# Jan De Nul Group account plan

> Jan De Nul Group is a private marine and construction contractor with EUR 4,236 million turnover in 2025 and a EUR 7.85 billion order book.

## At a glance

Jan De Nul Group, the trade name of Sofidra S.A. registered in Capellen, Luxembourg, is a privately held marine and construction contractor working across Offshore Energy, Dredging Solutions, Construction Projects and Planet Redevelopment. It owns a large specialised fleet and land-based equipment park and offers financing and concession models alongside construction. In 2025 net turnover was EUR 4,236 million (+6%), EBITDA EUR 812 million and net profit EUR 458 million, with Europe at 53.76% of turnover. The workforce was 8,848 people on 31 December 2025, and the group reinvests all of its profits.

## Business units

- **Offshore Energy**: Installs offshore foundations, high-voltage stations, wind turbines and inter-array and export cables and interconnectors. 2025 work included the Thor wind farm in Denmark and nearly a thousand kilometres of HVDC cable for ADNOC; the backlog includes TenneT's 525 kV HVDC portfolio and a five-year RWE charter. Together with Dredging Solutions it made 73.55% of 2025 turnover.
- **Dredging Solutions**: Builds ports, maintains waterways, protects coastlines and creates new land. 2025 projects included the Ndayane deep-water port in Senegal for DP World and a container quay in Valencia; it runs toll concessions on the Guayaquil channel in Ecuador and, from June 2026, Argentina's Paraná River.
- **Construction Projects**: Delivers mobility infrastructure, buildings and foundations, with record-high turnover in 2025. Projects include the Oosterweel Scheldt Tunnel in Antwerp, F-35A bases for Belgian Defence, the new Antwerp prison and Princess Elisabeth Island; together with Planet Redevelopment it made 26.45% of 2025 turnover.
- **Planet Redevelopment**: Remediates polluted soil, groundwater and sediments and redevelops abandoned sites, from procurement and design to sale. 2025 work included PFAS treatment for the Oosterweel Link and the MALT site in Mechelen.

## Strategic priorities

- **Subsea cable installation and protection**: The group is expanding its fleet for subsea energy cables with four new vessels and one conversion, betting on interconnectors and hybrid offshore projects driven by energy security.
- **Maintain or grow market share**: The group says it remains committed to maintaining or increasing market share across all its business activities, relying on its equipment and financial strength.
- **Long-term concessions**: A 25-year concession for the 1,400 km Paraná River in Argentina adds to the Guayaquil channel concession, with maintenance starting in August 2026 and deepening due by 2031.
- **Integrated offshore delivery**: Management positions the group's versatility in dredging and offshore installation to handle a wind farm's whole construction, as clients show renewed interest in integrated contracts.
- **Emissions reduction**: Targets are -40% for Scope 1 and 2 and -20% for Scope 3 by 2035; all new vessels carry ULEv technology filtering up to 99% of nanoparticles.

## Investments and deals

- **New-vessel programme**: Planned investments across all units are worth well over one billion euros, with seven new vessels under construction and one under conversion.
- **XL cable-laying vessels**: Fleeming Jenkin and William Thomson, each with 28,000 tonnes of cable capacity, are due in 2026.
- **Rock installation and trenching**: Rock installation vessel George W. Goethals (37,000 tonnes) is due in 2028, and trenching support vessel Isambard K. Brunel was ordered in January 2026.
- **Dredger fleet renewal**: A plug-in hybrid hopper dredger is under construction and two 20,000 m3 hopper dredgers are ordered for delivery in 2028 and 2029.
- **Land equipment and offices**: Over 110 new machines were added in 2025, mainly for the Oosterweel works, and a new 35,500 m2 office building in Aalst for 1,500 colleagues comes into use in 2026.

## Challenges and risks

- **Slowing client investment**: The CFO says international tensions, diplomatic uncertainty and rising energy prices are slowing clients' investment programmes and that 2026 promises to be a challenging year.
- **Lower order book**: The order book stood at EUR 7.85 billion at end-2025, lower than in 2024.
- **Offshore wind slowdown**: Rising interest rates, inflation, complex permitting and a shift of political attention to defence have eased the momentum behind large offshore projects, with US projects on hold.
- **Emissions growing with activity**: Scope 1 emissions were 1,346 kton CO2e in 2025 against 934 kton in 2019, and the group says it cannot yet decouple emissions from activity growth.
- **Fuel costs and geopolitical risk**: The Middle East conflict raised fuel prices, which affect some project costs, mostly covered by hedging, escalation formulas or contract terms.

## What leadership says

> "International tensions, diplomatic uncertainty and rising energy prices are putting the brakes on our clients' investment programmes. This trend will continue into 2026" — Jan Neckebroeck, CFO, Financial Report 2025, May 2026

> "Until now, investments in offshore wind energy have been driven by climate targets. That has changed fundamentally in recent years. The driving force now is energy security." — Wouter Vermeersch, Director Subsea Cables Offshore Energy, Interview on the company site, 9 March 2026

> "What we need most is a renewed push from governments to bring it back to the top of the agenda." — Philippe Hutse, Director Offshore Energy, Interview on the company site, 2 October 2025

> "It is the strongest possible validation of our technical performance, reliability, and long-term commitment." — Christophe Wante, Area Manager Dredging Solutions, Paraná River concession announcement, 19 June 2026


## Where a supplier can help

- **Vessel systems and equipment**: The new-vessel programme worth well over one billion euros creates demand for marine equipment, cable-handling, trenching and ULEv emissions systems.
- **Low-emission fuels and equipment**: Emissions targets for 2035 and new ships able to run on biofuel and methanol point to suppliers of alternative fuels, electric machines and emissions monitoring.
- **Cable protection and monitoring**: The growing focus on protecting and repairing subsea cables suggests a role for monitoring, inspection and rapid-repair technology.
- **Waterway concession operations**: The Paraná concession's buoy replacement and modernised monitoring of water level, volume and speed open room for navigation and hydrographic technology suppliers.
- **PFAS remediation technology**: Planet Redevelopment's PFAS treatment work fits partners offering water treatment and soil remediation techniques.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Financial Report 2025 (consolidated, Jan De Nul Group / Sofidra S.A.)](https://www.jandenul.com/sites/default/files/public/Financial%20Report%202025.pdf)

Annual report · 2026-05-21

- Jan De Nul Group (trade name of Sofidra S.A., registered in Capellen, Luxembourg) is a privately held marine and construction contractor with four business units: Offshore Energy, Dredging Solutions, Construction Projects and Planet Redevelopment.
- FY2025 net turnover was EUR 4,236 million (EUR 4,001 million in 2024), up 6%; EBITDA EUR 812 million (EUR 777 million), a 19% margin; net profit EUR 458 million, up 12%.
- Offshore Energy and Dredging Solutions made 73.55% of turnover (76.59% in 2024); Construction Projects and Planet Redevelopment 26.45% (23.41%), with Construction Projects at a record-high turnover.
- Europe was 53.76% of turnover (42.26% in 2024), Asia, Australia and Middle East 25.84%, America 13.12%, Africa 7.28% (1.08%), lifted by a new deep-water port in Ndayane, Senegal.
- Order book of EUR 7.85 billion at end-2025, lower than in 2024; the CFO expects 2026 to be "a challenging year" as geopolitical tensions and energy prices slow clients' investment programmes.
- Fortress balance sheet: equity EUR 4,238 million, solvency 60%, net cash EUR 1,295 million, net debt-free since 2014, with complete profit reservation.
- Planned investments across all units are "worth well over one billion euros": two XL cable-laying vessels (Fleeming Jenkin, William Thomson, 2026), rock installation vessel George W. Goethals (2028), trenching support vessel Isambard K. Brunel (ordered January 2026), a plug-in hybrid hopper dredger and two 20,000 m3 hopper dredgers.
- Key backlog: TenneT 525 kV HVDC portfolio (BalWin 4, LanWin 1, LanWin 5, almost 2,000 km of cable), RTE floating-wind export cables, Nordlicht 1 and 2, a five-year RWE charter of Voltaire and Les Alizés, Princess Elisabeth Island, the Oosterweel Scheldt Tunnel, F-35A bases for Belgian Defence and 49 Flemish bridges from 2027.
- Average staff 8,754 (of whom 2,707 through crewing agencies); staff costs EUR 620 million.

### [Impact Report 2025 (Jan De Nul Group annual activity report)](https://www.jandenul.com/sites/default/files/public/Jaarverslag%202025%20EN%20-%20web.pdf)

Report · 2026-05-21

- The 2025 activity report ("Impact Report 2025", 100 pages) of Jan De Nul Group, published 21 May 2026. It gathers selected elements of the financial and sustainability reports, organised by Water, Land, Energy, Investments, People and Footprint.
- Key figures: EUR 4.24 billion turnover, EUR 812 million EBITDA, EUR 458 million net profit, EUR 4.24 billion equity, EUR 7.85 billion order book, 298 projects, more than 8,800 "World Builders".
- 2025 activity: 97 million cubic metres of soil for new land, 22 ports, 32 waterways, 12 coastal areas, 37 roads, bridges, tunnels and junctions, 21 building complexes, 20 offshore wind farms, 400 km of subsea cable, 1.3 million tonnes of protective rock, 1 million tonnes of contaminated soil cleaned.
- Energy highlights: Thor (Denmark, 72 monopiles, more than 200 km of inter-array and 60 km of export cable), almost a thousand kilometres of HVDC cable for ADNOC in Abu Dhabi, 350 km of cable for Hornsea 3 (UK), Nordseecluster cables for TenneT, Princess Elisabeth energy island for Elia.
- Water and Land highlights: Ndayane port in Senegal for DP World, Palm Jebel Ali for Nakheel, the Itapoá beach widening in Brazil, the Oosterweel Scheldt Tunnel, F-35A bases, the Antwerp prison, the Brussels Ring interchange, MALT Mechelen and PFAS remediation.
- Investments: seven new vessels under construction and one under conversion, including the XL cable-layers Fleeming Jenkin and William Thomson (28,000 tonnes of cable each) and the rock installer George W. Goethals (37,000 tonnes, 2028).
- Workforce on 31 December 2025: 8,848 people (5,414 employees, 3,434 non-employee workers). LTI frequency rates: Maritime 1.94, Offshore Energy 0.46, Construction Projects 3.95.
- Emissions: Scope 1 at 1,346 kton CO2e in 2025 against 934 kton in base year 2019; targets of -40% for Scope 1 and 2 and -20% for Scope 3 by 2035; the group says it cannot yet decouple emissions from activity growth. The ULEv target was missed in 2025 because of the Oosterweel dredging works.

### [Jan De Nul awarded 25-year concession for Argentinean waterway](https://www.jandenul.com/news/jan-de-nul-awarded-25-year-concession-argentinean-waterway)

Report · 2026-06-19

- On 19 June 2026, Jan De Nul announced it had been awarded a 25-year concession to deepen, modernise and maintain Argentina's main waterway, the 1,400 km Paraná River. It collects toll fees from passing vessels.
- Jan De Nul has maintained the Paraná since 1995 and calls the re-award "a strong vote of confidence".
- The waterway is part of the Hidrovía Paraguay–Paraná; 75 to 80% of Argentina's agricultural exports (soybeans, corn, wheat) travel along it.
- Scope: deepening the navigation channel in the first years, replacing and maintaining 1,150 navigation buoys, and modernising the monitoring of water level, volume and speed.
- Maintenance starts in August 2026; key phases such as channel deepening are expected to be completed by 2031.
- Christophe Wante, Area Manager Dredging Solutions, calls it "the strongest possible validation of our technical performance, reliability, and long-term commitment".

### [Is there still room for renewables? (interview with Philippe Hutse)](https://www.jandenul.com/news/there-still-room-renewables)

Executive talk · Philippe Hutse, Director Offshore Energy · 2025-10-02

- Philippe Hutse, Director Offshore Energy at Jan De Nul, interviewed on the company site (2 October 2025) about the offshore wind slowdown.
- Cause of the slowdown: defence and national security now take political attention and investment, while rising interest rates, inflation and complex permitting (grid connections) add pressure, so the momentum behind large offshore projects "has eased, at least for now".
- Offshore wind is not over: what is missing is the exponential growth governments and the EU once envisioned. Jan De Nul "never fully believed in those sky-high projections" and has long argued for realistic targets and a steady pace.
- Proposals: part of defence budgets could protect energy infrastructure such as subsea cables; offshore wind should count as national and European sovereignty; Europe could commit to 10 GW of new offshore wind each year.
- Clients now want partners who optimise a project from design to installation, with flexibility and a willingness to take certain risks "at acceptable prices".
- Contracts moved away from full EPCI towards split T&I packages; there is now renewed interest in integrated approaches, with more carefully tailored liability.
- Jan De Nul's edge is versatility: dredging plus offshore installation, covering seabed preparation, foundations, turbines, inter-array and export cables, and cable protection (rock, trenchers, dredged trenches).

### [Why we are investing heavily in subsea energy cables (interview with Wouter Vermeersch)](https://www.jandenul.com/news/why-we-are-investing-heavily-subsea-energy-cables)

Executive talk · Wouter Vermeersch, Director Subsea Cables Offshore Energy · 2026-03-09

- Wouter Vermeersch, Director Subsea Cables Offshore Energy at Jan De Nul, interviewed on the company site (9 March 2026) on why the group is investing heavily in subsea energy cables.
- Fleet: four new vessels and one conversion. Fleeming Jenkin, "the world's largest cable installation vessel", enters service in the second half of 2026, then its twin William Thomson; also a new rock installation vessel and two trenching support vessels (one new, one converted).
- Investing although the US has put offshore wind on hold: "The offshore wind energy train can no longer be stopped", and geopolitics gives it extra momentum.
- Market signals: at the North Sea summit in Hamburg, nine countries announced EUR 1 trillion of investment with companies, with 15 GW a year of new offshore wind and 300 GW by 2050; the UK auctioned about 9 GW of new capacity.
- The driver has shifted from climate targets to energy security, so interconnectors and hybrid offshore projects are needed. Subsea cables also electrify oil and gas infrastructure.
- Growing focus on cable protection and repair against the elements and deliberate damage ("just think of Russia's shadow fleet").
- Lower impact: ULEv ships, a new 150-tonne Sunfish amphibious cable burier, and a portfolio approach on TenneT's 2GW programme (four cable projects, 2,000 km of cable) that cuts cost and impact.

## Questions about Jan De Nul Group

### What does Jan De Nul Group do?

It is a marine and construction contractor that installs offshore energy infrastructure, dredges ports and waterways, builds civil infrastructure and remediates polluted sites.

### What is Jan De Nul Group's revenue?

Net turnover was EUR 4,236 million in 2025, with EBITDA of EUR 812 million and net profit of EUR 458 million.

### How many employees does Jan De Nul Group have?

The workforce was 8,848 people on 31 December 2025, of whom 5,414 employees and 3,434 non-employee workers.

### Who owns Jan De Nul Group?

It is privately held, the trade name of Sofidra S.A. in Luxembourg, and reinvests all its profits.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_