# Snam S.p.A. account plan

> Snam is Italy's regulated gas infrastructure operator (transport, storage, LNG), with €3,885 million revenue in 2025 and 4,008 employees.

## At a glance

Snam is a European natural gas infrastructure operator, running over 38,000 km of transport network in Italy and abroad, one sixth of the EU's storage capacity and Italian LNG regasification terminals. Most of its income is regulated by the Italian authority ARERA: in 2025 regulated revenues were €3,496 million of total revenues of €3,885 million, with Adjusted EBITDA of €2,969 million and reported net profit of €1,267 million. It also runs non-regulated Market Solutions businesses (biomethane, energy efficiency, sustainable mobility) and holds stakes in foreign gas infrastructure such as TAP and Teréga. The reference shareholder is CDP Reti (31.35%), controlled by Cassa Depositi e Prestiti; the group had 4,008 employees at year-end 2025 and is headquartered in Milan.

## Business units

- **Transportation** (about 73% of 2025 revenues (€2,855 million segment revenues)): Moves gas from import points, LNG terminals and storage to distribution networks and large industrial and power users over 33,122 km of network in use with 13 compression plants. Adjusted EBITDA rose 10.9% to €2,404 million in 2025 on RAB growth; technical investments were €2,188 million, including €554 million on the Adriatic Line.
- **Storage** (about 16% of 2025 revenues (€633 million segment revenues)): Operates 12 storage sites with 18.1 billion cubic metres of total capacity, the largest storage offer in Europe, after acquiring Edison Stoccaggio (now Stogit Adriatica) in March 2025 for approximately €565 million. EBITDA was €513 million in 2025; Stogit was renamed Snam Stoccaggio in April 2026.
- **Regasification** (about 5% of 2025 revenues (€180 million segment revenues)): Runs the Panigaglia, Piombino and Ravenna LNG terminals and, since March 2026, 100% of OLT at Livorno; Snam Energy Terminals was renamed Snam LNG. The Ravenna FSRU started commercial operations in May 2025, and first-half 2026 revenues rose 88.2% to €143 million.
- **Market Solutions** (about 9% of 2025 revenues (€342 million segment revenues)): Groups Bioenerys (35 biogas/biomethane plants), Renovit (energy efficiency contracts, backlog €1,544 million at mid-2026) and Greenture (bio-LNG and hydrogen refuelling stations). The biomethane business must be divested under ARERA rules; the agricultural part is in exclusivity with F2i and Femogas.
- **International and Italian associates** (€380 million net income from equity investments in 2025): Stakes include TAP (20%), Teréga (40.50%), TAG (84.47%), Interconnector (23.68%), SeaCorridor (49.90%), EMG (25%) and Italgas (11.40%). The associates' contribution is expected to rise to around €420 million by 2030.

## Strategic priorities

- **€13.7 billion 2026-2030 investment plan**: Investments of approximately €13.7 billion net of grants, 97% regulated: €9.2 billion for transport, €2.1 billion for storage, about €1 billion for LNG, €800 million for CCS, €200 million for hydrogen and €400 million for Market Solutions.
- **Grow the regulated asset base**: Targets of 5.7% a year RAB growth, 5.4% Adjusted EBITDA growth (about €3.8 billion by 2030) and 4.5% adjusted net profit growth, with 4% annual dividend per share growth to 2030.
- **Security of supply and gas flexibility**: Complete the Adriatic Line (~425 km, +10 Bcm/a South-North capacity), methanise Sardinia, build 6 dual-fuel compression stations and reach 14 Bcm/a of transport capacity to Austria by 2030.
- **Asset rotation**: Around €3 billion of opportunities (€1.6 billion divestments, €1.2 billion acquisitions), adding €1.8 billion of RAB and 6% EBITDA by 2030; a 5% stake in De Nora was sold in 2026.
- **Decarbonisation molecules: CCS and hydrogen**: About €800 million for the Ravenna CCS hub with Eni, scaling to 4 million tonnes of CO2 a year with FID expected by 2027, and €0.2 billion for the SoutH2 hydrogen corridor.
- **Digital and energy technology**: Around €1 billion by 2030 for industrial AI, next-generation ERP, digital twins, dispatching and maintenance, of which around €800 million digital.

## Latest results

In the first nine months of 2026, Adjusted EBITDA reached EUR 2,402 million, +8% on a restated basis and +11% excluding the EUR 52 million deflator one-off, driven by regulated revenue growth, Stogit Adriatica, the Ravenna FSRU, OLT and a storage RAB recovery. Adjusted net income was EUR 1.111 billion and investments about EUR 2.3 billion including OLT control; net debt stood at EUR 18.3 billion. Italian gas demand rose 2.4% to 45.4 BCM, and storage was 90% full on 20 October against a European average around 73%. For full-year 2026 the CFO raised Adjusted EBITDA guidance to more than EUR 3.1 billion and confirmed adjusted net income above EUR 1.45 billion and net debt of EUR 18.9 billion.

## Investments and deals

- **Adriatic Line**: €554 million spent in 2025; phase I was completed by November 2026 and phase II Foligno-Sestino was at 44%.
- **OLT and LNG terminals**: Igneo's 48.24% and Golar's 2.69% of OLT bought in March 2026 for about €129 million, taking Snam to 100%; about €1 billion planned for the Panigaglia upgrade, the Sardinia virtual pipeline and OLT.
- **Edison Stoccaggio acquisition**: Acquired on 3 March 2025 for approximately €565 million, adding €55 million of regulated revenues in 2025.
- **Divestments**: Sale of the Galaxy Pipeline stake (USD 247 million), the ITM Power stake and 5% of De Nora; the biomethane business is being sold under ARERA unbundling rules. The Open Grid Europe 24.99% deal was terminated on 17 November 2025.
- **Ravenna CCS hub**: About €800 million (€400 million for the CO2 network, €400 million equity into the Eni joint venture); selected for the EU Innovation Fund with around EUR 160 million for Snam.

## Challenges and risks

- **Regulatory returns**: Tariff parameters are set by ARERA: the 2025 WACC cut reduced regulated revenues by €104 million, and a 2027 WACC trigger points to a 1.3% reduction in transport WACC. LNG remuneration is capped at 64% and Snam is asking for 100%.
- **Rising debt and tax**: Net debt is planned to rise to about €23.8 billion by 2030, and the IRAP increase costs about €40 million a year in 2026 and 2027, with a draft to raise it further from 2027.
- **Geopolitics and energy security**: The Middle East conflict since 28 February 2026 hit EMG and put Qatari LNG under force majeure; the CEO warned of price pressure as others refill storage.
- **Long-term gas demand under transition policy**: Fit for 55 and EU Taxonomy policies could accelerate the decline of fossil gas demand; Snam targets carbon neutrality by 2040 (Scope 1 & 2) and net zero by 2050.
- **Biomethane disposal**: ARERA requires the biomethane business to be unbundled by 30 June 2027; offers for the waste part were not satisfactory.

## What leadership says

> "Flexibility is becoming the scarce resource, and natural gas provides this flexibility to the energy system." — Agostino Scornajenchi, CEO and General Manager, 2026-2030 Strategic Plan presentation, Milan, 5 March 2026

> "Energy systems must be diversified and built with redundancy." — Agostino Scornajenchi, CEO and General Manager, H1 2026 results conference call, 29 July 2026

> "we are asking for a long-term, stable, and visible 100% remuneration on our LNG terminals." — Agostino Scornajenchi, CEO and General Manager, H1 2026 results conference call, 29 July 2026

> "We are committed to deliver the EUR 14 billion" — Luca Passa, Chief Financial, Sustainability and International Asset Management Officer, 9M 2026 results conference call, 11 November 2026


## Where a supplier can help

- **Engineering and construction capacity**: The €13.7 billion investment plan with more than 1,200 active construction sites (Adriatic Line, pipeline replacement, compression stations) needs pipeline, compressor and construction suppliers.
- **Digital, AI and ERP**: The around €1 billion digital and energy tech budget (industrial AI, next-generation ERP, digital twins, dispatching) is a direct opening for software and systems integrators.
- **CCS and hydrogen technology**: The Ravenna CCS hub and SoutH2 corridor call for CO2 network, monitoring and hydrogen-ready equipment suppliers.
- **Regulatory and financing advisory**: With WACC reviews, LNG remuneration talks and rising debt, advisory on regulation, sustainable finance and treasury fits the challenges above.
- **Energy efficiency delivery partners**: Renovit's energy efficiency backlog, aimed largely at public administration, needs installation and building-technology subcontractors.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Snam Annual Report 2025](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/bilanci-annuali/2025/annual_report_2025.pdf)

Annual report · 2026-03-30

- Snam is the leading European operator in natural gas infrastructure: transportation (over 38,000 km of network in Italy and abroad), storage (one sixth of EU capacity) and regasification (third largest European player, 28 billion cubic metres a year managed or co-managed); 4,008 employees at end-2025.
- FY2025: total revenues €3,885 million (+8.9%), Adjusted EBITDA €2,969 million (+7.8%), adjusted net profit €1,422 million (+10.3%), reported net profit €1,267 million; technical investments €2,865 million; net financial debt €17,509 million; RAB €26.2 billion (+8.3%).
- Regulated revenues were €3,496 million; Transportation is by far the largest segment (Adjusted EBITDA €2,404 million), ahead of Storage (EBITDA €513 million), Regasification (EBITDA €91 million) and Market Solutions (EBITDA €10 million).
- 2025 moves: acquisition of Edison Stoccaggio (approx. €565 million, now Stogit Adriatica; storage capacity 18.1 billion m3), start-up of the Ravenna FSRU (BW Singapore), sale of the Galaxy/ADNOC pipelines stake (USD 247 million), terminated the 24.99% Open Grid Europe deal; in March 2026 took sole control of OLT (Livorno FSRU).
- 2026-2030 Strategic Plan: investments of approximately €13.7 billion (+€1.3 billion vs previous plan), 97% regulated; €9.2 billion transport, €2.1 billion storage, about €1 billion LNG, about €800 million Ravenna CCS, €0.2 billion hydrogen, €0.4 billion Market Solutions; about €1 billion in digital innovation and energy technology.
- Plan targets: average annual growth of RAB 5.7%, Adjusted EBITDA 5.4% (about €3.8 billion by 2030), adjusted net profit 4.5%; dividend growth of 4% a year until 2030 (€0.3021 per share for 2025); an asset rotation programme of around €3 billion on top (€1.6 billion divestments, €1.2 billion acquisitions).
- 2026 guidance: investments €2.8 billion, tariff RAB €28.8 billion, Adjusted EBITDA about €3.1 billion, adjusted net profit above €1.45 billion, net debt about €19 billion; the biomethane business is to be divested by 2027 under ARERA unbundling rules.
- Risks: regulation (WACC cut from 5.9% to 5.5% in transport cost €78 million of revenue), gas demand and decarbonisation policy, Middle East conflict (25% stake in EMG), an IRAP tax increase costing about €40 million a year in 2026-2027.

### [Snam Half-Year Financial Report 2026](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/relazioni/2026/SNAM_2026_Half_Year_Financial_Report.pdf)

Interim report · 2026-07-31

- H1 2026: total revenues €2,026 million (+6.3%), Adjusted EBITDA €1,572 million (+5.4%; +9.2% excluding the 2025 deflator one-off), adjusted net profit €733 million (-2.3%), reported net profit €650 million (-15.9%).
- Total investments €1,613 million (+43.8%) including OLT; technical investments €1,083 million (transport €780 million, storage €106 million, regasification €26 million, Market Solutions €143 million).
- Snam took 100% of OLT (Tuscany FSRU off Livorno) in March 2026 for about €129 million in total; regasified LNG rose to 5.32 billion m3 (+75.6%); LNG was 32% of Italian gas inflows.
- Storage capacity 18.2 billion m3, 67% full at 30 June 2026; the 90% filling target for next winter was secured in April auctions.
- Net financial debt €18,803 million (from €17,509 million), with €913 million from non-recurring OLT and Italgas exchangeable operations; free cash flow €678 million.
- 2026 guidance confirmed: investments €2.8 billion, tariff RAB €28.8 billion, Adjusted EBITDA about €3.1 billion, adjusted net profit above €1.45 billion; net debt guidance improved to about €18.9 billion.
- Moody's upgraded Snam to Baa1 (April 2026); S&P outlook to stable; sustainable finance 90% of funding; €1.5 billion dual-tranche green/sustainability-linked bond in June.
- Biogas/biomethane disposal: binding phase concluded 28 July, signing targeted by year-end (ARERA unbundling, Resolution 140/2023).

### [Snam 2026-2030 Strategic Plan and FY2025 results presentation - transcript](https://www.snam.it/content/dam/snam/pages-attachments-search/en/documenti/presentazioni/2026/2026-2030_Strategic_Plan_Transcript.pdf)

Executive talk · Agostino Scornajenchi, Chief Executive Officer and General Manager · 2026-03-05

- First strategic plan of CEO Agostino Scornajenchi (in post since May 2025), "Toward Energy Integration", presented with CFO Luca Passa on 5 March 2026 alongside FY2025 results.
- FY2025: Adjusted EBITDA €2,969 million (+7.8%), adjusted net income €1,422 million, net debt €17.5 billion, all better than guidance.
- Investment plan 2026-2030 of 13.7 billion net of grants (~+10%): 9.2 billion transport, 2.1 billion storage, 1 billion LNG, 800 million CCS, 200 million H2, 400 million market solutions; about €1 billion in digital and energy tech.
- Targets: RAB CAGR 5.7%, EBITDA 5.4%, net income 4.5%; 4% annual DPS growth to 2030 with an 80% payout cap; 2026 EBITDA around 3.1 billion and net income above €1.450 billion.
- Around €3 billion asset rotation on top (1.6 billion divestments, 1.2 billion acquisitions); biomethane to be sold, expected to generate approximately €65 million of EBITDA in '27 at full capacity.
- Gas demand view: 62 billion cubic meter by 2030 and 61.5 in 2035, well above the national plan; "gas is no longer a transition fuel, but a critical enabler of system adequacy".
- Ambition to 2035: roughly €28 billion of investment over 2026-2035, RAB from 26.2 billion to around €41.3 billion.
- On Hormuz: Qatar is 30% of LNG and LNG 30% of Italian consumption; short-term "no issue"; Snam wants LNG terminals to have adequate remuneration.

### [Snam H1 2026 results conference call - transcript](https://stockanalysis.com/quote/bit/SRG/transcripts/566655-q2-2026/)

Executive talk · Agostino Scornajenchi, Chief Executive Officer and General Manager · 2026-07-29

- H1 2026 results call (29 July 2026), CEO Agostino Scornajenchi with CFO Luca Passa.
- Adjusted EBITDA EUR 1,572 million, +9% net of the 2025 deflator one-off; adjusted net income EUR 733 million (+3% on the same basis); net debt EUR 18.8 billion; 2026 net debt guidance improved to EUR 18.9 billion.
- Gas "accounts for around 37% of the country's primary energy consumption" and generates roughly half of domestic electricity; LNG was 32% of inflows in H1.
- Storage around 70% full vs about 55% European average; 90% target secured; Adriatic Line Phase 1 90% completed; 40% of Ravenna capacity sold forward for 10 years.
- Associates contributed EUR 212 million (+4%), about EUR 365 million expected for the year; TAP the main positive contributor.
- Seventh regulatory period: positives (ROSS simplification) and concerns (gearing in WACC, remuneration of work in progress); final resolution expected Q1 2027.
- Snam wants "100% remuneration on our LNG terminals" (currently capped at 64%); biomethane disposal signing targeted by end-2026.
- CEO argues regulated return on capital should in the long term also apply to flexible gas generation; batteries "are not a source".

### [Snam 9M 2026 results conference call - transcript](https://stockanalysis.com/quote/bit/SRG/transcripts/671372-q3-2026/)

Executive talk · Luca Passa, Chief Financial, Sustainability and International Asset Management Officer · 2026-11-11

- 9M 2026 results call (11 November 2026) presented by CFO Luca Passa.
- Adjusted EBITDA EUR 2,402 million (+11% net of the 2025 deflator one-off); adjusted net income EUR 1.111 billion (+4% on the same basis); investments about EUR 2.3 billion; net debt EUR 18.3 billion.
- FY2026 EBITDA guidance raised to more than EUR 3.1 billion; net income above EUR 1.45 billion and net debt EUR 18.9 billion confirmed; average cost of debt 2.7%.
- Italian gas demand 45.4 BCM (+2.4%), third year of growth driven by power generation; storage reached 90% on October 20th, ten days early.
- Asset rotation under way: 5% of De Nora sold (16% kept); exclusivity with F2i and Femogas for the agricultural biomethane business, signing by year-end; waste business offers not satisfactory.
- Ravenna CCS selected for EU Innovation Fund, about EUR 290 million grant (around EUR 160 million for Snam).
- Regulation: 2027 WACC trigger set to cut transport WACC (1.3% excluding France), which Snam contests; second consultation for the seventh period keeps work-in-progress remuneration; final resolution Q1 2027.
- Passa commits to the EUR 14 billion plan and hints at higher spending in the next plan update early 2027; transition plan update on December 14th.

## Questions about Snam S.p.A.

### What does Snam do?

Snam transports, stores and regasifies natural gas in Italy, operating over 38,000 km of network, one sixth of EU storage capacity and LNG terminals, and holds stakes in foreign gas infrastructure.

### What is Snam's revenue?

Total revenues were €3,885 million in 2025 (+8.9%), of which €3,496 million regulated; Adjusted EBITDA was €2,969 million.

### How many employees does Snam have?

Snam had 4,008 employees at year-end 2025 and 4,044 at mid-2026.

### Who leads Snam?

Agostino Scornajenchi is CEO and General Manager and Alessandro Zehentner is Chairman, both appointed on 14 May 2025; Luca Passa is CFO.

### What is Snam's strategy?

Its 2026-2030 plan invests approximately €13.7 billion, mostly in regulated gas transport and storage, plus CCS, hydrogen and digital, with an asset rotation programme on top.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_
