# SSE plc account plan

> SSE plc is a UK-listed electricity networks, renewables and flexible generation group with 15,197 direct employees and a £33bn investment plan to 2029/30.

## At a glance

SSE plc invests in, builds and operates electricity infrastructure in the UK, Ireland and selected overseas markets: transmission and distribution networks, onshore and offshore wind, hydro and batteries, flexible gas-fired generation, and energy supply to homes and businesses. It is organised in three pillars, Networks, Renewables and Flexibility, and serves 4.96m networks and supply customers. In the year to 31 March 2026 it reported revenue of £10,186.5m and adjusted operating profit of £2,236.6m (£2,419.2m the year before), with 15,197 direct employees. It is listed in the UK, with a market capitalisation of £31bn at 31 March 2026. Martin Pibworth is Chief Executive, Barry O'Regan CFO and Sir John Manzoni Chair.

## Business units

- **SSEN Transmission** (Adjusted operating profit £562.6m in FY2025/26 (about 25% of group); 48% of adjusted capex): Owns and develops the high-voltage transmission system in the north of Scotland and its islands; 75% owned by SSE, 25% by Ontario Teachers' Pension Plan Board. Profit rose 74% in FY2025/26 on regulator-agreed allowances, with 11 major projects under way and RIIO-T3 accepted in March 2026. Led by Managing Director Rob McDonald.
- **SSEN Distribution** (Adjusted operating profit £335.3m in FY2025/26 (about 15% of group); 24% of adjusted capex): Runs the distribution networks serving around 4m homes and businesses in central southern England and the north of Scotland. Profit fell 54% because the prior year included a non-recurring inflation catch-up, while capex rose 34%; the ED3 business plan is due in December 2026. Led by Managing Director Chris Burchell.
- **SSE Renewables** (Adjusted operating profit £1,076.4m in FY2025/26 (about 48% of group); 21% of adjusted capex): Develops and operates onshore and offshore wind, hydro and battery storage in the UK, Ireland, Spain and Italy, with 5,279MW of capacity. Profit rose 4% on output from Dogger Bank A and Yellow River despite lower hedge prices; the target is ~9GW installed by 2029/30. Led by Managing Director Stephen Wheeler.
- **SSE Thermal** (Adjusted operating profit £195.4m in FY2025/26 (about 9% of group); 5% of adjusted capex): Owns flexible gas-fired generation in GB and Ireland (6,210MW gas-fired) and gas storage in GB. Profit fell on unplanned outages and low volatility; new plants are being built in Ireland at Tarbert and Platin. Led by Managing Director Finlay McCutcheon.
- **Energy Customer Solutions** (Adjusted operating profit £136.9m in FY2025/26 (about 6% of group); segment revenue £4,901.2m): SSE Airtricity serves 720,000 customers in the all-island Ireland market and SSE Business Energy around 240,000 non-domestic accounts in GB. Profit fell 29%; data centres are a growth area, with Airtricity supplying around 80% of the energy to data centres in Ireland. Led by Managing Director Nikki Flanders.
- **SSE Energy Markets** (Adjusted operating profit £43.2m in FY2025/26 (about 2% of group)): Trades power, gas and carbon to optimise SSE's market-based assets and manage risk. Profit rose 44% on optimisation trading and green certificate sales; it holds 2.9GW of CfD-backed route-to-market contracts. Led by Managing Director Gordon Bell.

## Strategic priorities

- **£33bn investment plan to 2029/30**: A fully-funded plan announced in November 2025 trebles investment over five years, with about 80% (~£27bn) in regulated networks and ~20% (~£6bn) in Renewables and Flexibility.
- **North of Scotland transmission build-out**: About £22bn goes to SSEN Transmission, taking gross RAV to ~£30bn by 2029/30 (~30% CAGR) across 11 major projects (six onshore, five offshore); 25 of 34 major consents were secured at the annual report.
- **Earnings and dividend targets**: Adjusted EPS of 168-193p for 2026/27 and 225-250p for 2029/30, a 10-13% CAGR from 2025/26; dividend growth of 5-10% a year from a 64.2p baseline; ~80% of EBITDA index-linked in 2029/30.
- **Renewables capacity to ~9GW**: Installed capacity is to reach ~9GW by 2029/30 through Dogger Bank, Berwick Bank (phase B won a 20-year CfD for 1.4GW, FID expected in 2027) and battery projects, under a 'value over volume' discipline.
- **Cost efficiency**: The Operating Model and Efficiency Review targets over £100m of savings during FY27 and over £200m recurring by the end of FY28.
- **Balance sheet discipline**: Net debt/EBITDA is to stay below 4.5x through the plan (3.3x at March 2026), funded by a £2bn equity placing, rising debt and hybrids and around £2bn of asset rotations.

## Latest results

In FY2025/26 (year to 31 March 2026) adjusted operating profit was £2,236.6m against £2,419.2m, adjusted EPS fell 5% to 153.5p on the dilution from the November 2025 equity issue, and the full-year dividend rose 7% to 68.7p. Capex reached a record £3,585.6m. In its trading update of 1 October 2026, ahead of H1 2026/27 results on 18 November 2026, SSE said adjusted investment in networks was around 70% higher than a year earlier and renewable output around 20% higher. It expects interim adjusted EPS of 64 to 68 pence, half-year capital investment of around £2.5bn and adjusted net debt and hybrid capital of around £11.5bn. Full-year guidance is unchanged: adjusted EPS of 168-193p for 2026/27 and capex of over £5bn.

## Investments and deals

- **Record capex**: Adjusted investment and capex was a record £3,585.6m in FY2025/26 (£2,910.4m the year before) and is expected at over £5bn in 2026/27.
- **Spittal-Peterhead and EGL2**: SSE's largest ever contract, €2bn with NKT, covers the Spittal-Peterhead HVDC link; EGL2, a 2GW, 505km HVDC link with National Grid, opens in 2029.
- **Dogger Bank and Berwick Bank**: Dogger Bank (3.6GW, SSE 40%) has turbine installation complete at A and beyond the half-way point at B as of October 2026; Berwick Bank is consented for up to 4.1GW.
- **New thermal and battery capacity**: Tarbert Next Generation (300MW, from October 2027) and Platin (170MW, from October 2028) in Ireland; Monk Fryston (320MW), Fiddlers Ferry (150MW) and Derrymeen (100MW) batteries under construction.
- **Equity placing and asset rotation**: A £2bn equity placing completed in November 2025, with around £2bn of targeted asset rotations timed mainly towards the end of the plan.

## Challenges and risks

- **Energy affordability**: Rated as slightly increased: consumer energy debt rose 20% over 2025 and the Electricity Generator Levy went up from 45% to 55%.
- **Political and regulatory change**: Remains heightened amid fragmented net zero sentiment, and was reassessed after the conflict in the Middle East.
- **Large capital projects and supply chain**: Large Capital Projects Management and Supply Chain are rated high likelihood and high impact as the plan trebles investment.
- **Grid delays on onshore wind**: A £155.8m impairment was taken on the Aberarder and Strathy South onshore wind farms, delayed by grid access.
- **Cyber security and resilience**: Rated high likelihood and high impact, alongside storm exposure such as Storm Floris, which affected almost 85,000 distribution customers.

## What leadership says

> "Right now, the most critical piece in the energy transition jigsaw is the transmission network in the north of Scotland." — Martin Pibworth, Chief Executive, SSE plc Annual Report 2026, June 2026

> "This is a great growth opportunity, but it is not incorporated in our targets." — Martin Pibworth, Chief Executive, On data centres, full-year results presentation, 28 May 2026

> "Ultimately, these vital projects are in our licence conditions and they will be delivered." — Martin Pibworth, Chief Executive, On transmission projects, HY26 interim results and 2030 plan presentation, November 2025

> "We don't take issuing equity lightly" — Barry O'Regan, CFO, HY26 interim results and 2030 plan presentation, November 2025


## Where a supplier can help

- **Transmission project delivery**: Tied to the north of Scotland transmission build-out and the large capital projects risk: suppliers of engineering, modular substations, construction services and project controls can support 11 major projects.
- **Efficiency programme**: Tied to the over £200m recurring savings target by the end of FY28: automation, procurement and operating-model tools that help a more commercially-minded organisation.
- **Data centre connections**: Tied to the data centre growth option outside targets: partners for private network connections, power supply and energy services to hyperscalers in Ireland and the M4 corridor.
- **Cyber and grid resilience**: Tied to the cyber security and storm resilience risks: security, monitoring and network restoration solutions across transmission and distribution.
- **Battery and thermal build**: Tied to the battery and Irish thermal investments: equipment, EPC and commissioning services for projects under construction.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [SSE plc Annual Report 2026 (year ended 31 March 2026)](https://www.sse.com/media/gugb5kyl/sse_ar26_interactive_18mb.pdf)

Annual report · 2026-06-12

- SSE plc is a UK-listed electricity company (about 15,000 employees; 15,197 direct employees; market capitalisation £31bn at 31 March 2026) organised around three pillars: Networks (SSEN Transmission, SSEN Distribution), Renewables (SSE Renewables) and Flexibility (SSE Thermal, Energy Customer Solutions, SSE Energy Markets), in the UK, Ireland and selected overseas markets.
- FY2025/26 (year to 31 March 2026): adjusted operating profit £2,236.6m (£2,419.2m prior year), adjusted EPS 153.5p (161.3p), reported EPS 105.5p, full-year dividend 68.7p (+7%); reported revenue £10,186.5m; adjusted investment and capex a record £3,585.6m (£2,910.4m).
- Networks accounted for 40% of adjusted operating profit; SSEN Transmission profit rose 74% to £562.6m while SSEN Distribution fell 54% to £335.3m after a non-recurring inflation catch-up in the prior year; SSE Renewables reached £1,076.4m (+4%).
- Strategy: a fully-funded £33bn five-year investment plan to 2029/30 announced in November 2025, about 80% (~£27bn) in regulated networks, ~£22bn of it in SSEN Transmission (gross RAV to ~£30bn, ~30% CAGR); networks RAV to more than treble to ~£40bn and renewables capacity to ~9GW.
- Targets: adjusted EPS 168-193p for 2026/27 and 225-250p for 2029/30 (10-13% CAGR from 2025/26); capex over £5bn in 2026/27; dividend growth 5-10% a year from a 64.2p baseline; net debt/EBITDA below 4.5x (3.3x at March 2026); ~80% of EBITDA index-linked in 2029/30.
- Funding: £2bn equity placing completed November 2025, around £2bn of targeted asset rotations, rising net debt and hybrid capital (£10.1bn at March 2026; 92% fixed rate; average cost of debt 4.1%; Baa1/BBB+/BBB+).
- Delivery: 11 major transmission projects (six onshore, five offshore), 25 of 34 major consents secured; RIIO-T3 Final Determination accepted in March 2026; Dogger Bank A turbines installed, Berwick Bank B won a 20-year CfD for 1.4GW at £89.49/MWh, FID expected in 2027.
- Growth options outside targets: data centres (SSE Airtricity supplies around 80% of the energy to data centres in Ireland; private network solution for a Microsoft data centre in South Wales).
- Main risks: Energy Affordability (slightly increased), Political and Regulatory Change (heightened, Electricity Generator Levy up from 45% to 55%), cyber security, large capital projects and supply chain, all reassessed after the conflict in the Middle East.
- CEO Martin Pibworth (first year in role) and CFO Barry O'Regan; Chair Sir John Manzoni. A Group Operating Model and Efficiency Review led to £84.7m of restructuring charges and a new purpose: to be restless every day until we make electricity clean, affordable and available for all.

### [SSE plc Trading Update, 1 October 2026 (ahead of H1 2026/27 results)](https://www.investegate.co.uk/announcement/rns/sse--sse/trading-update/9800206)

Interim report · 2026-10-01

- Pre-close trading update ahead of half-year results (six months to 30 September 2026) due on 18 November 2026.
- Expected half-year adjusted EPS of 64-68 pence, reflecting lower seasonality as regulated networks earn a growing share of profit.
- Regulated networks investment around 70% higher year-on-year, mostly in Transmission, where work continues on the 11 major projects.
- Renewables output expected around 20% higher year-on-year on more favourable weather and capacity growth; Dogger Bank B turbine installation beyond the half-way point.
- Full-year expectations for each Business Unit unchanged, subject to weather, market conditions and plant availability over the winter.
- Guidance reiterated: adjusted EPS 168-193p for 2026/27 and 225-250p for 2029/30.
- Half-year capital investment expected around £2.5bn; adjusted net debt and hybrid capital around £11.5bn.

### [SSE full-year results to 31 March 2026 presentation transcript (Martin Pibworth, Barry O'Regan)](https://www.sse.com/media/rqhfphem/fy26-results-presentation-transcript.pdf)

Executive talk · Martin Pibworth, Chief Executive · 2026-05-28

- Martin Pibworth's first full-year results as Chief Executive (28 May 2026), with CFO Barry O'Regan; prepared remarks only.
- FY26 adjusted EPS 153.5p, towards the top end of guidance; record group capex of £3.6bn; a 7% dividend increase recommended; 60% of underlying earnings index-linked this year.
- Transmission investment up 80% with construction under way on five major projects in the north of Scotland; three quarters of transmission consents approved.
- £33bn plan: 80% of investment in regulated Networks, ~25% compound annual growth; target 225-250p EPS by 2030, a 10 to 13% annual growth rate; FY27 guidance 168-193p unchanged.
- Efficiency programme: over £100m of savings in FY27 and over £200m recurring by the end of FY28.
- Balance sheet: leverage 3.3x net debt to EBITDA, 92% of debt fixed at ~4.1% average cost, ~£7.4bn of liquidity covering 17 months.
- Renewables: Dogger Bank A turbines installed, 20 turbines at Dogger Bank B; Berwick Bank phase B has a 20-year CfD, FID anticipated in 2027.
- Data centres are an upside not in targets: over 80% of Irish data centre power demand supplied, ~1.6GW of private network connections under agreement, over 2GW of contracted applications in the Southern distribution area.

### [SSE HY26 interim results and 2030 investment plan presentation transcript (Martin Pibworth, Barry O'Regan)](https://www.sse.com/media/dmmjabmy/hy26-interim-results-presentation-transcript.pdf)

Executive talk · Martin Pibworth, Chief Executive · 2025-11-12

- Martin Pibworth's first presentation as Chief Executive: HY26 interim results plus a "transformational, fully funded" £33bn five-year investment plan to 2030 and a £2bn equity placing.
- Plan: 80% of the £33bn in Networks, RAV growing ~25% a year to around £40bn; Transmission investment ~£22bn (net of partner share), 30% CAGR in its asset base; Distribution ~10% RAV CAGR through ED3.
- Targets: adjusted EPS 225-250p by FY30 after the placing (7-9% CAGR from FY25's 160.9p); dividend growth of 5-10% a year to FY30; ~80% of earnings index-linked by FY30; ~£200m of annual recurring cost efficiencies by FY28.
- Funding: ~£39bn total cash requirement; around 90% self-funded; £14bn from rising net debt and hybrid capital; ~£2bn of asset rotations; £2bn equity placing (~10% of share capital); net debt/EBITDA below 4.5x.
- H1 FY26: adjusted operating profit £655m, adjusted EPS 36.1p, interim dividend 21.4p; around two thirds of earnings from regulated Networks; Transmission profits almost doubled.
- Renewables: 2.5GW under construction, Dogger Bank 88 of 95 turbines installed, ~1.5GW more projects to reach ~9GW by 2030; around £2bn of uncommitted capex with strict "value over volume" discipline.
- Capital allocation pivots from a historic 50:50 split between Networks and markets to 80:20.

## Questions about SSE plc

### What does SSE plc do?

SSE builds and operates electricity transmission and distribution networks, renewable generation (wind, hydro, batteries), flexible gas-fired generation and energy supply in the UK, Ireland and selected overseas markets.

### What is SSE's revenue?

Reported revenue was £10,186.5m in the year to 31 March 2026, with adjusted operating profit of £2,236.6m.

### How many employees does SSE have?

SSE had 15,197 direct employees, around 15,000 people, as of its 2026 annual report.

### What is SSE's strategy?

A fully-funded £33bn five-year investment plan to 2029/30, about 80% in regulated networks, targeting adjusted EPS of 225-250p in 2029/30 and ~9GW of renewables capacity.

### Who leads SSE?

Martin Pibworth is Chief Executive, Barry O'Regan is CFO and Sir John Manzoni is Chair.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_