# GE Vernova account plan

> GE Vernova makes gas, nuclear, wind and grid equipment whose installed base generates about 25% of the world's electricity; FY2025 revenue was $38.1 billion.

## At a glance

GE Vernova is the electric power equipment and services company spun off from General Electric on April 2, 2024, headquartered in Cambridge, Massachusetts. It designs, builds and services gas, nuclear, hydro and steam power equipment, onshore and offshore wind turbines, and grid and power-conversion equipment and software, for utilities, power producers, governments, industry and, increasingly, hyperscalers and data centers. Its installed base generates approximately 25% of the world's electricity. FY2025 total revenues were $38.1 billion (+9%), net income $4.9 billion (including a $2.9 billion tax benefit) and free cash flow $3.7 billion, with approximately 75,000 employees in 97 countries. Backlog (RPO) reached $176.3 billion at June 30, 2026.

## Business units

- **Power** (about 52% of FY2025 revenue ($19,767 million)): Gas Power (heavy-duty and aeroderivative turbines plus long-term services on ~7,000 installed gas turbines), Nuclear Power including small modular reactors with Hitachi, and Hydro Power; Steam Power was folded into these units from January 1, 2026. Gas turbine orders rose to 173 in 2025, driven by utilities and data centers, and Q2 2026 segment EBITDA margin was 18.8%.
- **Electrification** (about 25% of FY2025 revenue ($9,642 million)): Transformers, switchgear, HVDC and AC substations, synchronous condensers, energy storage and grid software, reorganised in 2026 into Power Transmission, Grid Systems Integration, Power Conversion & Storage and Grid Automation & Software. Revenue grew 28% in 2025 and 68% in Q2 2026 with the Prolec GE acquisition, with over $5 billion of data center orders in H1 2026.
- **Wind** (about 24% of FY2025 revenue ($9,110 million)): Onshore Wind turbines and services (installed base ~59,000 units, now including LM Wind Power blades) and Offshore Wind with the Haliade-X turbine. The segment posted an EBITDA loss of $598 million in 2025 on Offshore Wind contract losses, and orders are weak in North America.

## Strategic priorities

- **Expand gas turbine capacity**: Gas output moves to 20 GW annualized from Q3 2026, 24 GW in 2028 and a 30 GW target for 2030 inside existing factories, funded by customer down payments; gigawatts under contract are expected to reach at least 125 GW by end of 2026.
- **Grow Electrification and data center business**: Electrification revenue is guided at $14.5-15 billion for 2026 at an 18%-20% margin, with new products such as a 5 MW solid-state transformer prototype for a hyperscaler and MV-UPS stability blocks.
- **Margin expansion and cost reduction**: A $600 million G&A cost reduction target by 2028, lean manufacturing, workhorse products and better underwriting; investors were told of a goal to grow revenues nearly 50% by 2028 from 2025 while more than doubling profit margins.
- **R&D in next-generation power**: Approximately $5 billion of cumulative R&D from 2025 through 2028, including small modular reactors, solid oxide fuel cells and GridOS software.
- **Shareholder returns**: Return at least 1/3 of cash generation to stockholders; ~$7 billion bought back under a $10.0 billion program, and the quarterly dividend doubled to $0.50 per share.
- **Contain Wind losses**: Keep wind focused on selected markets and workhorse products while finishing Offshore Wind projects; Wind is guided to about $400 million of EBITDA losses in 2026.

## Latest results

In Q2 2026 (quarter to June 30, 2026) total revenues rose 22% to $11,104 million (+12% organically), net income was $649 million and Adjusted EBITDA $1,250 million (11.3% margin vs 8.5%). Power revenue grew to $5,477 million with 113 gas turbines ordered in the quarter, and Electrification revenue rose 68% to $3,637 million, while Wind revenue fell 10% with a $275 million segment EBITDA loss. Backlog reached $176.3 billion and H1 free cash flow was $9.9 billion, driven by down payments and slot reservation agreements. 2026 guidance was raised to revenue of $45.5-46.5 billion and free cash flow of $11.5-12.5 billion, with an adjusted EBITDA margin of 12%-14%.

## Investments and deals

- **Prolec GE acquisition**: The remaining 50% of the Prolec GE transformer business was acquired from Xignux on February 2, 2026 for ~$5.3 billion, adding ~10,000 employees and seven manufacturing sites; funded partly by $2.6 billion of senior notes.
- **Factory capacity and machines**: About 400 new machines installed in Gas Power by year-end 2026 and capacity investments in Electrification; more than $600 million pledged for U.S. operations.
- **Divestments**: Sale of the Proficy manufacturing software business (a $0.3 billion pre-tax gain), Linden VFT and the remaining interest in China XD Electric.
- **Research partnerships**: A $50 million partnership with MIT covering research funding, fellowships, internships and executive development.
- **Share buybacks**: 8.2 million shares repurchased for $3.3 billion in 2025 and $3.6 billion in H1 2026 under the $10.0 billion authorization.

## Challenges and risks

- **Offshore Wind execution**: Incremental Offshore Wind contract losses of $637 million in 2025, including blade removal at Vineyard Wind, a U.S. lease pause in December 2025 and remaining claims with the customer.
- **Weak onshore wind orders**: Wind orders fell 40% in Q2 2026 and the CEO says it remains difficult to call an inflection point in U.S. orders.
- **Supply chain and tariffs**: Sole-sourced semiconductors, specialty metals and rare earths are named risks; tariffs cost ~$250 million in 2025 and are estimated at $100 million to $200 million in 2026.
- **Lead times and capacity**: Electrification lead-times have increased because demand outstrips supply, and the HA gas turbine fleet will need service capacity as 325 units on contract come online.
- **Energy policy and affordability**: Shifting decarbonization policies weigh on wind, and the CEO expects electricity affordability to become a growing concern.

## What leadership says

> "The world hasn't had this much growth trajectory and need for electric power since World War II" — Scott Strazik, Chief Executive Officer, Semafor, The CEO Signal interview, February 2026

> "AI needs the electron to meet the moment" — Scott Strazik, Chief Executive Officer, Semafor, The CEO Signal interview, February 2026

> "We only have 130 of our HAs running right now. We have 325 on contract" — Scott Strazik, Chief Executive Officer, Q2 2026 earnings call, July 22, 2026

> "It remains difficult to call an inflection point in U.S. orders" — Scott Strazik, Chief Executive Officer, Q2 2026 earnings call, July 22, 2026, on Wind


## Where a supplier can help

- **Manufacturing equipment and automation**: Tied to the gas turbine capacity priority: the ramp to 30 GW in 2030 within existing factories relies on lean and about 400 new machines in Gas Power.
- **Components and specialty materials supply**: Tied to the supply chain challenge: GE Vernova buys ~$20 billion a year of materials and components and faces sole-source risks, so qualified second sources are valuable.
- **Transformer and switchgear capacity**: Tied to the Electrification priority and lead-time challenge: demand for transformers and switchgear outstrips supply, and $800 million of U.S. transformer orders were fulfilled from global factories.
- **Indirect cost reduction**: Tied to the $600 million G&A cost reduction target: GE Vernova negotiated ~20% savings on an additional ~$300 million of spend, a sign it is re-sourcing indirect categories.
- **Workforce hiring and training**: Tied to the capacity priority: labor for the Greenville gas turbine ramp was hired a year ahead to train, and service outages for the growing HA fleet will need skilled crews.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Form 10-K 2025 (fiscal year ended December 31, 2025)](https://www.sec.gov/Archives/edgar/data/1996810/000199681026000015/gev-20251231.htm)

Annual report · 2026-01-29

- GE Vernova is the electric power equipment and services company spun off from General Electric on April 2, 2024; headquartered in Cambridge, Massachusetts, ~75,000 employees, and its installed base generates approximately 25% of the world's electricity.
- FY2025: total revenues $38.1 billion (+9%), net income $4.9 billion (boosted by a $2.9 billion tax benefit, mainly a U.S. valuation allowance release), Adjusted EBITDA $3.2 billion (8.4% margin), free cash flow $3.7 billion vs $1.7 billion in 2024.
- Backlog (RPO) reached $150.2 billion at December 31, 2025, up $31.2 billion (26%); $64,245 million equipment and $85,993 million services.
- Three segments: Power ($19,767 million revenue, 14.7% segment EBITDA margin), Electrification ($9,642 million, 14.9% margin, revenue +28%) and Wind ($9,110 million, segment EBITDA loss of $598 million).
- Gas Power is the engine: 173 gas turbine orders (29.8 GW) in 2025 vs 112 in 2024, driven by demand from utilities and from hyperscalers and data centers; a gas turbine installed base of ~7,000 units, ~1,800 under long-term service agreements.
- Capital allocation: return at least 1/3 of cash generation to stockholders; buyback authorization raised to $10.0 billion (8.2 million shares repurchased for $3.3 billion in 2025); quarterly dividend doubled to $0.50 per share from February 2026.
- M&A and portfolio: agreed to buy the remaining 50% of Prolec GE (transformers, ~10,000 employees) for ~$5.3 billion; signed sales of the Proficy manufacturing software business and of Linden VFT.
- Plans ~$5 billion of cumulative R&D from 2025 through 2028; buys ~$20 billion a year of materials and components from over 100 countries.
- Main risks: product quality, supply chain and tariffs (~$250 million cost impact in 2025), Offshore Wind execution (incremental contract losses of $637 million in 2025, Vineyard Wind), energy policy shifts, competition from Siemens Energy, Mitsubishi Power, Vestas, Hitachi Energy, ABB and others.

### [Form 10-Q for the quarter ended June 30, 2026](https://www.sec.gov/Archives/edgar/data/1996810/000199681026000148/gev-20260630.htm)

Interim report · 2026-07-22

- Q2 2026 (quarter to June 30, 2026): total revenues $11,104 million (+22%; +12% organically), net income $649 million, Adjusted EBITDA $1,250 million (11.3% margin vs 8.5%).
- Backlog (RPO) $176.3 billion at June 30, 2026, up $26.0 billion since December 31, 2025; equipment RPO $87,821 million.
- Prolec GE acquired on February 2, 2026 for ~$5.3 billion; remeasurement of the prior 50% stake produced a $4.0 billion pre-tax gain in Q1 2026; funded partly by $2.6 billion of senior notes.
- Business units realigned from January 1, 2026: Electrification now reports Power Transmission, Grid Systems Integration, Power Conversion & Storage and Grid Automation & Software; Steam Power was folded into other Power units; LM Wind Power merged into Onshore Wind.
- Power: Q2 revenue $5,477 million, segment EBITDA margin 18.8%; 113 gas turbines ordered in the quarter (12.1 GW) vs 47; Power RPO $111,649 million.
- Electrification: Q2 revenue $3,637 million (+68%, +29% organically), segment EBITDA margin 18.4%; Power Transmission revenue rose to $1,877 million from $759 million.
- Wind: Q2 revenue $2,026 million (-10%), segment EBITDA loss of $275 million, Onshore Wind deliveries and North American orders down; Vineyard Wind turbines all installed in Q1 2026.
- Cash: H1 operating cash flow $10.7 billion and free cash flow $9.9 billion, driven by down payments and slot reservation agreements; cash $13.1 billion; $3.6 billion of buybacks in H1, $7.0 billion cumulative under the $10.0 billion program.
- Tariff impact estimated at $100 million to $200 million in 2026; Proficy sold (a $0.3 billion pre-tax gain).

### [GE Vernova Q2 2026 earnings call transcript](https://bullfincher.io/companies/ge-vernova/earnings-call/fy2026-q2)

Executive talk · Scott Strazik, Chief Executive Officer · 2026-07-22

- CEO Scott Strazik: backlog of $176 billion, up $13 billion in the quarter and "on track to reach $200 billion in 2027"; Q2 equipment orders more than doubled and service orders grew 15%.
- Gas Power signed 20 GW of orders and slot reservation agreements in Q2 (U.S., Brazil, Qatar); gigawatts under contract went from 100 to 116, expected to reach at least 125 GW by year-end; ~100 customers in 26 countries, ~20% data centers.
- Capacity: 20 GW annualized gas output from Q3 2026, 24 GW in 2028 and a new 30 GW target for 2030 inside the existing factory footprint, "all funded by customer down payments"; 2030 mostly sold out and over half of 2031 contracted by year-end.
- Electrification: $2.7 billion of data center orders in Q2, over $5 billion in H1 2026 (more than double full-year 2025); equipment backlog above $40 billion; Prolec GE delivered nearly $900 million of Q2 revenue.
- New products: 5 MW solid-state transformer prototype for a hyperscaler later this year, MV-UPS "stability block" technology, solid oxide fuel cells in validation; Strazik sees data center scope entitlement at 2 to 3 times today's.
- CFO Ken Parks raised 2026 guidance: revenue $45.5-46.5 billion, free cash flow $11.5-12.5 billion (from $6.5-7.5 billion), adjusted EBITDA margin 12%-14% unchanged.
- Segment guide: Power organic revenue +18%-20% at 17%-19% margin; Electrification revenue $14.5-15 billion at 18%-20% margin; Wind about $400 million of EBITDA losses.
- Cost and capital: $600 million G&A cost reduction target by 2028; ~$7 billion of buybacks at an average $560 per share; priorities include "opportunistic inorganic growth, especially in electrification".

### [The CEO behind GE Vernova's $200B power surge (Semafor, The CEO Signal)](https://www.semafor.com/article/02/05/2026/the-ceo-behind-ge-vernovas-power-surge)

Executive talk · Scott Strazik, Chief Executive Officer · 2026-02-06

- Semafor's CEO Signal profile and interview of Scott Strazik (February 2026): he calls GE Vernova a 75,000-person startup, less than two years after the April 2024 spin-off.
- Strazik's thesis: "The world hasn't had this much growth trajectory and need for electric power since World War II"; "AI needs the electron to meet the moment"
- AI accounts for only 10% of the order backlog (which rose by a quarter to $150 billion last year) but could drive a third of orders in the next few years, he estimates.
- Affordability of electricity is "going to be a higher and higher drum beat from here".
- On culture after GE: "Focus matters"; after the listing "we didn't have the resources for hobbies"; leaders get "authentic adult conversations" about what matters.
- Investor targets cited by Semafor: revenues up nearly 50% by 2028 from 2025's $38 billion, with profit margins more than doubled.
- Bets: more than $600 million pledged for U.S. operations, part of a $5 billion R&D budget toward small nuclear reactors, a $50 million MIT partnership; HQ moved from Schenectady to Cambridge to attract talent.
- Headwind: U.S. moves to halt offshore wind construction weigh on the wind division (Vineyard Wind 1).

## Questions about GE Vernova

### What does GE Vernova do?

GE Vernova designs, builds and services equipment that generates, transmits, converts and stores electricity: gas, nuclear and hydro power plants, wind turbines, and grid equipment and software.

### What is GE Vernova's revenue?

FY2025 total revenues were $38.1 billion, up 9%. Q2 2026 revenues were $11,104 million, and 2026 guidance is $45.5-46.5 billion.

### How many employees does GE Vernova have?

Approximately 75,000 employees at the end of 2025, across roughly 600 sites in 97 countries.

### Who leads GE Vernova?

Scott Strazik is CEO, Kenneth Parks is CFO and Stephen Angel is Non-Executive Chair of the Board.

### What is GE Vernova's strategy?

To serve rising electricity demand by expanding gas turbine and grid equipment capacity, servicing its installed base, improving margins through lean and cost cuts, and returning at least 1/3 of cash generation to stockholders.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_