.sec.gov/Archives/edgar/data/831259/000083125926000012/fcx-20251231.htm)

Annual report · 2026-02-13

- Freeport-McMoRan (FCX), headquartered in Phoenix, Arizona, describes itself as "a leading international metals company with the objective of being foremost in copper"; Wood Mackenzie ranked it third among copper producers in 2025 with approximately 5% of world mined copper, and it supplies approximately 70% of total U.S. refined copper production.
- FY2025: revenues $25,915 million (2024: $25,455 million), operating income $6,518 million (2024: $6,864 million), net income attributable to common stock $2.2 billion (2024: $1.9 billion); revenue mix copper 75%, gold 15%, molybdenum 8%.
- Production 2025: 3.4 billion pounds of copper, 1.0 million ounces of gold and 92 million pounds of molybdenum; copper split U.S. 39%, South America 31%, Indonesia 30%; reserves 112.3 billion pounds of copper, 20.6 million ounces of gold, 3.5 billion pounds of molybdenum.
- The September 8, 2025 mud rush at the Grasberg minerals district (Indonesia) killed seven workers and suspended the Grasberg Block Cave mine; a phased restart was planned from second-quarter 2026, with about 85% of normal PTFI production restored in the second half of 2026; insurance covers up to $1.0 billion after a $0.5 billion deductible.
- Growth pipeline: innovative leaching (run rate approximately 240 million pounds in late 2025, target 300 million pounds in 2026), Bagdad concentrator expansion (+200 to 250 million pounds a year, approximately $3.5 billion, decision during 2026), El Abra mill project in Chile (over 700 million pounds a year), Kucing Liar in Indonesia (750 million pounds of copper and 735 thousand ounces of gold a year at full rates, ramp-up around 2030).
- 2026 guidance (Feb 2026): copper sales 3,380 million pounds, gold 800 thousand ounces, molybdenum 90 million pounds; unit net cash costs $1.75 per pound; operating cash flows approximately $8 billion at $5.00 copper; capital expenditures $4.3 billion.
- Balance sheet at December 31, 2025: debt $9.4 billion, cash $3.8 billion, net debt $2.3 billion excluding $3.2 billion of debt for PTFI's downstream processing facilities; dividends $0.60 per share; approximately 29,000 employees plus large contractor workforces.
- PTFI is seeking a long-term extension of its operating rights beyond 2041; FCX expects to keep approximately 49% of PTFI through 2041 and approximately 37% from 2042.
- Key risks: commodity prices, Grasberg restart and underground mining risk, Indonesian regulation and Papua instability, U.S. tariff policy (Section 232), water, tailings, labor and cost inflation.

### [Quarterly Report on Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/831259/000083125926000051/fcx-20260930.htm)

Interim report · 2026-11-06

- Q3 2026 (10-Q filed November 6, 2026): revenues $7,546 million (Q3 2025: $6,972 million), operating income $2,353 million, net income attributable to common stockholders $1.2 billion versus $0.7 billion; first nine months net income $3.0 billion versus $1.8 billion.
- Operating income from the U.S. copper mines more than doubled and from South America rose over 90% in the first nine months, on higher copper and molybdenum prices; Indonesia remained lower during the Grasberg ramp-up.
- November 2026: the Board approved a $4.5 billion Bagdad expansion and modernization program to more than double mining and milling rates, adding approximately 225 million pounds of copper a year (to over 400 million) with initial production targeted for mid-2030.
- Grasberg mill throughput averaged 141 thousand metric tons of ore per day in Q3 (approximately 67% of capacity); 80% expected mid-2027 and near full capacity by year-end 2027; PTFI's smelter re-commenced in late August 2026.
- February 2026 MOU with the Indonesia government for a life-of-resource extension beyond 2041; IUPK extension application filed June 2026; FCX keeps 48.76% through 2041 and approximately 37% from 2042.
- 2026 outlook: copper sales 3.0 billion pounds, gold 649 thousand ounces, molybdenum 93 million pounds; unit net cash costs $1.90 per pound; operating cash flows $8.5 billion; capex $4.4 billion; idle facility and restoration costs $1.2 billion.
- El Abra (Chile) submitted its environmental impact study in March 2026 for a mill project of over 700 million pounds a year, capital approximately $7.5 billion.
- $955 million returned to shareholders in nine months ($650 million dividends, $305 million buybacks); net debt $1.8 billion; Cerro Verde stake raised to 55.66% for $107 million.

### [Freeport-McMoRan Q3 2026 earnings call transcript](https://fortune.com/company/freeport-mcmoran/earnings/q3-2026/)

Executive talk · Kathleen Quirk, President and Chief Executive Officer · 2026-10-27

- Q3 2026 earnings call (October 27, 2026), led by CEO Kathleen Quirk with Chairman Richard Adkerson and CFO Maree Robertson.
- Grasberg ramp-up reached 67% of mine capacity; target 80% by mid-2027 and near full capacity by end-2027; both Indonesian smelters now running.
- Volume path: about 3 billion pounds of copper in 2026, 3.7 billion in 2027 and over 4 billion in 2028, growth that "does not require new capital"; aspiration of 4.5 to 5 billion pounds around 2030 with leaching and Bagdad.
- Next-generation proprietary leach additive shows lab recoveries "more than four times" the first additive; field deployment in 2027; 300 million pounds targeted in 2027, 800 million pounds an aspiration by 2030.
- Bagdad expansion decision expected in Q4 2026 at about $4.5 billion, roughly 3.5 years to build, adding 200 to 250 million pounds of copper and 10 to 12 million pounds of molybdenum a year.
- Energy costs about $500 million higher in 2026 than 2025, mainly diesel; 2026 capex $4.4 billion, 2027 $5.2 billion (up about $400 million).
- Modeled 2027-28 EBITDA from over $12 billion at $5 copper to $19.5 billion at $7; $6.6 billion returned to shareholders since 2021; Quirk "would not rule out M&A" but organic growth is the base case.

### [Freeport-McMoRan Q2 2026 earnings call transcript](https://fortune.com/company/freeport-mcmoran/earnings/q2-2026/)

Executive talk · Kathleen Quirk, President and Chief Executive Officer · 2026-07-23

- Q2 2026 earnings call (July 23, 2026): Chairman Richard Adkerson described the results in one word, "progress"; CEO Kathleen Quirk and CFO Maree Robertson presented.
- U.S. mining operations made 2.4 times more operating income in H1 2026 than H1 2025; consolidated net income rose 65%; Morenci mining rates in Q2 were 30% above the five-year average.
- Grasberg Block Cave doubled production rates from 34,000 tons per day in April to 69,000 in June; targets 65% of capacity in H2 2026, 80% by mid-2027, near full by end-2027.
- Bagdad expansion capital estimate in the $4.5 billion range, about 30% above 2023, still supported at $4 copper; final decision sought in H2 2026.
- MOU for life-of-resource extension signed in February, formal application filed in June; Adkerson met Indonesia's president, who was "very positive and encouraging".
- FCX seeks a Section 45X 10% production tax credit for copper, worth about $500 million a year; about $6 billion of U.S. NOLs.
- 2027 capex estimated at $4.8 billion; 2026 unit net cash costs $1.90 per pound; $6.3 billion returned to shareholders since 2021.

## Questions about Freeport-McMoRan

### What does Freeport-McMoRan do?

Freeport-McMoRan mines copper, gold and molybdenum in Indonesia, the United States, Peru and Chile, and refines copper into cathode and rod for wire and cable makers.

### What is Freeport-McMoRan's revenue?

FY2025 revenues were $25,915 million, with net income attributable to common stock of $2.2 billion. Nine-month 2026 revenues were $20,809 million.

### How many employees does Freeport-McMoRan have?

Approximately 29,000 employees, of which 13,900 in the U.S., 7,300 in South America and 6,600 in Indonesia, plus large contractor workforces.

### What is Freeport-McMoRan's growth strategy?

Organic, brownfield growth: restore Grasberg, scale innovative leaching, expand Bagdad and develop El Abra and Kucing Liar, aiming at 4.5 to 5 billion pounds of copper a year around 2030.

### Who leads Freeport-McMoRan?

Kathleen Quirk is President and CEO, Maree Robertson is EVP and CFO and Richard Adkerson is Chairman.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_