# NextEra Energy, Inc. account plan

> NextEra Energy is a North American power and energy infrastructure company with about 80 GW of capacity and $27,412 million of 2025 revenues.

## At a glance

NextEra Energy (NEE) owns Florida Power & Light (FPL), the largest electric utility in Florida and the U.S., and NextEra Energy Resources (NEER), which develops, builds and operates contracted wind, solar, battery storage, nuclear and gas generation plus regulated transmission across the U.S. and Canada. At December 31, 2025 it had approximately 80 gigawatts of net generation and storage capacity and approximately 17,400 employees. FY2025 total consolidated revenues were $27,412 million and net income attributable to NEE was $6,835 million ($3.30 per share). In May 2026 it agreed to acquire Dominion Energy, with closing targeted for the second half of 2027.

## Business units

- **Florida Power & Light (FPL)** (about 67% of 2025 revenues ($18,262 million)): Rate-regulated utility serving approximately 12 million people through more than 6 million customer accounts in Florida, with about 9,400 employees. Its 2025 rate agreement adds $945 million of annualized retail base revenues from January 2026 and $705 million from January 2027, with a large-load tariff for loads of 50 MW or greater. Led by CEO Armando Pimentel, Jr. and President Scott Bores.
- **NextEra Energy Resources (NEER)** (about 32% of 2025 revenues ($8,760 million)): Owns approximately 37,505 MW of net generating capacity in 44 U.S. states and 4 Canadian provinces, about 95% under long-term contracts, plus regulated transmission, gas pipelines and gas and power marketing. In 2025 it added approximately 1,604 MW of wind, 2,859 MW of solar and 1,799 MW of battery storage. Led by Brian Bolster.

## Strategic priorities

- **Serve large loads and data centers**: FPL raised its large-load expectation from 6 GW to 8 GW by 2032, and NEER has 30 potential data-center hubs, expected to reach 40 by year-end, with a base case of 15 GW of new generation for large load by 2035.
- **Grow the renewables and storage backlog**: NEER added 3.7 GW to its renewables and storage backlog in Q3 2026, reaching nearly 36.7 GW; its storage pipeline exceeds 110 GW.
- **Close the Dominion Energy combination**: Agreed on May 15, 2026 at 0.8138 NEE shares per Dominion share plus $360 million in cash, with more than $2.25 billion of proposed bill credits; closing expected in the second half of 2027.
- **Expand transmission**: Regulated and invested capital plus secured capex in electric and gas transmission rose about 25% to approximately $12.7 billion since December 2025.
- **Adjusted EPS growth of 8%+ a year**: Adjusted EPS growth of 8%+ a year through 2032 off the 2025 base of $3.71, which management says would be 9%+ combined with Dominion.

## Latest results

In Q3 2026, net income attributable to NEE was $4,775 million ($2.28 per share) versus $2,438 million a year earlier, lifted by favorable non-qualifying hedge activity; nine-month net income was $10,102 million. Adjusted EPS rose 9.7% year on year in Q3. FPL earned $1,620 million (from $1,463 million) on average rate base growth of approximately $6.8 billion, and NEER $1,491 million (from $1,275 million). The 2026 adjusted EPS guidance of $3.92-$4.02 is unchanged, targeting the high end.

## Investments and deals

- **2026-2030 capex plan**: Estimated capex of $58,630 million at FPL and $35,555 million of approved projects at NEER for 2026-2030; nine-month 2026 capex reached $27,554 million.
- **Dominion Energy acquisition**: All-stock plus $360 million cash deal signed May 15, 2026, with an enhanced Virginia package including a $5 billion supplier program.
- **Gas acquisitions**: Symmetry Energy Solutions (January 2026, about 5,500 commercial and industrial gas customers in 34 states) and Caliber Resource Partners (June 30, 2026, base price $1.3 billion).
- **Duane Arnold nuclear restart**: Restart of the Iowa plant no later than Q1 2029, now 100% owned, backed by a DOE-guaranteed loan of up to $1.9 billion and a 25-year PPA.

## Challenges and risks

- **Clean-energy tax credit changes**: The One Big Beautiful Bill Act ends credits for wind or solar placed in service after 2030; NEE says its pipeline through 2030 will qualify.
- **Hurricanes and storm costs**: Hurricane Isaias (October 2026) is expected to cost approximately $450-$500 million in recoverable restoration costs against a storm reserve of approximately $119 million.
- **Regulation and permitting**: The 2025 rate agreement is under appeal before the Florida Supreme Court, and risks include permitting, interconnection and the federal pause on wind leasing and approvals.
- **Tariffs and supply chain**: Tariffs and duties on clean-energy equipment are a named risk; NEER had approximately $8.7 billion of equipment and construction commitments.

## What leadership says

> "this is a merger of addition, not subtraction" — John Ketchum, Chairman, President and CEO, Q3 2026 earnings call, October 21, 2026, on the Dominion combination

> "We need more linear infrastructure in this country, which requires permitting reform." — John Ketchum, Chairman, President and CEO, Q3 2026 earnings call, October 21, 2026

> "we were never the low-cost bidder in the market" — Brian Bolster, President and CEO of NextEra Energy Resources, Q3 2026 earnings call, October 21, 2026, on rising costs

> "hyperscalers know exactly how we plan to serve them in Florida." — Scott Bores, President and CEO of FPL, Q3 2026 earnings call, October 21, 2026, on the large-load tariff


## Where a supplier can help

- **Equipment and construction for the capex plan**: The 2026-2030 capex plan and growing renewables, storage and transmission backlog need batteries, transformers, EPC capacity and construction services.
- **Large-load and data-center hub delivery**: The data-center hubs and FPL's large-load expectation create demand for gas generation, storage, grid and site-development partners.
- **Dominion integration and Virginia suppliers**: The Dominion combination, with its Virginia supplier program, opens integration work and supplier opportunities in Virginia.
- **Storm resilience**: Hurricane restoration costs and FPL's storm exposure favor grid hardening, smart-grid and restoration service providers.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [NextEra Energy, Inc. and Florida Power & Light Company Form 10-K for fiscal year 2025](https://www.sec.gov/Archives/edgar/data/753308/000075330826000015/nee-20251231.htm)

Annual report · 2026-02-13

- NextEra Energy (NEE) is one of the largest electric power and energy infrastructure companies in North America, with approximately 80 gigawatts of net generation and storage capacity and approximately 17,400 employees at December 31, 2025; it reports two segments, FPL and NEER.
- FY2025 net income attributable to NEE was $6,835 million ($3.30 per share), against $6,946 million ($3.37) in 2024; FPL earned $5,012 million and NEER $2,975 million, while Corporate and Other lost $1,152 million, mainly on unfavorable non-qualifying hedge activity on interest rate derivatives.
- Total consolidated revenues were $27,412 million: FPL $18,262 million and NEER $8,760 million.
- FPL, the largest electric utility in Florida and the U.S., serves more than 6 million customer accounts (approximately 12 million people); its 2025 rate agreement adds $945 million of annualized retail base revenues from January 2026 and $705 million from January 2027, with an authorized ROE of 10.95% and a large-load tariff for new loads of 50 MW or greater.
- NEER owns approximately 37,505 MW of net generating capacity in 44 U.S. states and 4 Canadian provinces, about 95% under long-term contracts; in 2025 it added approximately 1,604 MW of wind, 2,859 MW of solar and 1,799 MW of battery storage.
- 2025 capital expenditures and investments totaled $24,606 million; approved capex for 2026-2030 is $58,630 million at FPL and $35,555 million at NEER.
- NEER is restarting the Duane Arnold nuclear plant in Iowa (estimated commercial operation in 2029, 25-year PPA) and bought Symmetry Energy Solutions, a commercial and industrial natural gas business, in January 2026.
- Main risks named: regulation and cost recovery, changes to clean-energy tax credits under the One Big Beautiful Bill Act, tariffs and supply chain, permitting (including the federal pause on wind leasing and approvals), weather and hurricanes, nuclear operations, credit ratings and capital-market access.

### [NextEra Energy Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/753308/000075330826000081/nee-20260930.htm)

Interim report · 2026-10-21

- Q3 2026 net income attributable to NEE was $4,775 million ($2.28 per share) versus $2,438 million ($1.18) a year earlier; nine-month net income was $10,102 million ($4.82) versus $5,300 million ($2.57), lifted by favorable non-qualifying hedge activity ($2,246 million in Q3).
- FPL Q3 net income rose to $1,620 million from $1,463 million on approximately $6.8 billion of average rate base growth; new base rates under the 2025 rate agreement added $281 million of retail base revenues in the quarter; earned regulatory ROE approximately 11.80%.
- NEER Q3 results rose to $1,491 million from $1,275 million, with new investments (+$186 million, including fees from management, construction and operating services agreements, MCOAs) and higher wind resource on existing assets (+$108 million); customer supply fell $75 million.
- On May 15, 2026 NEE agreed to acquire Dominion Energy: 0.8138 NEE shares per Dominion share plus a pro rata share of $360 million in cash; more than $2.25 billion of proposed bill credits; shareholders approved in September 2026; closing targeted for the second half of 2027.
- Termination fees: NEE would pay $4.8 billion or $6.5 billion in specified circumstances; Dominion approximately $2.2 billion.
- 2026 acquisitions: Symmetry Energy Solutions (January; ~5,500 commercial and industrial gas customers in 34 states), Caliber Resource Partners (June 30; non-operated interests in more than 7,500 producing wells, base price $1.3 billion), and the remaining stake in Duane Arnold (July), backed by a DOE-guaranteed loan of up to $1.9 billion.
- Nine-month capex reached $27,554 million (versus $19,328 million), including $10,373 million of NEER solar; net available liquidity was approximately $19.3 billion.
- Hurricane Isaias (October 2026) is expected to cost approximately $450-$500 million in recoverable storm restoration costs, against a storm reserve of approximately $119 million.

### [NextEra Energy Q3 2026 earnings call transcript](https://fortune.com/company/nextera-energy/earnings/q3-2026/)

Executive talk · John Ketchum, Chairman, President and CEO · 2026-10-21

- Q3 2026 adjusted EPS rose 9.7% year on year (9.5% over nine months); 2026 guidance of $3.92-$4.02 is unchanged and NextEra is targeting the high end; long-term adjusted EPS growth of 8%+ a year through 2032 off the 2025 base of $3.71, which Ketchum says would be 9%+ combined with Dominion.
- Energy Resources added 3.7 GW of renewables and storage (2.4 GW of batteries) to a backlog of nearly 36.7 GW, its fourth consecutive quarter above 3.5 GW; about 15 GW added in 12 months.
- Large load: more than 20 GW of projects advanced, over 18 GW gas-fired; three federal hubs in Texas and Pennsylvania (about 16.5 GW, $5.7 billion of initial funding) where Energy Resources earns fees without investing capital, about 50% of the EPS of owning them.
- FPL raised its large-load expectation from 6 GW to 8 GW by 2032 and still expects to announce a large-load deal by year-end; the typical residential bill is approximately 37% below the national average.
- Transmission: regulated and invested capital plus secured capex in electric and gas transmission up about 25% to approximately $12.7 billion since December 2025; a $1.2 billion, 97-mile Florida gas pipeline JV with Chesapeake Utilities.
- Nuclear: Duane Arnold restart no later than Q1 2029 with a DOE loan of up to $1.9 billion; a 20-year PPA for about 1 GW of Point Beach; 6 GW of SMR co-location opportunities, only with risk-sharing that caps exposure.
- Dominion combination: enhanced Virginia package (four years of bill credits, almost $2 billion in Virginia, a $5 billion supplier program, 1,000 new Virginia jobs); Virginia and South Carolina orders expected January 2027; close expected in the second half of 2027.
- Funding: $12-$17 billion of equity needs through 2032 unchanged; more than $48 billion of forward interest rate hedges at about 4%.

### [NextEra Energy Q2 2026 earnings call transcript](https://fortune.com/company/nextera-energy/earnings/q2-2026/)

Executive talk · John Ketchum, Chairman, President and CEO · 2026-07-24

- Q2 2026 adjusted EPS was $1.15; first-half adjusted EPS rose 9.8%; 2026 guidance of $3.92-$4.02 held, targeting the high end.
- FPL added more than 90,000 customers year on year; it has roughly 21 GW of large-load interest, 12 GW in advanced discussions, and each GW under its tariff is roughly $2 billion of capex earning FPL's normal ROE.
- Energy Resources added 3.6 GW to its backlog (2 GW batteries), reaching approximately 35.1 GW; its storage pipeline exceeds 110 GW; adjusted earnings grew approximately 18%.
- NextEra Energy Transmission energized a 137-mile, 345 kV New Mexico line in 31 months and won a 43% share of a ~$1.6 billion MISO 765 kV project.
- Data-center hubs: 30 potential hubs (40 by year-end), a base case of 15 GW of new generation for large load by 2035 and an upside case of 30 GW or more; 9.5 GW of gas projects with the U.S. and Japanese governments still being finalized.
- Dominion merger filings made in July; NextEra offers $2.25 billion of shareholder-funded bill credits; the combined company would target ~11% annual regulatory capital growth and 9%+ adjusted EPS growth through 2032.
- The S-4 forecast shows Energy Resources adjusted EBITDA roughly $4 billion higher in 2032 than at the December 2025 investor conference, driven by better renewables and storage origination.
- Supply secured: solar panels and domestic battery supply through 2029, plus transformers through the end of the decade; Ketchum ruled out LNG.

## Questions about NextEra Energy, Inc.

### What does NextEra Energy do?

NextEra Energy owns FPL, the largest electric utility in Florida and the U.S., and NextEra Energy Resources, which develops and operates contracted wind, solar, storage, nuclear and gas generation and transmission in North America.

### What is NextEra Energy's revenue?

Total consolidated revenues were $27,412 million in FY2025, with net income attributable to NEE of $6,835 million.

### How many employees does NextEra Energy have?

Approximately 17,400 employees at December 31, 2025.

### Who leads NextEra Energy?

John W. Ketchum is Chairman, President and CEO; Michael H. Dunne is CFO; Brian W. Bolster leads NextEra Energy Resources and Armando Pimentel, Jr. is CEO of FPL.

### What is NextEra Energy's strategy?

It invests heavily in generation, storage and transmission, targets data centers and other large loads, is acquiring Dominion Energy, and aims for adjusted EPS growth of 8%+ a year through 2032.