# Ignitis Group account plan

> Ignitis Group is a state-controlled Lithuanian utility in renewables, networks and energy supply, with EUR 2,497.7 million of revenue in 2025.

## At a glance

Ignitis Group is a renewables-focused integrated utility active in the Baltic states, Poland and Finland: it builds wind, solar, hydro and battery assets, runs Lithuania's electricity and gas distribution network through ESO, operates gas-fired reserve plants and supplies electricity and gas to the largest customer portfolio in the Baltics. In 2025 it reported revenue of EUR 2,497.7 million (+8.3%), Adjusted EBITDA of EUR 546.1 million and Adjusted Net Profit of EUR 225.7 million. The Group had a headcount of 4,851 at 31 December 2025. The Republic of Lithuania owns 74.99% through the Ministry of Finance, and the shares trade on Nasdaq Vilnius (IGN1L) and as GDRs on the London Stock Exchange.

## Business units

- **Green Capacities** (48.2% of 2025 Adjusted EBITDA (EUR 291.5 million)): Develops and operates onshore wind, hydro (including the Kruonis pumped-storage plant), solar, battery storage and waste and biomass CHPs in Lithuania, Latvia, Poland and Estonia, with 2.13 GW installed at end-2025. Run through Ignitis Renewables, led by CEO Frank Oomen since July 2025. Adjusted EBITDA fell 8.8% to EUR 196.4 million in 9M 2026 as hedge prices and balancing capacity results fell.
- **Networks** (53.4% of 2025 Adjusted EBITDA (EUR 263.4 million)): Fully regulated country-wide electricity and gas distribution in Lithuania through ESO, serving 1,894 thousand electricity customers on a 133 thousand km network. Adjusted EBITDA grew 19.8% in 2025 and 7.1% in 9M 2026 on a higher RAB; the 2027 RAB was set at EUR 2.2 billion with WACC 5.83%.
- **Reserve Capacities** (6.9% of 2025 Adjusted EBITDA (EUR 37.7 million)): Gas-fired units at the Elektrėnai Complex (1,055 MW) providing system reserve and balancing services to Lithuania's TSO, operated by Ignitis Gamyba. It won Polish capacity auctions for 2026 and 2030, but Adjusted EBITDA fell 39.5% to EUR 21.0 million in 9M 2026 on weaker balancing capacity services.
- **Customers & Solutions** (-8.9% of 2025 Adjusted EBITDA (EUR -48.5 million)): Electricity and gas supply (UAB Ignitis) and e-mobility (Ignitis ON) to 1.4 million electricity and 0.6 million gas customers in the Baltic states, Poland and Finland. It lost money in 2025 on prosumer net-metering and imbalance costs, then turned positive at EUR 12.5 million of Adjusted EBITDA in 9M 2026 after the prosumer law change; Andrius Kavaliauskas became CEO of UAB "Ignitis".

## Strategic priorities

- **Green capacity build-out**: The Strategic Plan 2026–2029 targets 2.8–3.2 GW of Green Capacities by 2029 and keeps the 4–5 GW goal for 2030, with a focus on green flexibility (batteries, pumped-storage hydro) and a value-over-volume approach.
- **Network investment and resilience**: The updated 10-year (2026–2035) network plan proposes EUR 4.4 billion (+26%), split between resilience and modernisation (EUR 2.27 billion) and new customers and renewables (EUR 2.15 billion); a second smart meter phase starts in 2026, aiming for 99% smart meters by end-2033.
- **Investment envelope**: The Strategic Plan 2026–2029 plans EUR 2.5–3.0 billion of Investments (about EUR 625–750 million a year), about 55% to Networks and about 40% to Green Capacities.
- **Asset rotation**: The Group divests up to 49% of equity stakes in completed projects; the first deal, 49% of Vilnius CHP to Quaero Capital for EUR 120 million (4.6x equity invested), closed in March 2026.
- **Financial and dividend targets**: Net Debt/Adjusted EBITDA below 5x, a 'BBB' or better rating and dividend growth of at least 3% a year; the 2026 dividend is to rise 10% to EUR 1.504 per share, with the DPS floor reaching EUR 1.64 per share in 2029.
- **AI and automation**: More than 75% of employees regularly use AI-powered solutions, and the 2026 goal is to automate parts of customer service across most channels; a new data centre business line (UAB "Ignitis Data Center Solutions") was created.

## Latest results

In the first nine months of 2026 Adjusted EBITDA rose 6.2% to EUR 430.4 million, led by Customers & Solutions and Networks, while Adjusted Net Profit fell 18.1% to EUR 145.5 million on higher depreciation and lower financial results. Reported revenue rose 18.1% to EUR 2,124.2 million. Investments fell 18.4% to EUR 432.4 million, 65.4% of it in Networks. Net Debt was EUR 1,960.6 million and Net Debt/Adjusted EBITDA LTM 3.43x. Full-year 2026 Adjusted EBITDA guidance was narrowed to EUR 575–600 million, with Investments guidance of EUR 590–690 million reiterated.

## Investments and deals

- **Projects under construction**: 0.7 GW under construction (~EUR 422.3 million): Kruonis PSHP expansion (110 MW, 2027), Kelmė, Kruonis and Mažeikiai BESS (2027) and Tume BESS (107 MW / 215 MWh, 2028); Tume SF (174 MW) reached COD in November 2026, taking capacity to 2.3 GW.
- **Vilnius CHP stake sale**: 49% sold to Quaero Capital for EUR 120 million (EUR 110 million fixed plus EUR 10 million earn-out), closed in March 2026.
- **Curonian Nord offshore wind**: The 700 MW project became fully owned after buying Ocean Winds' 49% stake; the Group is now seeking a revised implementation schedule.
- **Data centres**: A partner search for the controlling stake in UAB "Kruonis DC" began on 11 August 2026.
- **Green financing**: An inaugural EUR 300 million European Green Bond (4.500% coupon, due 2031) after the 9M period, and EUR 318 million of non-recourse financing for Kelmė WF in 2025.

## Challenges and risks

- **Lower power and balancing prices**: Green Capacities' hedge price fell from EUR 130/MWh to EUR 82/MWh and balancing capacity prices dropped as the market matured; Reserve Capacities is now guided lower year on year.
- **Falling net profit**: Adjusted Net Profit fell 18.7% in 2025 and 18.1% in 9M 2026, and basic EPS fell to EUR 2.26 in 2025 from 3.82.
- **Rising leverage**: Net Debt/Adjusted EBITDA rose to 3.50x at end-2025 and FCF was EUR -192.0 million in 2025.
- **Grid resilience**: The 22 August 2026 storm cut supply to more than 680 thousand customers; NERC opened an inspection of ESO and ESO's CEO and board resigned. Critical infrastructure failure and cybersecurity are among the top risks.
- **Regulatory and political risk**: Sector regulatory and political risk was raised to 'Very high', linked to political challenge over Curonian Nord and to prosumer net-metering.

## What leadership says

> "Record strategic progress with +0.7 GW of new green capacities installed, completed mass smart meter roll-out, and Adjusted EBITDA beat" — Darius Maikštėnas, CEO and Chair of the Management Board, Integrated Annual Report 2025 (25 February 2026)

> "We will only be doing that at attractive price points, like in this case." — Jonas Rimavičius, CFO, Full-year 2025 results call, 25 February 2026, on further asset rotation

> "our main goal is to ensure not only EBITDA but also net profit growth" — Jonas Rimavičius, CFO, 9M 2026 results call, 11 November 2026

> "foremost priority is to ensure strong business continuity" — Alfonso Faubel, Chair of the Supervisory Board, Integrated Annual Report 2025 (25 February 2026)


## Where a supplier can help

- **Grid modernisation and storm resilience**: Tied to the network investment priority and the grid resilience challenge: a EUR 4.4 billion network plan with a large resilience share, underground cabling and a second smart meter phase calls for equipment, field services and grid monitoring suppliers.
- **Battery and flexibility projects**: Tied to the projects under construction: four BESS projects and the Kruonis PSHP expansion need EPC, grid connection, control software and operations support.
- **Customer service automation**: Tied to the AI and automation priority: the 2026 goal of automating parts of customer service across most channels fits AI, contact-centre and CRM vendors serving a large retail base.
- **Cybersecurity for critical infrastructure**: Tied to the grid resilience challenge: cybersecurity and critical infrastructure failure are named top risks, pointing to security and OT monitoring providers.
- **Data centre partnerships**: Tied to the data centre investment: the new data centre business line and the Kruonis DC partner search open the door to data centre developers, operators and advisers.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Integrated Annual Report 2025](https://ignitisgrupe.lt/sites/default/files/public/inline-files/Integrated%20Annual%20Report%202025.pdf)

Annual report · 2026-02-25

- Ignitis Group is a state-controlled (74.99% Republic of Lithuania, via the Ministry of Finance), "renewables-focused integrated utility" listed on Nasdaq Vilnius (IGN1L) and the LSE (GDRs), active in the Baltic states, Poland and Finland; four segments: Green Capacities, Networks, Reserve Capacities, Customers & Solutions.
- 2025: revenue EUR 2,497.7 million (+8.3%); Adjusted EBITDA EUR 546.1 million (+3.4%), above the EUR 510–540 million guidance; Adjusted Net Profit EUR 225.7 million (-18.7%); Investments EUR 720.3 million (53.1% Networks, 39.7% Green Capacities).
- Installed Green Capacities rose by 0.7 GW to 2.1 GW as six projects reached COD (Kelmė WF 313.7 MW, Silesia WF II 136.8 MW, Latvian solar cluster Varme/Stelpe I/Stelpe II, Polish solar 24 MW); Secured Capacity 3.4 GW after FIDs on three Lithuanian BESS projects.
- Networks (ESO, Lithuania's DSO) delivered the largest Adjusted EBITDA (EUR 263.4 million, +19.8%) on higher RAB and WACC; the mass smart meter roll-out was completed with 1.3 million meters; the 10-year (2024–2033) Investment Plan rises 40% to EUR 3.5 billion.
- Customers & Solutions swung to Adjusted EBITDA of EUR -48.5 million, hit by prosumer net-metering losses (EUR -28.5 million) and imbalance costs; legislative changes to the prosumer model were adopted by the Government in December 2025.
- Strategic Plan 2025–2028: invest EUR 3.0–4.0 billion, reach 2.6–3.0 GW installed green capacity by 2028 and 4–5 GW by 2030, Adjusted EBITDA EUR 600–680 million in 2028, Net Debt/Adjusted EBITDA below 5x, dividend growth of at least 3% a year.
- Leverage rose: Net Debt EUR 1,912.0 million (+18.6%), Net Debt/Adjusted EBITDA 3.50x, FFO/Net Debt 21.0%; S&P reaffirmed 'BBB+' (stable). Dividend EUR 1.366/share (EUR 98.9 million) for 2025.
- 2026 guidance: Adjusted EBITDA EUR 550–600 million, Investments EUR 590–690 million, mostly Networks plus BESS and the Kruonis PSHP expansion. First asset rotation: 49% of Vilnius CHP to Quaero Capital at EUR 120 million (4.6x equity invested).
- Top risks include market risks and sector regulatory/political risk (both raised to 'Very high' in Q1 2025, the latter linked to political challenge over the Curonian Nord 700 MW offshore wind project), large-capital project execution, critical infrastructure failure and cybersecurity.

### [First nine months 2026 interim report](https://ignitisgrupe.lt/sites/default/files/public/inline-files/First%20nine%20months%202026%20interim%20report.pdf)

Interim report · 2026-11-11

- 9M 2026 Adjusted EBITDA EUR 430.4 million (+6.2% YoY), led by Customers & Solutions and Networks; Adjusted Net Profit EUR 145.5 million (-18.1%); reported revenue EUR 2,124.2 million (+18.1%).
- Full-year 2026 Adjusted EBITDA guidance narrowed to EUR 575–600 million (from 550–600); Investments guidance EUR 590–690 million reiterated; Reserve Capacities now expected lower YoY.
- Customers & Solutions Adjusted EBITDA turned positive at EUR 12.5 million (vs EUR -43.0 million) after the new prosumer law: the Group recognised a receivable for part of prosumer losses from March 2025 to September 2026, plus lower imbalance costs.
- Green Capacities Adjusted EBITDA fell 8.8% to EUR 196.4 million and Reserve Capacities 39.5% to EUR 21.0 million on weaker balancing capacity services; Networks rose 7.1% to EUR 206.4 million.
- Investments EUR 432.4 million (-18.4%), 65.4% in Networks; the updated 10-year (2026–2035) network plan proposes EUR 4.4 billion (+26%). Strategic Plan 2026–2029 targets EUR 2.5–3.0 billion of investment, about 55% Networks and 40% Green Capacities.
- Installed Capacity 2.1 GW, 0.7 GW under construction (Kruonis PSHP expansion, four BESS); Tume SF (174 MW) reached COD after the period, taking capacity to 2.3 GW. Curonian Nord offshore wind: the Group is seeking a revised schedule.
- Vilnius CHP 49% stake sale to Quaero Capital completed in March 2026; 2026 dividend to rise 10% to EUR 1.504/share (EUR 108.9 million). Inaugural EUR 300 million European Green Bond (4.500%, 2031); Moody's assigned 'Baa1', S&P reaffirmed 'BBB+'.
- An August 2026 storm cut power to over 680 thousand customers; ESO's CEO and board resigned. Vytenis Koryzna (CCO) approved as final candidate to succeed CEO Darius Maikštėnas, whose term ends 28 February 2027. New data centre business line (UAB "Ignitis Data Center Solutions") and partner search for UAB "Kruonis DC".

### [Investor presentation: full-year 2025 results — earnings call transcript](https://ignitisgrupe.lt/sites/default/files/public/inline-files/Transcript.%20Investor%20presentation_full-year%202025%20results.pdf)

Executive talk · Darius Maikštėnas, Chair of the Management Board and CEO (with Jonas Rimavičius, CFO) · 2026-02-25

- Full-year 2025 results call (25 February 2026) with CEO Darius Maikštėnas and CFO Jonas Rimavičius: Adjusted EBITDA EUR 546 million (+3%), above guidance for the fifth straight year since the IPO.
- Debut asset rotation: 49% of Vilnius CHP to Quaero Capital for EUR 120 million (EUR 110 million fixed plus EUR 10 million earn-out) against EUR 26 million of equity invested, a 4.6x multiple; gain of close to EUR 100 million not booked under IFRS since control is kept.
- Proceeds go to the Green Capacities and Networks investment programme, not to debt repayment; further 49% stake sales: "We will only be doing that at attractive price points".
- Customers & Solutions Adjusted EBITDA was negative EUR 48 million, mainly from prosumers under net-metering and high imbalance costs; the CFO expects a return to profitability once the prosumer issue is solved.
- Lower EPS (EUR 2.26 vs 3.82) is attributed to two "temporary" items: the retail loss and close to EUR 70 million of over-collected regulatory amounts returned in Networks.
- 2026 guidance: Adjusted EBITDA EUR 550–600 million, Investments EUR 590–690 million focused on Networks and flexibility; Green Capacities flat as lower prices and expiring PPAs offset volume recovery.
- Three Lithuanian BESS projects target COD in early 2027; Kruonis PSHP will not mothball any unit and is adding a fifth.

### [Investor presentation: 9M 2026 results — earnings call transcript](https://ignitisgrupe.lt/sites/default/files/public/inline-files/Transcript.%20Investor%20presentation_9M%202026%20results.pdf)

Executive talk · Darius Maikštėnas, Chair of the Management Board and CEO (with Jonas Rimavičius, CFO) · 2026-11-11

- 9M 2026 results call (11 November 2026), CEO Darius Maikštėnas and CFO Jonas Rimavičius: Adjusted EBITDA EUR 430.4 million (+6%); full-year guidance narrowed to EUR 575–600 million.
- Dividend for 2026 to rise 10% to EUR 1.504/share, funded by the Vilnius CHP asset rotation gain; the DPS floor for 2029 becomes EUR 1.64 vs EUR 1.54 previously.
- Prosumer compensation accrual of around EUR 30 million in Q3; net prosumer result for 9M is around EUR -6 million, "much more manageable than before".
- Green Capacities EBITDA down 9% as the hedge price fell from EUR 130/MWh to EUR 82/MWh and balancing capacity prices dropped as the market matured.
- Tume SF (174 MW) reached COD, taking capacity to 2.3 GW; Kruonis PSHP expansion about 90% complete; Lithuanian BESS launch expected in the first half of 2027.
- Networks 10-year plan up 26% to EUR 4.4 billion gross, but net investment for the strategic period rises only around 3% as extra capex is mostly subsidised.
- Curonian Nord postponement proposal reflects demand forecasts "not materialising" and higher CAPEX/MWh; data centre partner search launched for UAB "Kruonis DC".

## Questions about Ignitis Group

### What does Ignitis Group do?

Ignitis Group generates green electricity, runs Lithuania's electricity and gas distribution network, operates gas-fired reserve plants and supplies electricity and gas in the Baltic states, Poland and Finland.

### What is Ignitis Group's revenue?

Revenue was EUR 2,497.7 million in 2025 with Adjusted EBITDA of EUR 546.1 million; in 9M 2026 reported revenue was EUR 2,124.2 million.

### How many employees does Ignitis Group have?

The Group had a headcount of 4,851 at 31 December 2025.

### What is Ignitis Group's strategy?

The Strategic Plan 2026–2029 focuses on green flexibility and Networks, with EUR 2.5–3.0 billion of Investments and 2.8–3.2 GW of Green Capacities by 2029.

### Who leads Ignitis Group?

Darius Maikštėnas is CEO until his term ends on 28 February 2027; Vytenis Koryzna, the CCO, was approved as final candidate to succeed him. Alfonso Faubel chairs the Supervisory Board.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_