# PSEG account plan

> PSEG is a New Jersey utility holding company (PSE&G plus 3,758 MW of nuclear) with FY2025 operating revenues of $12,168 million.

## At a glance

Public Service Enterprise Group (PSEG) is a New Jersey public utility holding company: a predominantly regulated electric and gas utility, PSE&G, plus a nuclear generation business, PSEG Power, headquartered in Newark. PSE&G serves 2.4 million electric and 1.9 million gas customers in a territory home to about 74% of New Jersey's population, and PSEG Long Island operates the Long Island Power Authority's T&D system. In FY2025 operating revenues rose 18% to $12,168 million and net income was $2,111 million, or $4.22 per diluted share. Regulated rate base was about $36 billion at end-2025. Ralph A. LaRossa is Chair, President and CEO.

## Business units

- **PSE&G** (about 83% of FY2025 net income ($1,745 million)): New Jersey's franchised electric and gas transmission and distribution utility, with 2025 operating revenues of $9,558 million (up 13%). It earns on transmission under FERC formula rates and distribution under BPU-approved rates, with commodity passed through at no margin. Led by Kim C. Hanemann, President and COO of PSE&G.
- **PSEG Power & Other** (about 17% of FY2025 net income ($366 million)): PSEG Power owns 3,758 MW of nuclear capacity (Salem, Hope Creek, Peach Bottom) that generated about 30.9 TWh in 2025 at a 91.2% capacity factor, selling into PJM. The segment also includes gas supply to PSE&G, PSEG Long Island and competitively bid transmission; nuclear is led by Charles V. McFeaters, President and Chief Nuclear Officer.

## Strategic priorities

- **Regulated capital program**: $22.5 billion to $25.5 billion of regulated capex for 2026-2030, within a total program of $24 billion to $28 billion, targeting 6.0% to 7.5% rate base CAGR, with no new equity or asset sales.
- **Earnings growth**: Grow non-GAAP operating earnings by 6% to 8% a year through 2030; 2026 guidance is $4.28 to $4.40 per share.
- **Load growth from data centers and electrification**: The capex plan was raised $1.5 billion mainly for load growth from data centers and new customers; large-load inquiries hold at about the 11.8 GW level, mostly edge computing.
- **Contract nuclear output**: PSEG Power is developing terms with large-load customers for existing nuclear output, future uprates at Salem and other generation, and supports new nuclear at its Salem County site.
- **Affordability and regulatory lag**: PSE&G plans a filing by year-end 2026 to address regulatory lag on capital invested since its last rate case, framed as aligned with keeping rates flat.

## Latest results

In Q3 2026 (quarter to September 30, 2026), operating revenues fell 6% to $3,020 million and net income fell to $376 million, or $0.76 per diluted share, from $622 million, mainly on non-trading mark-to-market losses and lower NDT Fund gains. Non-GAAP operating earnings were $1.15 per share against $1.13. Over nine months, revenues rose 2% to $9,422 million and non-GAAP operating earnings were $3.56 per share. PSE&G earned $506 million in the quarter, while nuclear supplied 8.2 TWh at a 95.5% capacity factor. 2026 non-GAAP guidance of $4.28 to $4.40 per share was maintained.

## Investments and deals

- **Utility capex**: PSE&G invested about $3.7 billion in 2025 and is on track for about $4.2 billion of regulated capex in 2026, about 90% based on end-of-life replacements.
- **Gas main replacement (GSMP III)**: Approved November 2025: $1.05 billion for 525 miles of mains plus $360 million for 75 more miles, running through December 2028.
- **Energy efficiency (CEF-EE II)**: An approximately $2.9 billion energy efficiency program; PSE&G filed its Clean Energy Future EE 2.5 extension proposal in September 2026.
- **Nuclear uprates and licenses**: Power uprates planned at Salem 1 and 2, Hope Creek moved to a 24-month refuelling cycle, and 20-year license extensions expected for Salem and Hope Creek.
- **PJM transmission**: An approximately $424 million 500 kV PJM project in Maryland and northern Virginia, whose 2027 in-service date PSEG no longer believes is reasonably achievable.

## Challenges and risks

- **PJM resource adequacy**: The December 2025 capacity auction cleared at the $333.44/MW-day cap and fell 6,625 MW short; the CEO says PJM "continues to have a significant resource adequacy problem."
- **Customer affordability**: Higher supply costs led to bill credits, deferred payment plans and a summer shut-off moratorium, raising receivables and bad debt.
- **Regulatory and political uncertainty**: A June 2026 New Jersey law could remove the 50 bp RTO adder (about $40 million of annual net income), and the BPU is studying a new utility business model.
- **Nuclear operations**: Degradation found in Salem 1's thermal shield in October 2026 is expected to extend its refuelling outage.
- **Power price basis**: The PECO discount to PJM West Hub has widened to about 30%, though hedges limit near-term exposure.

## What leadership says

> "We continue to execute our long-term strategy to grow PSEG's non-GAAP Operating Earnings by a compound annual rate of 6% to 8% through 2030 while prioritizing customer affordability and maintaining a solid financial position." — Ralph A. LaRossa, Chair, President and CEO, Third quarter 2026 earnings release, November 2, 2026

> "PJM continues to have a significant resource adequacy problem." — Ralph A. LaRossa, Chair, President and CEO, Q3 2026 earnings call, November 2, 2026

> "The PTC floor is a regulated-type return" — Ralph LaRossa, Chair, President and CEO, Q4 2025 earnings call, February 26, 2026


## Where a supplier can help

- **T&D reliability and replacement work**: About $4.2 billion of 2026 regulated capex, mostly end-of-life replacements, plus GSMP III gas main replacement, supports contractors, equipment and materials suppliers.
- **Large-load interconnection**: Data center and edge computing load growth behind the raised capex plan creates needs for grid planning, interconnection studies and substation equipment.
- **Energy efficiency program delivery**: The CEF-EE programs and the EE 2.5 extension need program implementation, customer engagement and measurement partners.
- **Nuclear outage and uprate services**: Salem uprates, license extensions and the Salem 1 thermal shield inspection point to nuclear engineering, inspection and outage services.
- **Affordability and customer operations**: Rising bad debt, payment plans and time-of-use rates suggest a fit for collections, billing and customer analytics tools.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Public Service Enterprise Group Annual Report on Form 10-K for fiscal year 2025](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-20251231.htm)

Annual report · 2026-02-26

- Public Service Enterprise Group (PSEG) is a New Jersey public utility holding company: a predominantly regulated electric and gas utility (PSE&G) plus a nuclear generation business (PSEG Power), headquartered at 80 Park Plaza, Newark.
- FY2025: operating revenues $12,168 million (up 18%), net income $2,111 million or $4.22 per diluted share (2024: $1,772 million, $3.54).
- PSE&G earned $1,745 million of net income in 2025; PSEG Power & Other $366 million. PSE&G serves 2.4 million electric and 1.9 million gas customers in a territory home to about 6.8 million people, about 74% of New Jersey's population.
- Regulated rate base grew from about $34 billion (end-2024) to about $36 billion (end-2025). 2026-2030 regulated capital program: $22.5 billion to $25.5 billion, within a total program of $24 billion to $28 billion, targeting 6.0% to 7.5% rate base CAGR.
- PSEG Power owns 3,758 MW of nuclear capacity (Salem, Hope Creek, Peach Bottom) that generated about 30.9 TWh in 2025 at a 91.2% capacity factor; the nuclear production tax credit gives downside price protection from 2024 through 2032.
- Growth themes: data centers and other large loads, EV adoption and electrification, gas main replacement (GSMP III, $1.05 billion approved), energy efficiency (CEF-EE II, about $2.9 billion), Salem power uprates and long-term nuclear power sales.
- Key risks: PJM capacity-market prices and resource adequacy (December 2025 auction cleared at the $333.44/MW-day cap and fell 6,625 MW short), affordability pressure and regulatory/political uncertainty after a new New Jersey administration took office in January 2026, possible loss of the 50 bp RTO adder (about $40 million of annual net income), cybersecurity.
- Leadership: Ralph A. LaRossa (Chair, President and CEO), Daniel J. Cregg (EVP and CFO), Kim C. Hanemann (President and COO, PSE&G), Charles V. McFeaters (President and Chief Nuclear Officer, PSEG Nuclear). 59% of the workforce is represented by six unions, with agreements running until 2027.

### [Public Service Enterprise Group Quarterly Report on Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/788784/000119312526443789/peg-20260930.htm)

Interim report · 2026-11-02

- Q3 2026 (quarter to September 30, 2026): operating revenues $3,020 million (down 6%); net income $376 million or $0.76 per diluted share (Q3 2025: $622 million, $1.24).
- Nine months 2026: revenues $9,422 million (up 2%), net income $1,451 million or $2.91 per share (2025: $1,796 million, $3.59).
- The decline is driven by non-trading mark-to-market losses (-$180 million after tax in Q3) and lower NDT Fund gains, partly offset by T&D clause investment at PSE&G and higher capacity revenues at PSEG Power.
- PSE&G net income $506 million in Q3 (2025: $515 million) and $1,425 million for nine months; PSEG Power & Other a $130 million loss in Q3.
- Nuclear output about 23.9 TWh in nine months at a 94.3% capacity factor. Degradation found in Salem 1's thermal shield in October 2026 is expected to extend its refuelling outage.
- PSE&G plans a filing by year-end 2026 to address regulatory lag on capital invested since the last rate case. The capital plan is unchanged ($22.5 billion to $25.5 billion regulated, 2026-2030).
- Regulatory backdrop: New Jersey law making RTO membership mandatory from January 1, 2027 could cost the 50 bp ROE adder (about $40 million a year); a BPU study is weighing how to modernise the utility business model; PJM's reliability backstop auction is targeted for March 1, 2027.
- Nine-month capex: PSE&G $1,947 million; Power & Other $203 million excluding nuclear fuel. Quarterly dividend of $0.67 per share ($2.68 indicative annual).

### [PSEG Announces Third Quarter 2026 Results (earnings release, Form 8-K Exhibit 99)](https://www.sec.gov/Archives/edgar/data/788784/000119312526442778/d175962dex99.htm)

Interim report · 2026-11-02

- Q3 2026 net income $0.76 per share; non-GAAP operating earnings $1.15 per share (Q3 2025: $1.13). Nine months: non-GAAP $3.56 per share ($1,777 million), against $3.33.
- 2026 non-GAAP operating earnings guidance maintained at $4.28 to $4.40 per share.
- PSE&G earned $506 million, driven by Energy Efficiency and Transmission investment and customer growth, more than offset by depreciation and interest on investments not yet in rates and by tax timing.
- PSEG Power & Other non-GAAP operating earnings rose to $68 million (from $50 million), helped by the absence of last year's Hope Creek refuelling outage, higher realised prices and higher nuclear generation.
- Nuclear supplied 8.2 TWh in Q3 at a 95.5% capacity factor; Salem 1 entered refuelling after a 491-day breaker-to-breaker run.
- The CEO reaffirms 6% to 8% annual growth in non-GAAP operating earnings through 2030 and a $24 billion to $28 billion five-year capital plan funded "without the need to issue new equity or sell assets".
- Storms in July and September: PSE&G restored nearly all affected New Jersey customers within 24 hours.

### [PSEG (PEG) Q3 2026 earnings call transcript](https://www.fool.com/earnings/call-transcripts/2026/11/02/pseg-peg-q3-2026-earnings-call-transcript/)

Executive talk · Ralph A. LaRossa, Chair, President and CEO · 2026-11-02

- Q3 2026 call (November 2, 2026), Ralph LaRossa (Chair, President and CEO) and Daniel J. Cregg (EVP and CFO): 2026 guidance of $4.28 to $4.40 per share and the 6% to 8% growth outlook through 2030 reaffirmed.
- PSE&G will file a proposal with the BPU to address regulatory lag on capital invested since the last rate case, framed as aligned with the Governor's affordability agenda ("keep rates flat").
- PSE&G invested about $1.1 billion in Q3 and is on track for about $4.2 billion of regulated capex in 2026.
- Energy efficiency programmes generate over $1 billion a year of customer savings and have reached nearly 525 thousand customers since October 2020.
- PSEG Power is negotiating terms with large-load customers for existing nuclear output, future uprates and other generation. Salem uprate earnings fall within the five-year plan.
- Hedging: about 70 TWh sold forward; more than 95% hedged for 2026; 2027 expected above the PTC level. The PECO-West Hub basis has widened to about 30%, but hedges limit near-term exposure.
- PSEG Power cleared about 3.6 thousand MW at $325/MW-day in the July 2026 PJM auction. Liquidity was $3.9 billion at end-September.
- Large-load inquiries are holding at about the 11.8 GW level, mostly edge computing rather than hyperscale data centers. 2027 guidance and a rolled-forward plan come in February 2027.

### [PSEG (PEG) Q4 2025 earnings call transcript](https://www.fool.com/earnings/call-transcripts/2026/02/26/pseg-peg-q4-2025-earnings-call-transcript/)

Executive talk · Ralph LaRossa, Chair, President and CEO · 2026-02-26

- Q4/FY2025 call (February 26, 2026), Ralph LaRossa (Chair, President and CEO) and Daniel J. Cregg (EVP and CFO): FY2025 net income $4.22 and non-GAAP operating earnings $4.05 per share, at the high end of guidance for the 21st consecutive year.
- 2026 guidance initiated at $4.28 to $4.40 per share (7% above 2025 at the midpoint); the long-term non-GAAP EPS CAGR was raised to 6% to 8% through 2030.
- 2026 dividend raised $0.16 to $2.68 per share (about 6%).
- The 2026-2030 regulated capex plan rises to $22.5 billion to $25.5 billion (prior $21 billion to $24 billion), up $1.5 billion mainly for load growth from data centers and new customers. Rate base about $36 billion at end-2025, growing 6% to 7.5% a year; no new equity or asset sales.
- Nuclear: 30.9 TWh in 2025 at a 91.2% capacity factor; about 95% hedged for 2026 and "largely hedged" for 2027. Upside from contracting existing output and uprates, with Pennsylvania seen as "more fertile ground" for large deals.
- PSEG Long Island won a five-year OSA extension through 2030; PSE&G and PSEG Long Island ranked top in J.D. Power customer satisfaction studies.
- New Jersey policy: executive orders on supply and affordability, bills for nuclear and gas procurement; PSEG has sites "with grid connection capability and pipeline supplies".

## Questions about PSEG

### What does PSEG do?

PSEG owns PSE&G, New Jersey's largest transmission and distribution utility, and PSEG Power, which owns 3,758 MW of nuclear capacity; it also operates Long Island's T&D system through PSEG Long Island.

### What is PSEG's revenue?

FY2025 operating revenues were $12,168 million, up 18%, with net income of $2,111 million.

### Who leads PSEG?

Ralph A. LaRossa is Chair, President and CEO, and Daniel J. Cregg is EVP and CFO.

### What is PSEG's strategy?

PSEG allocates capital mainly to regulated investment, with a $24 billion to $28 billion five-year capital plan, 6% to 8% annual earnings growth through 2030, and contracting of its carbon-free nuclear output.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_