# PORR Group account plan

> PORR is a Vienna-based construction group in civil engineering and building across seven home markets: EUR 6,818m 2025 output, about 21,000 staff.

## At a glance

PORR AG, headquartered in Vienna and listed since 1869 (in the ATX since 2025), is a full-service construction group covering civil engineering, building construction, environmental engineering and design & engineering, with its own quarries, gravel, asphalt and recycling. Its seven home markets (Austria, Germany, Switzerland, Poland, Czech Republic, Slovakia, Romania) generated 98.4% of output in 2025, and it runs a selective project business in tunnelling and railway construction. In 2025 production output was EUR 6,818m (+1.0%), revenue EUR 6,295.9m, EBIT EUR 196.7m (margin 3.1%) and profit EUR 136.7m, with a record order backlog of EUR 9,539m. It had 20,829 average staff. IGO Industries Group (Ortner family) and Strauss Group are the core shareholders, and Karl-Heinz Strauss has been CEO since 2010.

## Business units

- **AT / CH (Austria and Switzerland)** (EUR 3,014m 2025 output, about 44% of group output): Full-service business in Austria, focused on industrial, road and residential construction plus railway, pipeline, environmental and specialist civil engineering; Switzerland is civil engineering only. EBIT was EUR 120.3m (4.7% margin) in 2025, and the backlog rose 21.0% to EUR 3,361m by mid-2026 on railway and transport infrastructure. Led on the Executive Board by CEO Karl-Heinz Strauss.
- **DE (Germany)** (EUR 1,516m 2025 output, about 22% of group output): Building, industrial and structural engineering, transport infrastructure, specialist civil engineering, design-build and PORR Government Services, which now includes a defence unit. Output rose 10.7% in 2025 on industrial construction for clients such as Eli Lilly and BMW, and a EUR 270m Bundeswehr framework contract followed in 2026. COO Claude-Patrick Jeutter is responsible.
- **PL (Poland)** (EUR 984m 2025 output, about 14% of group output): The whole Polish business including Stump-Franki: roads, bridges, railways, power plants and buildings, plus the group-wide competence centre for data centres. EBIT rose to EUR 31.7m in 2025 on strong rail project results, and H1 2026 output grew 21.7%. COO Josef-Dieter Deix is responsible.
- **CEE (Czech Republic, Slovakia, Romania)** (EUR 678m 2025 output, about 10% of group output): Civil and building work in the Czech Republic, civil engineering in Slovakia and Romania, large infrastructure and asphalt production. Output fell 17.4% in 2025 while design-build projects were in planning, but the backlog rose 54.9% to EUR 1,375m and EBIT margin reached 4.0%; Romanian awards are waiting for a new government.
- **Infrastructure International** (EUR 555m 2025 output, about 8% of group output): International tunnelling in DACH and Eastern Europe, Slab Track International, and project markets in the UK (completing HS2), Norway and Qatar, the last two being exited. EBIT turned positive at EUR 3.4m in 2025 but was EUR -2.4m in H1 2026 on Qatar settlement costs.
- **Holding** (EUR 71m 2025 output, about 1% of group output): Shared Service Center, PORR Beteiligungen und Management (including a hospitals group operating health and rehabilitation facilities) and building construction in Switzerland, which is being wound up.

## Strategic priorities

- **"Intelligent Growth with Green and Lean"**: Selective growth on the seven home markets, aiming to be among the top 3 on each market and to reach an EBIT margin of 3.5% to 4.0% by 2030.
- **Infrastructure as the growth driver**: Around 60% of the business is infrastructure; civil engineering is 58.1% of the backlog, and more than EUR 4.5bn of Polish and CEE projects are in final tendering.
- **New growth fields**: PORR Healthcare, PORR Living modular affordable housing, industrial construction and data centres are named as growth areas for 2026, along with military infrastructure.
- **Digital, paperless construction sites**: Planning and costing are almost fully digital and site execution is being digitalised under Lean Construction; AI is used in planning, tenders and document review, and telematics track more than 60,000 devices and machines.
- **Decarbonisation and circular construction**: Sustainability Strategy 2030 with 18 targets and an SBTi commitment; Scope 1 & 2 emissions fell 22.5% in 2025, and PORR uses HVO100 fuel, tests electric and hydrogen equipment and uses AI to raise recycled content in concrete and asphalt.

## Latest results

In H1 2026, production output was flat at EUR 3,167m and revenue fell 1.1% to EUR 2,925.3m after a long winter with snow well into April cut building construction output by 2.6%, while civil engineering grew 7.2%. Earnings rose: EBITDA EUR 171.1m (+11.6%), EBIT EUR 56.3m (+15.6%, margin 1.92%) and profit EUR 36.4m. The order backlog reached EUR 9,839m (+4.4%), while order intake fell 14.4% to EUR 3,466m after a strong prior year. Net debt was EUR 460.6m on seasonal working capital and acquisitions. Guidance for 2026 is output and revenue growth of 2% to 4% and an EBIT margin of 3.2% to 3.3%.

## Investments and deals

- **PORR Healthcare and Knape Bahnbau**: Acquisition of VAMED Standortentwicklung und Engineering (about 150 employees), the basis of PORR Healthcare, and a majority of Knape Bahnbau for railway construction in Germany.
- **rhtb drywall group and UBM hybrid**: 51% of the rhtb drywall group acquired in 2026, plus EUR 56.4m of 9.0% UBM Development hybrid capital, which also gives a sales partner for PORR LIVING.
- **Equipment CAPEX**: CAPEX was EUR 252.9m in 2025, mainly replacement and new construction equipment, and EUR 172.1m in H1 2026 including a tunnel boring machine in Poland; around 4.5% of output is expected for 2026.
- **Portfolio exits**: Gradual withdrawal from Norway and Qatar, winding up building construction in Switzerland, and an expected sale of the PWW group.

## Challenges and risks

- **Skilled labour shortage**: The CFO says PORR could grow faster with more skilled workers; it tripled its headcount in Romania, and the CEO calls for targeted immigration and retraining.
- **Thin margins and project risk**: With an EBIT margin of 3.1% in 2025, project execution is controlled by a gate system for projects above EUR 20m and Executive Board involvement above EUR 100m; the Leverkusen Bridge dispute with Autobahn GmbH is still ongoing.
- **Material and energy prices**: Cost of materials is 65.8% of revenue; PORR hedged against material price increases linked to the Iran war and covers around 90% of gas needs 2028-2030 with commodity swaps.
- **Timing of public awards**: CEE order intake fell 65.9% in H1 2026 as Romanian contract awards wait for a government, and large design-build infrastructure projects lowered civil engineering output while in planning.
- **Geopolitics, cyber and climate**: The report names possible US tariffs, AI-driven cyber attacks and physical and transition climate risks.

## What leadership says

> "Infrastructure will remain the key growth driver in 2026." — Karl-Heinz Strauss, Chairman of the Executive Board and CEO, Annual and Sustainability Report 2025, 26 March 2026

> "We have no operations in Ukraine or Russia at present, for example, and this will remain the case for the foreseeable future." — Karl-Heinz Strauss, Chairman of the Executive Board and CEO, Annual and Sustainability Report 2025, 26 March 2026

> "secures good capacity utilisation for the next one and a half years" — Karl-Heinz Strauss, Chairman of the Executive Board and CEO, On the EUR 9.8bn backlog, Half-Year Report 2026, 27 August 2026

> "could grow even faster if there were more skilled workers" — Klemens Eiter, Executive Board Member and CFO, EY CFO Insight podcast, 18 February 2026 (translated from German)


## Where a supplier can help

- **Construction technology and AI on site**: The paperless-site priority and the next step of AI checking plans and records against what was built fit construction software, document AI and site-digitalisation vendors.
- **Procurement platforms and materials**: With materials at 65.8% of revenue and platforms being built to steer purchasing centrally and make sourcing more resilient, procurement software and regional materials suppliers are relevant.
- **Low-carbon equipment and materials**: Decarbonisation targets and tests of electric equipment and hydrogen excavators open room for suppliers of electric machinery, renewable fuels, green cement and recycling technology.
- **Workforce and robotics**: The skilled labour shortage makes recruitment, training and construction robotics for overhead drilling, surveying and dangerous work relevant.
- **Data centre and healthcare fit-out**: Data centres, run from the Polish competence centre, and PORR Healthcare as 2026 growth fields create demand for MEP, cleanroom and medical-building subcontractors.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [PORR Annual and Sustainability Report 2025](https://porr-group.com/fileadmin/s_porr-group/IR/Konzernberichte/2026/PORR_GB_NHB_2025_en_sec_1774473896.pdf)

Annual report · 2026-03-26

- PORR AG (Vienna, listed since 1869, in the ATX since 2025) is a full-service construction group: civil engineering, building construction, environmental engineering, design & engineering, with own quarries, gravel, asphalt and recycling; seven home markets (Austria, Germany, Switzerland, Poland, Czech Republic, Slovakia, Romania) generated 98.4% of output in 2025.
- FY2025 was "the most successful in PORR's 157-year history": production output EUR 6,818m (+1.0%), revenue EUR 6,295.9m (+1.7%), EBIT EUR 196.7m (+24.2%), EBIT margin 3.1% (2024: 2.6%), profit EUR 136.7m, EPS EUR 3.00, dividend proposal EUR 1.05.
- Record order backlog EUR 9,539m (+11.7%), order intake EUR 7,813m (+14.1%), book-to-bill 1.52; growth driven by Poland, Romania and the Czech Republic (CEE backlog +54.9%, PL +14.5%).
- Austria is 46.2% of output, Germany 25.5%, Poland 14.3%; civil engineering is 57.8% of the backlog, building construction 35.2%.
- Strategy "Intelligent Growth with Green and Lean": top 3 on each home market, EBIT margin target 3.5% to 4.0% by 2030; for 2026 moderate growth in output and revenue and a higher EBIT margin.
- Growth fields: infrastructure (rail, tunnels, roads, energy), data centres (group competence centre in Poland), industrial construction (Eli Lilly, ams OSRAM, BMW), PORR Healthcare (from the acquisition of VAMED's VSG), PORR Living modular affordable housing; Knape Bahnbau acquired for German railway construction.
- Strong balance sheet: net cash EUR 93.1m, cash EUR 748.4m, liquidity reserves EUR 1,197.8m, free cash flow EUR 232.9m; CAPEX EUR 252.9m (3.6% of output); ~20,829 average staff.
- Exiting Norway, Qatar and building construction in Switzerland; main risks: geopolitics and tariffs, project execution (gate system for projects over EUR 20m, Executive Board involved above EUR 100m), suppliers and energy prices, cyber, climate; the Leverkusen Bridge dispute with Autobahn GmbH is still ongoing.

### [PORR Half-Year Report 2026](https://porr-group.com/fileadmin/s_porr-group/IR/Konzernberichte/2026/PORR-H1_2026_en_7_sec.pdf)

Interim report · 2026-08-27

- H1 2026 production output EUR 3,167m (flat, -0.1%), revenue EUR 2,925.3m (-1.1%), after a long winter with snow well into April (building construction output -2.6%, civil engineering +7.2%).
- Earnings up: EBITDA EUR 171.1m (+11.6%), EBIT EUR 56.3m (+15.6%), EBIT margin 1.92% (1.65%), EBT EUR 49.2m (+26.8%), profit EUR 36.4m, EPS EUR 0.71 (+34.0%).
- Order backlog EUR 9,839m (+4.4%), 58.1% civil engineering; order intake EUR 3,466m (-14.4%) after a strong prior year; more than EUR 4.5bn of PL and CEE projects in final tendering.
- Guidance 2026: output and revenue +2% to 4%, EBIT margin 3.2% to 3.3%; 2030 target 3.5% to 4.0%; CAPEX ratio around 4.5%.
- Germany: Bundeswehr G-CAP framework contract worth EUR 270m for barracks; about EUR 400m of high-margin industrial and residential contracts in sight (about half secured); civil engineering tendering of EUR 1.5bn expected from October.
- Largest new orders: Szczecin western bypass and DK25 (Poland), X-FAB Fab4Micro cleanrooms in Erfurt, HMS 51 in Berlin, Fehmarn Sound Crossing, Klinik Favoriten psychiatric building (Vienna).
- Net debt EUR 460.6m (seasonal working capital, acquisitions), equity ratio 20.0%; acquisitions of 51% of drywall specialist rhtb group and EUR 56.4m of 9% UBM Development hybrid capital; PWW group expected to be sold.
- IGO Industries sold 4.0% of shares in July; free float now 56.6%; share at an all-time high of EUR 46.00 on 25 June.

### [PORR gegen die alte Baustelle: Karl-Heinz Strauss' Plan für den Bau der Zukunft (Industriemagazin)](https://industriemagazin.at/industrie/porr-karl-heinz-strauss-ki-roboter-baustelle-zukunft/)

Executive talk · Karl-Heinz Strauss, Chairman of the Executive Board and CEO · 2026-07-09

- CEO Karl-Heinz Strauss (CEO since September 2010) on the construction site of the future, in a long interview with Industriemagazin (July 2026, German).
- PORR's target is the paperless construction site; planning and costing are already almost fully digital, and site execution is being digitalised under Lean Construction.
- AI is used in administration, planning, project development, tenders and document review; the tax department has used AI for more than seven years; next step is AI checking plans and records against what was actually built.
- PORR has more than 60,000 devices and machines in the group, over 10,000 of them large equipment, tracked via telematics.
- Strauss sees the future of construction resting on own staff, logistics and procurement; PORR builds procurement platforms for more resilient, less distant sourcing.
- Robots already take over dangerous or overhead work (drilling, surveying); humanoid robots are the next step but will take time; labour shortage needs targeted immigration and retraining.
- Decarbonisation levers: greener cement and steel from suppliers, HVO100 fuel, electric equipment and hydrogen excavators, recycled asphalt and concrete with AI-optimised recipes (with the University of Innsbruck).
- Affordable housing: element (prefab) construction under PORR LIVING aims at building costs toward EUR 2,000 per square metre or below.

### [Klemens Eiter, CFO der PORR, im CFO Insight Podcast: finanzielle Resilienz (EY)](https://www.ey.com/de_at/media/podcasts/cfo-insight/2026/02/porr-finanzielle-resilienz)

Executive talk · Klemens Eiter, Executive Board Member and CFO · 2026-02-18

- CFO Klemens Eiter on PORR's financial resilience, in EY Austria's CFO Insight podcast (February 2026, German; published condensed interview text).
- ATX inclusion rests on operational excellence: profitability raised continuously and results doubled over the last four years; share price up about 150% in 15 to 18 months and share liquidity quadrupled.
- Portfolio: residential construction deliberately cut to about 8% of the business; about 60% is infrastructure; strong demand in Poland and Romania backed by EU funding.
- Capital markets: roadshows in Scandinavia, Canada and, for the first time in many years, New York.
- Risk: several thousand contracts a year; the largest projects are reviewed by independent risk managers from the bid phase; projects above EUR 20m are monitored continuously in a risk map.
- Compliance reviewed by an external commission and reported to the Executive Board quarterly; sustainability is now a precondition for winning contracts (recycled asphalt, certified sites).
- Skills shortage limits growth; PORR tripled its headcount in Romania; growth fields named: infrastructure, healthcare, affordable housing.

## Questions about PORR Group

### What does PORR do?

PORR is a full-service construction group building roads, railways, tunnels, bridges, power plants and buildings, with environmental engineering, design & engineering and its own raw materials and recycling, mainly in seven Central European home markets.

### What is PORR's revenue?

In 2025 PORR's revenue was EUR 6,295.9m and production output EUR 6,818m, with EBIT of EUR 196.7m. In H1 2026 revenue was EUR 2,925.3m.

### How many employees does PORR have?

PORR had 20,829 average staff in 2025 and 20,801 on average in H1 2026.

### What is PORR's strategy?

Under "Intelligent Growth with Green and Lean", PORR targets a top 3 position on each home market and an EBIT margin of 3.5% to 4.0% by 2030, growing in infrastructure, healthcare, affordable housing, industrial construction and data centres.

### Who leads PORR?

Karl-Heinz Strauss is Chairman of the Executive Board and CEO, Klemens Eiter is CFO, and Josef-Dieter Deix and Claude-Patrick Jeutter are COOs; Iris Ortner chairs the Supervisory Board.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_