# KGHM Polska Miedź S.A. account plan

> KGHM Polska Miedź is a Polish copper and silver miner and smelter with PLN 36 366 mn of 2025 revenue and over 35 thousand employees on four continents.

## At a glance

KGHM Polska Miedź S.A., headquartered in Lubin in Lower Silesia, Poland, is one of the ten largest producers of mined copper worldwide and the second largest producer of silver. It runs the full chain from exploration and underground mining of Europe's largest copper ore deposit to smelting, refining and wire rod, and also operates the Robinson mine in Nevada and 55% of Sierra Gorda in Chile. In 2025 group revenues from contracts with customers were PLN 36 366 mn (+3.0%), adjusted EBITDA PLN 10 276 mn and profit PLN 3 688 mn, with payable copper production of 710.0 kt and silver of 1 347 t. The group has over 35 thousand employees in more than 60 companies; it is listed and the State Treasury holds 31.79% of the shares.

## Business units

- **KGHM Polska Miedź S.A. (parent company, Poland)** (about 83% of 2025 group revenue (PLN 30 358 mn external)): Three underground mines (Lubin, Polkowice-Sieroszowice, Rudna), concentrators, the Głogów and Legnica smelters and refineries and the Cedynia Wire Rod Plant. In 2025 it produced 570.9 kt of electrolytic copper and 1 323 t of metallic silver; in 9M 2026 output rose to 440.9 kt of copper (+4.7%) and revenue to PLN 32 562 mn (+48.1%).
- **KGHM INTERNATIONAL LTD.** (about 9% of 2025 group revenue (PLN 3 421 mn external)): Runs the Robinson open-pit mine in Nevada and the Carlota mine in Arizona, the Victoria project in Sudbury, Canada, and DMC Mining Services. Payable copper fell to 52.2 kt in 2025 after the Sudbury Basin sale, and H1 2026 output fell 33.9% to 19.3 kt as Robinson mined the lower-grade Liberty pit.
- **Sierra Gorda S.C.M. (Chile, 55%)**: Open-pit copper and molybdenum mine in the Antofagasta region, held 55% with South32 and equity-accounted, so its revenue is not consolidated. It posted record 2025 adjusted EBITDA of USD 1 507 mn at 100%, a 68% EBITDA margin in 9M 2026, and a fourth grinding line was approved in 2026.
- **Other segments** (about 7% of 2025 group revenue (PLN 2 569 mn external)): Polish companies supporting the core business, including KGHM Metraco (copper scrap supply), PeBeKa (mining contractor), KGHM ZANAM (mining machinery), Energetyka, NITROERG (explosives) and POL-MIEDŹ TRANS (rail freight). Most revenue is internal; adjusted EBITDA was PLN 392 mn in 2025.

## Strategic priorities

- **Strategy of the KGHM Group 2055+**: Approved on 3 July 2026, it targets average adjusted EBITDA of PLN 12 billion and payable copper above 730 kt a year in 2026-2030, with more than PLN 32 billion of capex (about PLN 6.5 billion a year, 80% in Poland).
- **Securing the Polish resource base**: The Deposit Access Program in Deep Głogów continues, with the GG-1 shaft at 1 348 m to be handed to crews in September 2029 and work on the Retków, GG-2 Odra and Gaworzyce shafts. Retków-Grodziszcze received EU strategic project status on 9 October 2026.
- **Recycling and value-chain extension**: The Legnica smelter is being converted into an integrated recycling plant, and the 2030 target for copper scrap recycling is about 350 kt (173 kt in 2025). Products more processed than cathodes should reach about 60% of electrolytic copper sales by end-2035.
- **Cost optimisation**: The Cost Optimisation Program targets over PLN 1 billion of permanent EBITDA improvement by end-2028 versus 2024; about PLN 300 million had been achieved by mid-2026.
- **Own energy and decarbonisation**: Targets are own generation capacity of at least 220 MW by 2030 (174 MW in 2025) and Scope 2 CO2 down 30% by 2030, supported by a PLN 209 mn BGK loan for 94 MW of photovoltaic installations.
- **Selective international growth**: KGHM signed exploration and partnership agreements in 2026 with South32, Freeport-McMoRan, BHP and Moroccan partners ONHYM and Managem, and management said it is acquiring an asset on an exclusive basis.

## Latest results

For the first nine months of 2026 group revenues were PLN 36 746 mn against PLN 25 871 mn a year earlier, adjusted EBITDA PLN 13 194 mn (a 32% margin) and profit PLN 7 516 mn against PLN 1 013 mn. Q3 2026 alone brought revenues of PLN 12 035 mn and profit of PLN 1 937 mn. Higher metal prices drove the jump: in H1 2026 average LME copper was 13 083 USD/t (+38.7%). The parent's 9M C1 cost was 2.97 USD/lb but 4.04 USD/lb in Q3, and international payable copper of 92.4 kt was below budget. KGHM publishes no earnings forecast for 2026.

## Investments and deals

- **Sierra Gorda fourth grinding line**: Approved with South32 for about USD 725 mn of capex from 1 July 2026, adding more than 20% processing capacity, with full output in the second half of 2030.
- **EU strategic projects in Poland**: The Retków-Grodziszcze deposit and the Legnica smelter's conversion into a recycling plant together exceed PLN 9.5 billion and gained EU strategic project status on 9 October 2026.
- **Parent capex and Głogów II overhaul**: The 2026 Budget sets parent capex at PLN 4 100 mn (+15%). The Głogów II smelter overhaul cost around PLN 670 million and was completed ahead of schedule.
- **Refinancing**: In December 2025 KGHM signed a USD 1 500 mn revolving facility maturing in 2030 and issued PLN 1 600 mn of 7-year series D bonds.
- **Disposal of Sudbury Basin mines**: The Sudbury Basin mines in Canada were sold to Magna Mining on 28 February 2025.

## Challenges and risks

- **Minerals extraction tax**: The tax charge at the parent rose 21.4% to PLN 4 693 mn in 2025, and in 9M 2026 it was PLN 3 152 mn higher; a cut to the tax coefficients for 2026-2028 took effect on 1 January 2026.
- **Deeper and hotter mining**: The risk model flags deeper and hotter mining conditions in Poland, seismic tremors, gas and water hazards, and tailings storage.
- **Energy intensity and costs**: KGHM is one of the most energy-intensive companies in Poland and consumes 2.5 terawatt-hours; rising energy and CO2 costs are a stated risk.
- **Robinson underperformance**: Robinson's output fell on clay-rich, lower-grade Liberty ore and equipment breakdowns; higher grades come with the Veteran pit from 2028.
- **Price, currency and geopolitics**: Copper and silver prices, USD/PLN, US/China/EU tariffs and slowdowns in China and Germany are named as factors for the coming quarters.

## What leadership says

> "we want to be a dividend company" — Remigiusz Paszkiewicz, President of the Management Board, H1 2026 results conference, 20 August 2026

> "a good year for the entire KGHM Group" — Remigiusz Paszkiewicz, President of the Management Board, Q4 and full-year 2025 results conference, 26 March 2026

> "we are also in the process of acquiring an asset on an exclusive basis" — Piotr Krzyżewski, Vice President Finance, H1 2026 results conference, 20 August 2026

> "Every cubic meter of air equals a tonne of production." — Zbigniew Bryja, Vice President Development, Q4 and full-year 2025 results conference, 26 March 2026


## Where a supplier can help

- **Underground heat and ventilation**: Tied to the Deposit Access Program and deeper, hotter mining: suppliers of cooling, ventilation, robots and battery machines can support shaft development and crew safety ahead of GG-1 in 2029.
- **Recycling and scrap processing**: Tied to the Legnica recycling conversion and the about 350 kt scrap target: suppliers of scrap sorting, processing and smelting technology fit a project with EU strategic status.
- **Energy and renewables**: Tied to the 220 MW own-generation target and energy-cost risk: photovoltaic, wind, storage and energy-efficiency suppliers address a company that consumes 2.5 terawatt-hours.
- **Cost and procurement efficiency**: Tied to the Cost Optimisation Program's PLN 1 billion target: data, AI and process-improvement offers that cut operating costs, in line with KGHM's Data&AI and local-content procurement programmes.
- **Downstream processing equipment**: Tied to value-chain extension: wire rod and casting line suppliers fit the planned replacement of Cedynia's Contirod and the Conform/Upcast lines under consideration.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [The Management Board's Report on the activities of KGHM Polska Miedź S.A. and of the KGHM Polska Miedź S.A. Group in 2025](https://kghm.com/sites/default/files/2026-03/MBs%20report%20on%20activities%20in%202025.pdf)

Annual report · 2026-03-25

- KGHM Polska Miedź S.A. Group is one of the ten largest producers of mined copper worldwide and the second largest producer of silver, with over 35 thousand employees in more than 60 companies on four continents; the State Treasury holds 31.79% of the shares.
- 2025 consolidated revenues from contracts with customers were PLN 36 366 mn (+3.0%), adjusted EBITDA PLN 10 276 mn (+21.5%) and profit for the period PLN 3 688 mn (+28.5%); net debt/adjusted EBITDA fell to 0.76.
- Payable copper production was 710.0 kt (-2.7%), of which KGHM Polska Miedź S.A. 570.9 kt, KGHM INTERNATIONAL LTD. 52.2 kt and Sierra Gorda S.C.M. (55%) 86.8 kt; silver production 1 347 t. Group C1 cost fell to 2.58 USD/lb.
- Prices drove the year: average LME copper 9 945 USD/t (+8.7%), silver 40.03 USD/oz t (+41.6%), gold 3 436 USD/oz t (+43.9%), while the USD/PLN rate fell 5.5% to 3.76.
- Sierra Gorda (Chile, 55% with South32) posted record adjusted EBITDA of USD 1 507 mn and repaid USD 600 mn of owner loans (USD 330 mn to the KGHM Group); the Sudbury Basin mines in Canada were sold to Magna Mining on 28 February 2025.
- Group cash expenditures on property, plant and equipment and intangibles were PLN 5 519 mn; the Budget for 2026 assumes +15% capex at the parent and copper production +21.3 kt (+3%).
- Financing was refinanced: a USD 1 500 mn five-year revolving syndicated facility (December 2025) and PLN 1.6 bn of 7-year series D bonds that refinanced the series B bonds.
- A cut to the minerals extraction tax coefficients for 2026-2028 took effect on 1 January 2026; the tax charge at the parent rose 21.4% to PLN 4 693 mn in 2025.
- Governance turnover: President Andrzej Szydło was dismissed on 30 January 2026 and Remigiusz Paszkiewicz became President of the Management Board on 24 February 2026.

### [The Management Board's Report on the activities of the Group in the first half of 2026](https://kghm.com/sites/default/files/2026-08/MB%20report%20on%20activities%20of%20the%20KGHM%20Group%20PSr%202026.pdf)

Interim report · 2026-08-19

- H1 2026 group revenues rose 40.8% to PLN 24 711 mn, adjusted EBITDA 89.1% to PLN 9 198 mn and profit to PLN 5 579 mn (from PLN 580 mn), on average LME copper of 13 083 USD/t (+38.7%) and silver of 78.83 USD/troz.
- The Supervisory Board approved the "Strategy of the KGHM Group 2055+" on 3 July 2026: average adjusted EBITDA of PLN 12 billion and payable copper above 730 kt a year in 2026-2030, with more than PLN 32 billion of capex over the period.
- The parent produced 291.5 kt of electrolytic copper (+7.0%) and 696.7 t of silver (+7.8%); its C1 cost fell 22.5% to 2.44 USD/lb on by-product credits.
- KGHM INTERNATIONAL payable copper fell 33.9% to 19.3 kt (lower-grade Liberty pit at Robinson); Sierra Gorda (55%) produced 40.2 kt (-5.3%) after heavy rainfall.
- With South32, KGHM approved a fourth grinding line at Sierra Gorda: about USD 725 mn of capex, more than 20% more processing capacity, full output in the second half of 2030.
- The Cost Optimisation Program targets over PLN 1 billion of permanent EBITDA improvement by end-2028 versus 2024; about PLN 300 million had been achieved by mid-2026.
- Net debt fell to PLN 4 691 mn; a PLN 300 mn dividend for 2025 was approved on 9 June 2026.
- The NKT Group contract was extended to December 2036, worth an estimated PLN 22.77-29.28 billion.

### [Consolidated quarterly report QSr 3/2026 (third quarter of 2026)](https://kghm.com/sites/default/files/2026-11/Consolidated%20quarterly%20report%20KGHM%20Group%20QSr_3_2026.pdf)

Interim report · 2026-11-18

- 9M 2026 group revenues were PLN 36 746 mn (versus PLN 25 871 mn), adjusted EBITDA PLN 13 194 mn (32% margin) and profit PLN 7 516 mn (versus PLN 1 013 mn); EPS was PLN 37.58.
- Q3 2026 alone: revenues PLN 12 035 mn (versus PLN 8 315 mn), profit on sales PLN 2 158 mn and profit PLN 1 937 mn (versus PLN 433 mn).
- On 9 October 2026 the European Commission granted EU strategic project status under the Critical Raw Materials Act to the Retków-Grodziszcze deposit and to the Legnica smelter's conversion into a recycling plant; the two investments exceed PLN 9.5 billion.
- The parent's 9M electrolytic copper output was 440.9 kt (+4.7%) and silver 1 048.8 t; 145 kt of copper scrap was processed, the highest level in its history. Its 9M C1 cost was 2.97 USD/lb, but 4.04 USD/lb in Q3.
- International payable copper was 92.4 kt in 9M (Sierra Gorda 63.1 kt at 55%, Robinson 27.0 kt), below budget; Sierra Gorda's EBITDA margin was 68%.
- New partnerships cover new copper projects: an MoU with South32, a letter of intent with BHP World Exploration, a Freeport-McMoRan exploration agreement in Chile and a memorandum with Moroccan partners.
- A PLN 300 mn dividend (PLN 1.50 per share) for 2025 was paid on 9 July 2026; the State Treasury still holds 31.79%.
- The UK (11.0%), Switzerland (5.6%) and the US (8.4%) gained share of 9M revenue while Poland fell to 23.6% and China to 4.1%.

### [Presentation of financial results of the KGHM Group for H1 2026 (results conference transcript)](https://kghm.com/sites/default/files/KGHM_transcript_H1_2026.pdf)

Executive talk · Remigiusz Paszkiewicz, President of the Management Board (with Piotr Krzyżewski, Vice President Finance; Anna Sobieraj-Kozakiewicz, Vice President International Assets; Zbigniew Bryja, Vice President Development; Mirosław Laskowski, Vice President Production) · 2026-08-20

- President Remigiusz Paszkiewicz reported revenue growth of over 40% and nearly a 90% increase in EBITDA in H1 2026, with lower debt; he repeated that KGHM wants "to be a dividend company".
- KGHM and South32 decided on 30 June to finance Sierra Gorda's fourth line: USD 725 mn of capex, metal production up 20%, full operation in H2 2030. It shortens the life of mine by three years to 2045, which management expects new drilling to offset (Catabela Northeast, 42 core holes so far).
- CFO Piotr Krzyżewski said the cost programme has delivered PLN 300 million of its PLN 1 billion savings target for 2028 (versus 2024); after H1, 52% of products sold are wire rod rather than cathodes.
- KGHM is "in the process of acquiring an asset on an exclusive basis" and may present it at the next results conference. It is looking at South America, North America and Africa (Morocco), and at lithium and titanium in Ukraine.
- Robinson's output fell 34% on clay-rich, lower-grade Liberty ore and equipment breakdowns; a recovery plan includes AI-based ore blending, and the Veteran pit follows in 2028.
- The Głogów II smelter overhaul (around PLN 670 million, now every 5 years instead of 3) was advanced by 9 days; GG-1 shaft crews start descending in September 2029.
- The CFO sees silver around USD 75 plus or minus 15% and believes the US copper stockpile "will never be released".

### [Presentation of financial results of the KGHM Group for Q4 and 2025 (results conference transcript)](https://kghm.com/sites/default/files/KGHM_transcript_4Q_2025.pdf)

Executive talk · Remigiusz Paszkiewicz, President of the Management Board (with Piotr Krzyżewski, Vice President Finance; Anna Sobieraj-Kozakiewicz, Vice President International Assets; Zbigniew Bryja, Vice President Development; Mirosław Laskowski, Vice President Production) · 2026-03-26

- New President Remigiusz Paszkiewicz called 2025 "a good year for the entire KGHM Group". He said mine-flood risk was "practically minimized to zero" by water projects completed in 2025, and that international assets reached financial independence for the first time.
- International assets generated 48% of group adjusted EBITDA in 2025 and contributed USD 379.7 million to the parent (Sierra Gorda USD 331.5 million); Sierra Gorda has repaid over USD 1 billion since 2021.
- The board will return to the dividend policy (it "will certainly not exceed 30% of net profit"); the tax cut freed funds that go to capex.
- Paszkiewicz's priorities: production efficiency and procurement, cheaper energy (KGHM is the single largest consumer of energy and gas in Poland), group governance and local content, sales diversification, and larger overseas resources such as Morocco.
- CFO Piotr Krzyżewski: EBITDA doubled in two years; controllable costs rose about 4%; C1 excluding tax fell 17%. Copper is hedged around 20% and silver 32%; gas and electricity are about 50% hedged for 2026.
- The 2025 capex plan was PLN 3,800 million, with 3,014 million in mining. GG-1 will be handed to crews in September 2029, and a new mine beyond the Oder ("KGHM 2.0") will start fieldwork in at least 10 years.
- Sierra Gorda's fourth line (about USD 700 million, roughly 20% more production) was to be decided by mid-2026. KGHM is exploring a role in new copper smelting capacity abroad, including the United States.

## Questions about KGHM Polska Miedź S.A.

### What does KGHM Polska Miedź do?

KGHM mines copper ore in south-western Poland and smelts and refines it into copper cathodes, wire rod, silver, gold and by-products such as rhenium and sulphuric acid. It also operates mines in the USA and, with South32, in Chile.

### What is KGHM's revenue?

Group revenues from contracts with customers were PLN 36 366 mn in 2025. For the first nine months of 2026 they reached PLN 36 746 mn.

### How many people work at KGHM?

The group has over 35 thousand employees in more than 60 companies on four continents; average group employment in H1 2026 was 34 543, excluding Sierra Gorda.

### What is KGHM's strategy?

The Strategy of the KGHM Group 2055+, approved on 3 July 2026, aims for payable copper above 730 kt a year and adjusted EBITDA of PLN 12 billion a year in 2026-2030, with more than PLN 32 billion of capex.

### Who leads KGHM?

Remigiusz Paszkiewicz has been President of the Management Board since 24 February 2026. The State Treasury is the largest shareholder with 31.79%.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_