# Portland General Electric account plan

> Portland General Electric is Oregon's regulated electric utility serving about 960,000 customers: FY2025 revenues $3,576 million, 2,877 employees.

## At a glance

Portland General Electric (PGE, NYSE: POR) is a vertically-integrated, cost-based regulated electric utility that generates, transmits and distributes electricity in a 4,000 square mile service area entirely within Oregon, including 51 incorporated cities. It served approximately 960,000 retail customers at December 31, 2025, and its prices are set by the Public Utility Commission of Oregon (OPUC). In FY2025 total revenues were $3,576 million (+4%), net income $306 million (vs $313 million) and diluted EPS $2.77. PGE reports as a single business segment and had 2,877 employees at December 31, 2025, of whom 666 are covered by agreements with IBEW Local Union No. 125.

## Business units

- **Residential retail** (48% of FY2025 retail revenues ($1,486 million)): Single and multiple family housing, mobile homes and small farms, with 840,457 average customers in 2025. Demand is weather sensitive: residential deliveries fell 1.8% in 2025 as usage per customer dropped 3%, with rooftop solar reducing usage. Programs include time-of-use pricing, Peak Time Rebates, Smart Thermostat, Smart Charging and the Green Future Program.
- **Commercial retail** (32% of FY2025 retail revenues ($985 million)): Most businesses, small industrial companies and public street and highway lighting taking delivery at residential voltages, with 114,912 average customers. Commercial energy deliveries decreased 0.1% in 2025 on mild temperatures, energy efficiency and economic uncertainty. Large customers can opt for Direct Access, paying PGE only for delivery.
- **Industrial retail** (18% of FY2025 retail revenues ($561 million)): 286 average customers taking delivery at higher voltages, mainly high-tech manufacturing and the digital service sector, including new data centers. It is the fastest-growing class: industrial retail revenues grew 23% in 2025 and industrial deliveries rose 10.1% over the nine months to September 30, 2026. PGE serves 12 data center customers, about one third of industrial usage.
- **Wholesale** (12% of FY2025 total revenues ($418 million)): Purchases and sales of electricity, natural gas and environmental credits to balance supply and manage risk, including participation in the CAISO western Energy Imbalance Market. Wholesale revenues fell 25% in 2025 on lower prices and volumes. PGE began participating in the CAISO Extended Day-Ahead Market (EDAM) on October 1, 2026.
- **Other operating revenues** (2% of FY2025 total revenues ($88 million)): Gains on resale of surplus natural gas, transmission services, excess transmission capacity resales and pole attachment rentals; up 31% in 2025.
- **Transmission and distribution**: Not a reported segment: about 32 million MWh delivered in 2025 over 1,744 circuit miles of transmission lines, in one balancing authority area. Transmission capex rises from $174 million in 2025 to $525 million in 2030. Projects include the North Plains Connector HVDC line and the Warm Springs Power Pathway upgrade from 230 kV to 500 kV.

## Strategic priorities

- **Decarbonize Power**: Oregon's HB 2021 requires GHG reductions of 80% by 2030, 90% by 2035 and 100% by 2040. The 2026 CEP/IRP filed October 15, 2026 sees about 3,400 MW needed by 2030, or about 6,700 MW to meet HB 2021 in full.
- **Electrify the Economy**: Serve the region's growth industries, chiefly high-tech and data centers. PGE expects large customer capacity to grow about 10% compounded annually through 2030, with a further 1.7 GW data center pipeline described as upside to guidance.
- **Advance Performance**: A safer, more reliable grid through cost-effective grid investments and modernized transmission, including the 2026-2028 Wildfire Mitigation Plan ($47 to $50 million a year of O&M and $70 to $84 million a year of capital), a Virtual Power Plant and grid enhancing technologies.
- **Affordability and cost management**: A multi-year business transformation and optimization programme expected to continue through 2026; the CFO said it yielded about $25 million in benefits. The data center tariff effective July 8, 2026 raised data center prices 29.7% on average while lowering other classes 1.3% to 2.1%.
- **Washington expansion**: Acquire PacifiCorp's select Washington generation, transmission and utility operations for $1.9 billion (about 140,000 customers), with a close targeted for mid-2027.
- **Regulatory frameworks**: The 2027 general rate case seeks a $179 million revenue requirement increase (about 4.8% overall) from July 1, 2027, with a bridge mechanism until the first multi-year rate plan in 2029.

## Latest results

In Q3 2026 (three months to September 30, 2026) total revenues were $971 million (+2%) and net income $119 million, or $1.00 per diluted share, vs $103 million ($0.94) a year earlier; non-GAAP net income was $125 million ($1.06). Over nine months net income fell to $232 million ($1.98 per diluted share vs $2.41), as lower wholesale revenues more than offset higher retail revenues. The mildest third quarter in a decade cut residential (-8.9%) and commercial (-4.8%) deliveries, while industrial deliveries rose 6.0%. PGE cut 2026 adjusted EPS guidance to $3.18 to $3.28 because of the weather; long-term guidance remains intact.

## Investments and deals

- **Capital plan**: $1,143 million of capex in 2025; the plan is $1,565 million for 2026 and $1,645 million for 2027, then $1,345 million in 2028, $1,440 million in 2029 and $1,450 million in 2030, before the two new hybrid projects.
- **Washington utility acquisition**: Agreement of February 15, 2026 to buy PacifiCorp's select Washington operations for $1.9 billion, including the Chehalis thermal plant (477 MW) and 4,500 miles of lines, with Manulife Infrastructure Fund III funding up to $600 million; financed by a ~$1.3 billion bridge plus a ~$700 million delayed draw term loan.
- **Solar-plus-battery hybrids**: Biglow Optimization (~$540 million) and Wheatridge Expansion (~$490 million) due end of 2027; new build-transfer deals for Biglow Optimization Phase 2 (200 MW solar, 250 MW battery, about $900 million) and Salmonfly (about $853 million), both due end of 2029.
- **Energy storage**: The 200 MW Seaside Grid battery entered service on July 8, 2025, bringing storage to about 522 MW; Meadowlark and Nottingham battery storage agreements sit outside the RFP.
- **Transmission build-out**: Transmission capex rising to $525 million in 2030, including a 20% share of the North Plains Connector HVDC line (about $3.2 billion) and the Warm Springs Power Pathway.

## Challenges and risks

- **Weather-driven demand**: Cooling degree-days were 23% below average in Q3 2026; weather was an estimated $0.20 year-to-date EPS headwind versus normal and led to the guidance cut.
- **Wildfire liability**: PGE may be unable to prevent a wildfire, and the lack of legislation limiting wildfire liability may weigh on its credit rating; insurance may not cover all liabilities.
- **Resource procurement constraints**: Interconnection, transmission and permitting constraints have materially reduced viable projects, so the 2025 RFP is expected to deliver fewer resources than anticipated.
- **Holding company conditions**: The OPUC's September 25, 2026 order imposed dividend restrictions PGE says may not be feasible; PGE does not expect to proceed unless they are clarified or modified.
- **Costs, tariffs and supply chain**: Trade tariffs raise the cost of poles, meters, transformers and equipment, alongside construction risk, cost disallowance and limits on renewable tax credits.

## What leadership says

> "We continue to execute on our strategic priorities. Industrial demand grew 9% on a weather-adjusted basis year over year, and cooler summer weather reduced residential and small-commercial demand" — Maria Pope, President and CEO, Third quarter 2026 results press release, October 29, 2026

> "Today, we serve 12 different data center customers, which make up approximately 1/3 of our total industrial usage." — Maria Pope, President and CEO, Q2 2026 earnings call, July 31, 2026

> "there is not a speculative queue here." — Joseph Trpik, CFO, Q2 2026 earnings call, July 31, 2026, on the contracted data center ramp

> "Greater predictability is good for both customers and shareholders, and we recognize that this will be multiyear work." — Maria Pope, President and CEO, Q1 2026 earnings call, May 1, 2026


## Where a supplier can help

- **Renewable and storage project delivery**: The Decarbonize Power priority and hybrid projects due end of 2027 and end of 2029 create needs for engineering, construction, battery and solar equipment, and interconnection expertise, especially as permitting constraints shrink the RFP.
- **Grid and wildfire technology**: The Advance Performance priority and the 2026-2028 Wildfire Mitigation Plan open room for grid enhancing technologies, monitoring, vegetation management and Virtual Power Plant software.
- **Cost and productivity tools**: The business transformation and optimization programme and the affordability focus favour suppliers that cut O&M, procurement or maintenance cost.
- **Integration of the Washington utility**: The pending Washington acquisition will need systems, billing, operations and procurement integration, where PGE expects O&M and procurement synergies.
- **Large-load connection services**: Industrial and data center growth under the Electrify the Economy priority calls for substation, transmission and large-load connection capacity, plus supply of transformers and equipment exposed to tariffs.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Form 10-K for the fiscal year ended December 31, 2025](https://www.sec.gov/Archives/edgar/data/784977/000119312526052750/por-20251231.htm)

Annual report · 2026-02-17

- Portland General Electric (PGE, NYSE: POR) is a vertically-integrated, cost-based regulated electric utility serving approximately 960,000 retail customers in a 4,000 square mile service area entirely within Oregon (51 incorporated cities); it reports as a single business segment and had 2,877 employees at December 31, 2025.
- FY2025: total revenues $3,576 million (+4%), net income $306 million (vs $313 million), diluted EPS $2.77 (vs $3.01); total retail revenues $3,070 million (+9%) while wholesale revenues fell 25% to $418 million.
- Growth engine is industrial load: industrial deliveries rose 17.3% (weather-adjusted 17.4%) on high-tech and data centers; industrial retail revenues reached $561 million (18% of retail revenues) vs residential $1,486 million (48%) and commercial $985 million (32%).
- Strategy rests on three imperatives: Decarbonize Power, Electrify the Economy and Advance Performance; Oregon's HB 2021 requires 80% GHG cuts by 2030, 90% by 2035 and 100% by 2040.
- On February 15, 2026 PGE agreed to buy PacifiCorp's select Washington generation, transmission and utility operations for $1.9 billion (about 140,000 customers, 4,500 miles of lines), with Manulife Infrastructure Fund III as minority partner funding up to $600 million.
- Capex plan: $1,143 million spent in 2025; about $1.7 billion planned for 2026 ($1,655 million in the table) and $1,740 million in 2027, including the Biglow Optimization (~$540 million) and Wheatridge Expansion (~$490 million) solar-plus-battery hybrids due end of 2027.
- The 2025 All-Source RFP final shortlist (12 projects) is expected to yield roughly 2,500 MW of renewable and non-emitting capacity; the CEP/IRP Update identifies a 3,500 to 4,500 MW need.
- Key regulatory items: holding company reorganization application (July 2025), New Large Load tariff and data center docket UM 2377, Seaside BESS recovery (rate base +$220 million at 9.34% ROE), DSP recovery stipulation (+$57 million revenue requirement).
- Main risks: weather and climate, wildfire liability with no limiting legislation, cyber and physical attacks, cost recovery before the OPUC, completion of the Washington acquisition, tariffs and supply chain, Colstrip and EPA rules, and concentration in one region.

### [Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/784977/000119312526436451/por-20260930.htm)

Interim report · 2026-10-29

- Q3 2026 (three months to September 30, 2026): total revenues $971 million (+2%), net income $119 million (vs $103 million), diluted EPS $1.00 (vs $0.94); nine months net income $232 million (vs $265 million), diluted EPS $1.98 (vs $2.41).
- Industrial deliveries keep growing (+6.0% in Q3, +10.1% over nine months), while a cool summer cut residential (-8.9%) and commercial (-4.8%) deliveries; cooling degree-days were 23% below average in Q3.
- 2027 general rate case filed August 4, 2026: $179 million revenue requirement increase (about 4.8% overall), ROE 9.75%, 50/50 capital structure, $8.6 billion rate base, prices effective July 1, 2027.
- Holding company: the OPUC's September 25, 2026 order raised customer benefits to about $83 million but imposed dividend conditions PGE says may not be feasible; PGE will not proceed unless they are clarified or modified.
- New data center tariff effective July 8, 2026: data center prices +29.7% on average, other classes down 1.3% to 2.1%.
- 2026 CEP/IRP (October 15, 2026) shows a 2030 need of about 3,400 MW (6,700 MW in the pathway meeting HB 2021 in full); new build-transfer deals for Biglow Optimization Phase 2 (~$900 million) and Salmonfly (~$853 million), both due end of 2029.
- Capex plan of $1,565 million for 2026 and $1,645 million for 2027, before the two new projects; Washington acquisition financing restructured into a ~$1.3 billion bridge plus a ~$700 million delayed draw term loan.
- PGE began EDAM participation on October 1, 2026; the 2025 RFP is expected to deliver fewer resources than planned because of interconnection, transmission and permitting constraints.

### [Portland General Electric Announces Third Quarter 2026 Results (press release, Exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/784977/000119312526437091/por-ex99_1.htm)

Interim report · 2026-10-29

- Q3 2026 GAAP net income $119 million ($1.00 per diluted share); non-GAAP net income $125 million ($1.06), vs $1.00 adjusted a year earlier.
- 2026 adjusted EPS guidance cut to $3.18 to $3.28 because of unusually mild third-quarter weather; long-term guidance remains intact.
- Weather was a $0.15 year-over-year EPS headwind in Q3 and an estimated $0.20 year-to-date versus normal, in the mildest third quarter in a decade.
- Industrial demand grew 9% year over year, driven by high-tech and data center customers.
- EDAM go-live on October 1 expected to save customers about $14 million in 2027.
- 2027 rate case: about 4.8% overall increase (about 3.9% for residential) from July 1, 2027, partly offset by lower 2027 power costs.
- PGE supports $78 million of customer rate credits and $5 million of community commitments for the holding company and says its growth plan does not depend on it.
- Quarterly dividend 55.125 cents per share; 2026 capex $1,565 million, O&M $810 million to $830 million.

### [Portland General Electric (POR) Q2 2026 Earnings Call Transcript](https://www.mitrade.com/insights/news/live-news/article-8-1978306-20260808)

Executive talk · Maria Pope, President and CEO · 2026-07-31

- Q2 2026: GAAP net income $68 million ($0.59 per diluted share), non-GAAP $74 million ($0.64); full-year guidance of $3.33 to $3.53 and 5% to 7% long-term EPS and dividend growth reaffirmed at the time.
- PGE serves 12 data center customers, about one third of industrial usage; industrial demand grew 11% year over year; about 10% compound annual large-customer growth expected through 2030 from contracted customers.
- A further 1.7 GW data center pipeline, mostly in permitting, is not in guidance and is described as upside.
- New Large Load Tariff raised average data center prices about 30% while lowering rates for other customers.
- 2027 rate case: about 4.8% overall (3.9% residential), 9.75% ROE, 50/50 capital structure, plus a bridge mechanism to the 2029 multi-year plan.
- Financing largely done for 2026: $550 million equity forward, $500 million ATM, $350 million term loan, $680 million delayed draw term loan for Washington; dividend raised 5% to $0.55125 a quarter, 60% to 70% payout target.
- Cost programme delivered about $25 million of benefits last year, with "probably got another couple of years of this left" (CFO).
- Washington acquisition still targeted to close mid-2027; holding company order expected late August.

### [Portland General (POR) Q1 2026 Earnings Call Transcript](https://www.fool.com/earnings/call-transcripts/2026/05/01/portland-general-por-q1-2026-earnings-transcript/)

Executive talk · Maria Pope, President and CEO · 2026-05-01

- Q1 2026: GAAP net income $45 million ($0.38 per diluted share), non-GAAP $68 million ($0.58), hit by extremely mild weather; Q1 was $0.25 below plan, of which $0.09 timing.
- PGE kept 2026 guidance of $3.33 to $3.53 and 5% to 7% long-term growth, relying on accelerated cost management (building on $25 million saved last year).
- 2026 weather-adjusted load growth lowered to 1.5% to 2.5%; industrial demand +10%, residential -6.2%, commercial -2.9%.
- Large customer capacity seen growing about 10% a year through 2030; the proposed data center tariff (UM 2377) included a 26% price increase for all data centers.
- Washington acquisition filed in Oregon and Washington; approval expected to take about a year, close targeted mid-2027; expected accretive in the first year without counting cost synergies.
- Transmission company paused to prioritise the holding company; parties still "pretty far apart" on credit and leverage.
- 2025 RFP targets about 2,500 MW; contracts expected from early 2027; 2026 CFO-to-debt metric estimated above 19%.
- Financing: $550 million equity forward, $350 million term loan, $680 million delayed draw term loan; dividend raised 5% to $0.55125.

## Questions about Portland General Electric

### What does Portland General Electric do?

PGE is a vertically-integrated regulated electric utility that generates, transmits and distributes electricity to approximately 960,000 retail customers in a 4,000 square mile area within Oregon.

### What is Portland General Electric's revenue?

FY2025 total revenues were $3,576 million (+4%) and net income $306 million. In Q3 2026 revenues were $971 million and net income $119 million.

### How many employees does Portland General Electric have?

PGE had 2,877 employees at December 31, 2025, of whom 666 are covered by agreements with IBEW Local Union No. 125.

### What is Portland General Electric's strategy?

Three imperatives: Decarbonize Power, Electrify the Economy and Advance Performance, with affordability as a stated focus. It is also acquiring PacifiCorp's select Washington operations for $1.9 billion.

### Who leads Portland General Electric?

Maria M. Pope is President (since October 2017) and CEO (since January 2018); Joseph R. Trpik is SVP Finance and CFO.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_