# Pinnacle West Capital Corporation account plan

> Pinnacle West Capital owns Arizona Public Service, Arizona's largest electric utility, with about 1.5 million customers and FY2025 revenue of $5,340 million.

## At a glance

Pinnacle West Capital (NYSE: PNW) is a Phoenix-based electric utility holding company that derives essentially all of its revenue and earnings from Arizona Public Service (APS), Arizona's largest and longest-serving electric company, serving 11 of the state's 15 counties. APS generates, transmits and distributes electricity to about 1.5 million homes and businesses, with almost 6,300 MW of capacity anchored by the Palo Verde nuclear plant. In FY2025 operating revenues were $5,340 million and net income attributable to common shareholders $617 million (EPS $5.05). The group had 6,610 employees at year-end 2025 and consolidated assets of about $33.5 billion in 2026.

## Business units

- **Arizona Public Service (APS)** (essentially all of group revenue ($5,340 million in 2025)): The regulated electricity segment: generation, transmission and distribution for retail customers, with residential and non-residential revenue roughly 48% each. It owns or leases 6,257 MW, including a 29.1% interest in Palo Verde, six gas plants and Four Corners coal. Operations are led by Jacob Tetlow, EVP and COO of APS.
- **PNW Power**: Holds TransCanyon, a 50/50 transmission joint venture with BHE U.S. Transmission pursuing the 214-mile Cross-Tie line between Utah and Nevada, and minority stakes in two Tenaska wind farms. Immaterial to group results.
- **El Dorado**: An investment vehicle with commitments to venture funds (Energy Impact Partners, AZ-VC Fund I, Westly) and an equity stake in SAI Advanced Power Solutions, a maker of switchgear used by data centers.

## Strategic priorities

- **Serving large-load growth**: Retail sales growth is now forecast at 8.0% to 10.0% for 2026 and on average through 2030, with large manufacturing and data centers contributing 7.0% to 9.0% a year; committed demand stands at 5.8 GW against a 20-plus GW queue.
- **Growth pays for growth**: The 2026 Pledge for Responsible Energy Growth commits APS not to connect extra-large customers faster than the grid can support and to make them fund their costs; the first direct pricing contract, with TSMC Arizona (about 1.88 GW for 25 years), is meant to be replicated.
- **New generation and transmission**: The IRP filed October 30, 2026 sees annual energy needs more than doubling by 2041 and identifies nearly 15 GW of new resources and about 2.6 GW of new transmission; APS aims to own closer to 50-50 of incremental generation.
- **Rate case and formula rate**: The 2025 Rate Case seeks $691.6 million ($608.7 million net) with a 10.7% ROE and a formula rate to cut regulatory lag; a decision is expected in mid-December 2026, with the first formula filing in May 2027.
- **Reliability and affordability**: APS targets top quartile reliability and points to flat O&M; more than $33 million of bill credits and $5 million of hardship assistance were provided in November 2026.

## Latest results

In Q3 2026 operating revenues rose to $1,973 million (Q3 2025: $1,821 million) and net income attributable to common shareholders to $434.2 million, or $3.49 per diluted share (Q3 2025: $413.2 million, $3.39), on higher sales and usage, weather and customer growth, partly offset by depreciation and interest. For the nine months, revenues were $4,578 million and net income $646 million. Weather-normalized sales rose 9.5%, with commercial and industrial up 14.5%, and customers set an all-time peak demand of 9,166 MW on August 2. 2026 EPS guidance was raised to $5.05-$5.25 from $4.55-$4.75.

## Investments and deals

- **APS capital plan**: Capex of $2,600 million (2026), $2,650 million (2027) and $2,700 million (2028), with transmission rising from $550 million to $860 million; the plan excludes the Cholla conversion and DPC-related capex.
- **Gas generation and fuel supply**: Up to 2,000 MW of flexible gas generation, the Redhawk expansion for 2028, conversion of two Cholla units to gas (about 380 MW, target 2029, up to about $440 million) and a new third-party pipeline expected by late 2029.
- **Palo Verde licence renewal**: In March 2026 APS announced its intention to renew the licences of all three units, extending operations through the mid-2060s.
- **Financing**: $700 million of senior notes in Q3 2026, nearly $920 million priced under the ATM year to date, and a request to raise APS's long-term debt limit from $9.5 billion to $12 billion.
- **Wildfire and grid grants**: A Comprehensive Wildfire Mitigation Plan was approved on May 7, 2026, and DOE grant agreements of up to $70 million for fire mitigation and grid projects became effective September 30, 2026.

## Challenges and risks

- **Capacity shortage**: Large-load requests far exceed available generation and transmission capacity in the Southwest, and management says there is no excess generation in the service territory.
- **Regulatory lag**: Timely cost recovery depends on the ACC; ACC Staff recommended $506.5 million against APS's request, and the formula rate policy faces court challenges.
- **Credit metrics and financing needs**: Moody's FFO-to-debt was in the high 14s against a 14% downgrade threshold at the start of 2026, while capex and debt rise.
- **Wildfire, water and weather**: The 10-K lists wildfires, water supply and weather among key risks; weather can move annual net income by up to $30 million.

## What leadership says

> "Growth should pay for growth. It's that simple" — Ted Geisler, Chairman, President and Chief Executive Officer, Q3 2026 results press release, November 3, 2026

> "Simply put, TSMC pays its own way. Residential customers will not subsidize this growth." — Ted Geisler, Chairman, President and Chief Executive Officer, Q3 2026 earnings call, November 3, 2026

> "Arizona continues to grow at an extraordinary pace, and our responsibility is clear: deliver safe, reliable and affordable energy for the customers who count on us every day" — Ted Geisler, Chairman, President and Chief Executive Officer, Q3 2026 results press release, November 3, 2026

> "to earn within 50 basis points of our authorized return" — Andrew Cooper, SVP and Chief Financial Officer, Q3 2026 earnings call, November 3, 2026


## Where a supplier can help

- **Transmission and distribution build-out**: Transmission capex rising to $860 million in 2028 and about 2.6 GW of new transmission in the IRP create demand for equipment, EPC and grid technology suppliers.
- **Generation projects and turbines**: Nearly 15 GW of new resources, gas expansions and the Cholla conversion, with APS procuring turbine reservations and development sites, need equipment makers and project developers.
- **Large-customer contracting**: Replicating the TSMC direct pricing contract across the queue calls for load forecasting, contract management and credit-risk tools.
- **Cost and affordability tools**: Keeping O&M flat while serving record demand favours suppliers of automation, AI customer service and wildfire sensing that reduce cost per megawatt-hour.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Pinnacle West Capital Corporation and Arizona Public Service Company Form 10-K 2025](https://www.sec.gov/Archives/edgar/data/764622/000076462226000011/pnw-20251231.htm)

Annual report · 2026-02-25

- Pinnacle West Capital (NYSE: PNW) is a Phoenix-based investor-owned electric utility holding company with consolidated assets of approximately $30 billion; it derives essentially all revenue and earnings from Arizona Public Service (APS), Arizona's largest and longest-serving electric company (since 1886), serving approximately 1.4 million customers in 11 of Arizona's 15 counties.
- FY2025: operating revenues $5,340 million (2024: $5,125 million); net income attributable to common shareholders $617 million (2024: $609 million); APS net income $667 million. Weather cost $114 million of net margin versus the record-hot 2024 summer.
- Growth: retail customers +2.4% in 2025; weather-adjusted retail sales +5.0%. Guidance in the 10-K: sales +4.0% to 6.0% in 2026 and 5.0% to 7.0% a year through 2030, driven by data centers and large manufacturing (3.0% to 5.0% of 2026 growth).
- Assets: 6,257 MW of owned or leased generation, anchored by the Palo Verde nuclear plant (APS operator, 29.1% interest, 1,146 MW entitlement); six gas plants (3,722 MW); Four Corners coal (970 MW); Cholla coal retired April 2025. About 58% of 2025 supply came from clean resources; aspirational carbon-neutral goal by 2050.
- Capex plan for APS: $2,600 million (2026), $2,650 million (2027), $2,700 million (2028), with transmission rising from $550 million to $860 million and up to 2,000 MW of new flexible gas generation planned.
- 2025 Rate Case filed June 2025: net base rate increase of $579.5 million (13.99%), 10.70% ROE, 52.35% equity, $12.5 billion rate base, and a formula rate (FRAM) to cut regulatory lag; requested effective in the second half of 2026.
- Strategy: "growth pays for growth": a subscription model and long-term contracts so large-load customers (data centers, chip makers) fund their own infrastructure; joining SPP Markets+ (October 2027).
- Key risks: rate recovery and regulatory lag at the ACC, Palo Verde nuclear liabilities, wildfire, water supply, cybersecurity, credit ratings, and large-load demand forecasts.
- Leadership: Theodore N. Geisler (Chairman, CEO and President since 2025), Andrew D. Cooper (SVP and CFO), Jacob Tetlow (EVP and COO of APS), Adam C. Heflin (EVP and Chief Nuclear Officer); 6,610 employees at year-end 2025.

### [Pinnacle West / APS Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/764622/000076462226000050/pnw-20260930.htm)

Interim report · 2026-11-03

- Q3 2026 (three months to September 30, 2026): operating revenues $1,973 million (Q3 2025: $1,821 million); net income attributable to common shareholders $434 million (Q3 2025: $413 million); APS $453 million.
- Nine months 2026: operating revenues $4,578 million (2025: $4,212 million); net income attributable to common shareholders $646 million (2025: $601 million).
- Weather-adjusted retail sales +9.5% in the nine months (residential +4.2%, commercial and industrial +13.9%); retail customers +2.0%.
- Guidance raised in the 10-Q: retail sales growth of 8.0% to 10.0% for 2026 and on average through 2030, with large manufacturing and data centers contributing 7.0% to 9.0% a year through 2030.
- On October 16, 2026 APS signed its first direct pricing contract (DPC), with TSMC Arizona: service ramping to about 1.88 GW for an initial 25 years, with upfront payments and collateral; ACC approval pending.
- 2025 Rate Case: hearing concluded July 7, 2026; APS's rejoinder asks for $691.6 million ($608.7 million net) with a 10.7% ROE and a formula rate; ACC Staff recommended $506.5 million; APS expects resolution before year-end.
- New plans: conversion of two Cholla units to gas (about 380 MW, target 2029, up to about $440 million, outside the capex plan); intent to renew Palo Verde licences to the mid-2060s; new IRP filed October 30, 2026.
- APS capex plan unchanged at $2,600 million (2026), $2,650 million (2027) and $2,700 million (2028); APS asked to raise its long-term debt limit from $9.5 billion to $12 billion.

### [Pinnacle West Reports 2026 Third-Quarter Financial Results (press release, Exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/764622/000076462226000051/a8-kpnw093026exhibit991.htm)

Interim report · 2026-11-03

- Q3 2026 net income attributable to common shareholders $434.2 million, or $3.49 per diluted share (Q3 2025: $413.2 million, $3.39), up on customer sales and usage, weather and customer growth, partly offset by depreciation and interest.
- 2026 consolidated EPS guidance raised to $5.05-$5.25 per diluted share.
- Weather-normalized sales +9.5%: commercial and industrial +14.5%, residential +4.5%; customer growth 1.8% (residential 1.9%).
- All-time peak demand of 9,166 MW on August 2, above last year's 8,648 MW peak a dozen times; fourth consecutive year of record summer demand.
- Customers' annual electricity needs are projected to more than double by 2041, with peak demand more than 5,000 MW above today; the IRP has been filed with the ACC.
- CEO Ted Geisler: "Growth should pay for growth. It's that simple" The Pledge for Responsible Energy Growth commits APS to not connect extra-large customers faster than the grid can support.
- More than $33 million in bill credits (about $14 off a typical residential November bill) and $5 million of company-funded hardship assistance.
- About $33.5 billion of assets, almost 6,300 MW of capacity, approximately 6,600 employees, about 1.5 million customers.

### [Pinnacle West (PNW) Q3 2026 Earnings Call Transcript](https://www.fool.com/earnings/call-transcripts/2026/11/03/pinnacle-west-pnw-q3-2026-earnings-call-transcript/)

Executive talk · Ted Geisler, Chairman, President and Chief Executive Officer · 2026-11-03

- Q3 2026 EPS $3.49 (+$0.10 year on year); 2026 guidance raised to $5.05-$5.25 from $4.55-$4.75, driven mainly by higher-than-forecast sales growth (CFO Andrew Cooper).
- Weather-normalized sales +9.5% (C&I +14.5%, residential +4.5%), the second straight quarter above 9%; 2026 sales outlook raised to 8%-10%, and long-term growth through 2030 raised from 5%-7% to 8%-10% (large C&I 7%-9%).
- First direct pricing contract signed with TSMC: 25 years, about 1.88 GW at full build-out; "Simply put, TSMC pays its own way. Residential customers will not subsidize this growth." Geisler says the DPC "was designed to be replicated" across the 20 GW queue.
- IRP: by 2041 annual energy needs more than double to about 80,600 GWh and peak reaches 14.5 GW; nearly 15 GW of new resources and about 2.6 GW of new transmission; committed demand raised to 5.8 GW (+1.3 GW).
- About 4.5 GW of resources to be in service by 2028 plus about 2.8 GW of thermal (Redhawk expansion, Cholla conversion, Saguaro, Desert Sun); about 40% APS-owned, with a goal near 50-50.
- Rate case decision expected mid-December 2026; first formula-rate filing May 2027, with 2029 as the run-rate year for earning near the authorized return; long-term outlook update on the February call.
- Financing: $700 million of senior notes in Q3; about $235 million priced under the ATM in Q3, nearly $920 million year to date; equity ratio kept above 50%.
- Growth is more manufacturing than data centers (Amkor raising its Peoria investment to about $12 billion, Kimberly-Clark in Yuma); "there is no excess generation in our service territory".

### [Pinnacle West (PNW) Q4 2025 Earnings Call Transcript](https://www.fool.com/earnings/call-transcripts/2026/02/25/pinnacle-west-pnw-q4-2025-earnings-transcript/)

Executive talk · Ted Geisler, Chairman, President and Chief Executive Officer · 2026-02-25

- FY2025 EPS $5.05 (2024: $5.24), the decline "primarily weather-driven", a $0.71 drag; Q4 EPS $0.13 versus a $0.06 loss (CFO Andrew Cooper).
- 2025 weather-normalized sales +5% (residential +2%, C&I +7.5%); customer growth 2.4%; more than 34,000 new meters for the second year, the most in 20 years.
- 2026 guidance reaffirmed: EPS $4.55-$4.75; sales +4%-6% with extra-high-load-factor customers contributing 3%-5%; 5%-7% a year through 2030; rate base growth 7%-9% through 2028.
- Operations: new system peak of 8,648 MW; Palo Verde ran at 100% summer capacity factor and won a 2025 INPO Excellence Award; over 400 MW of APS-owned resources finished ahead of schedule.
- TSMC: second fab in full production in 2027, third under construction, fourth and advanced packaging in early development, 900 extra acres acquired.
- Large loads: 4.5 GW committed versus 20 GW uncommitted queue; first subscription-model offer made, aiming to file an agreement with the ACC in 2026.
- Regulation: the UNS Gas formula-rate decision is "generally constructive"; APS is pursuing its rate case through hearings and says settlement is "not something I would count on".
- Balance sheet: nearly $500 million of 2026 equity priced; credit facilities extended to 2031 with $550 million more capacity; holdco debt 17%; Moody's FFO/debt in the "high 14s" versus a 14% downgrade threshold.

## Questions about Pinnacle West Capital Corporation

### What does Pinnacle West Capital do?

It is a Phoenix-based utility holding company whose subsidiary APS generates, transmits and distributes electricity to about 1.5 million Arizona homes and businesses.

### What is Pinnacle West's revenue?

FY2025 operating revenues were $5,340 million with net income attributable to common shareholders of $617 million; nine-month 2026 revenues were $4,578 million.

### How many employees does Pinnacle West have?

6,610 employees at December 31, 2025, almost all at APS.

### Who leads Pinnacle West?

Ted Geisler is Chairman, President and CEO of Pinnacle West and APS; Andrew Cooper is SVP and CFO.

### What is Pinnacle West's strategy?

Serve fast-growing demand from manufacturers, data centers and households while making large customers pay for their own growth, backed by new generation, transmission and a formula rate.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_