> Stedin is a publicly owned Dutch electricity and gas grid operator serving about 5.6 million people, with €2,300 million of 2025 revenue.

## At a glance

Stedin Group builds, operates and maintains electricity and gas distribution networks in most of South Holland, Utrecht and Zeeland, an area with approximately 5.6 million people that includes the Rotterdam and Zeeland port and industrial areas. It is a semi-public company owned by 61 municipalities, two provinces and the State of the Netherlands; Rotterdam is the largest shareholder at approximately 27.9%, and its bonds are listed on Euronext Amsterdam. In FY2025 revenue was €2,300 million (+€252 million), operating profit €449 million and profit after tax €278 million. The workforce grew by 555 FTE to 6,787 FTE at the end of 2025.

## Business units

- **Stedin Netbeheer (regulated grid)** (€2,277 million of the group's €2,313 million total operating income in 2025): The regulated distribution system operator for electricity and gas, supervised by the ACM, which also facilitates the energy market in its area. It invested €1,244 million in 2025, added 573 MVA of capacity and laid 1,203 km of cables, with electricity supply reliability of 99.9956%.
- **Other segment (NetVerder, DNWG Infra, holding)** (1.1% of 2025 revenues (non-regulated activities)): Non-regulated activities, mainly NetVerder's heat and steam networks, plus the holding and financing company. NetVerder runs the geothermal Open Heat Network Delft and the Botlek Steam Network in Rotterdam, which is expected to supply LyondellBasell and Huntsman, likely in the second half of 2026.

## Strategic priorities

- **Build grid capacity faster**: Investment targets of €1,657 million for 2026 and €2,500-3,000 million by 2030, with added capacity rising from an 858 MVA target in 2026 to around 1,500 MVA a year by 2030.
- **Flexibility and congestion management**: Contracted effective flexible capacity reached 367 MW in H1 2026 against a 600 MW target for 2026 and 1,300-1,500 for 2030, using Congestion Service Providers, batteries and the Utrecht Flextender.
- **Neighbourhood approach**: Approximately 3,000 neighbourhoods are to be reinforced by 2050, with capacity being built to upgrade more than 200 neighbourhoods a year.
- **Digitalisation and AI for productivity**: 41% of medium-voltage substations were digitally metered in H1 2026 (target 56% for 2026, over 80% ultimately), and the H1 2026 strategy update adds targeted digitalisation and AI to raise productivity.
- **Modular, prefabricated construction**: Plug-and-play, prefabricated building becomes the standard approach, alongside standard transformer types and a plug-in medium-voltage cable connection that takes one day instead of two.
- **Resilience**: A Resilience Strategy and Implementation Agenda since 1 April 2026, diversified supply chains and analogue back-ups against cyber or physical threats.

## Latest results

In H1 2026 investments rose to €710 million from €610 million, but only 107 MVA of capacity was added against an 858 MVA full-year target, as 460 MVA from two new substations and one expansion slipped to the second half. Operating income was €1,168 million (+€14 million), operating profit €239 million (H1 2025: €249 million) and profit after tax €148 million, with personnel costs up €50 million. Free cash flow was negative €325 million, FFO/Net Debt fell to 11.9% and solvency rose to 44.8%. A temporary connection freeze applies in part of Utrecht from 1 July 2026, and households may join a waiting list for the first time.

## Investments and deals

- **Record grid investment**: €1,294 million invested in 2025 (2024: €1,096 million), and over €2.4 billion planned in South Holland over the next three years.
- **Large supply contracts**: A long-term contract with five suppliers for 293 power transformers in eight standard types, and a €3.5 billion tender awarded to 12 contractors for neighbourhood grids, with work started in April 2026.
- **Vianen distribution centre**: A 34,000 m2 distribution centre in Vianen to support buying and delivering materials at scale.
- **Green financing**: A €500 million green subordinated perpetual bond (4.25%) and a seventh €500 million green senior bond (3.625%) in 2026, an RCF raised to €1.5 billion and an EIB facility raised to €750 million.
- **Heat networks**: NetVerder built almost eight kilometres of the Delft Heat Network and acquired an Eneco heating network in Delft; targets are 3,600 heat household equivalents for 2026 and 30,000-34,000 for 2030.

## Challenges and risks

- **Worsening grid congestion**: The demand-side waiting list grew by almost 800 applications in 2025; in Utrecht no new high-volume consumers can be connected except congestion relievers, and relief depends on TenneT expansions in 2033-2035.
- **Negative free cash flow and equity need**: Free cash flow was negative €484 million in 2025 and is expected to stay negative; Stedin expects to need to strengthen its equity and is in discussions with its shareholders.
- **Technician shortage**: The CEO said Stedin has only a third of the technicians needed for the planned grid expansion, and hires hundreds of people every month.
- **Delivery delays**: Capacity additions lagged targets in 2025 (573 MVA versus 753 MVA) and H1 2026 because substation projects slipped; nitrogen regulation and land positions can cause further delays.
- **Cyber risk and affordability**: Information security and cyber resilience risk was assessed higher in 2025, and rising grid tariffs put societal affordability of energy under pressure.

## What leadership says

> "We currently have only a third of the number of technicians needed to get the planned grid expansion on track." — Trudy Onland, CEO, Management Scope interview, 24 June 2025

> "Before investing tens of millions in network upgrades, we will first examine whether smart storage can be used to absorb peak loads. This would give us a few years of breathing space." — Trudy Onland, CEO, Management Scope interview, 24 June 2025

> "We are also increasing our productivity and capacity so that we can do more." — Jaap Verhoeff, CFO, Stedin Group Annual Report 2025, 3 March 2026

> "We also aim to scale innovations: first testing them on a small scale and then rolling out successful solutions more widely." — Aline Arends, COO, Stedin Group Annual Report 2025, 3 March 2026


## Where a supplier can help

- **Labour-saving tools and prefab**: The technician shortage and the shift to modular, prefabricated construction favour suppliers of prefabricated substations, plug-in components and tools that cut field hours.
- **Flexibility and storage**: The 600 MW flexible-capacity target for 2026 and the CEO's plan to test smart storage before upgrades open room for battery operators, Congestion Service Providers and energy-management software.
- **Grid digitalisation and AI**: Digitally metering over 80% of MV substations and using AI for productivity call for sensors, data platforms and analytics partners.
- **Cybersecurity and resilience**: The higher-rated cyber risk and the new Resilience Strategy point to security, supply-chain diversification and continuity services.
- **Recruitment and training**: Hiring hundreds of people a month, training status holders and a new training centre in Rotterdam create demand for recruitment, onboarding and technical training providers.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Stedin Group Annual Report 2025](https://jaarverslag.stedingroep.nl/2025/assets/downloadables/StedinGroupAnnualReport2025.pdf)

Annual report · 2026-03-03

- Stedin Group is a Dutch semi-public distribution system operator (electricity and gas) owned by 61 municipalities, two provinces and the State of the Netherlands; the municipality of Rotterdam is the largest shareholder (approximately 27.9%). It serves most of South Holland, Utrecht and Zeeland, an area with approximately 5.6 million people.
- FY2025: total operating income €2,313 million (revenue €2,300 million, +€252 million), operating profit €449 million (+€143 million), profit after tax €278 million (2024: €158 million). Non-regulated activities contributed 1.1% of revenues.
- Record investments of €1,294 million (2024: €1,096 million); targets €1,657 million for 2026 and €2,500-3,000 million by 2030. 573 MVA of capacity added versus a 753 MVA target, because two transport substations (280 MVA) slipped to early 2026.
- Grid congestion keeps worsening: the demand-side waiting list grew by almost 800 applications (over 450 MW combined), feed-in requests stable at approximately 600 (285 MW). Utrecht relief now depends on TenneT expansions in 2033-2035; Stedin will invest over €2.4 billion in South Holland over the next three years.
- Flexibility is the second lever: 279 MW of contracted effective flexible capacity (target 500 MW; 2030 target 1,500), four framework agreements with Congestion Service Providers (potential 180 MW), the Utrecht Flextender (57 MW of gas-fired generators from autumn 2026) and a first mandatory congestion-management requirement for customers with 3 MW or more of flexible capacity.
- Buying at scale: a long-term contract with five suppliers for 293 power transformers, external capacity for HV substations, smart meters, DA3 boxes and the neighbourhood approach (approximately 3,000 neighbourhoods to reinforce by 2050), and a 34,000 m2 distribution centre in Vianen.
- Workforce grew by 555 FTE to 6,787 FTE; eNPS 30.0; LTIR 0.9. New board since 2025: CEO Trudy Onland, CFO Jaap Verhoeff, COO Aline Arends, CTO Timo Idema.
- Funding: two €500 million green bonds, a new €500 million EIB facility (€250 million drawn), A- rating with stable outlook, FFO/Net Debt 13.7%, solvency 40.6%. Free cash flow was negative at €484 million and is expected to stay negative, so Stedin expects to need to strengthen its equity and is in discussions with its shareholders.
- From 2027 a cost-based regulatory framework replaces benchmark regulation (ACM final method published 16 February 2026); the Energy Act took effect on 1 January 2026.

### [Stedin Group Half-year report 2026](https://www.stedin.net/-/media/project/groep/files/half-year-report-stedin-group-2026.pdf)

Interim report · 2026-07-23

- H1 2026 investments rose to €710 million (H1 2025: €610 million, about 16% more), but Stedin remains behind its half-year targets: only 107 MVA of capacity added (H1 2025: 269 MVA) against an 858 MVA full-year target, as two new substations and one expansion slipped (460 MVA postponed to H2 2026).
- Operating income €1,168 million (+€14 million); operating profit €239 million (H1 2025: €249 million); profit after tax €148 million (H1 2025: €159 million). Personnel expenses +€50 million; network loss costs -€23 million.
- Free cash flow negative €325 million (H1 2025: -€229 million). Funding: €500 million green subordinated perpetual bond (4.25%, January), seventh €500 million green senior bond (3.625%, May; €3.5 billion green senior bonds outstanding), RCF raised from €800 million to €1.5 billion (to April 2031), EIB facility raised to €750 million.
- FFO/Net Debt 11.9% (year-end 2025: 13.7%), solvency 44.8% (40.6%), S&P A- stable. Stedin held exploratory discussions with shareholders on strengthening equity, to be developed in H2 2026.
- Contracted effective flexible capacity rose by around 88 MW to 367 MW (full-year target 600 MW); 41% of MV substations digitally metered (more than 4,300 DA boxes).
- Temporary connection freeze in part of Utrecht from 1 July 2026; for the first time households may join a waiting list. Largest-ever tender (€3.5 billion) awarded to 12 contractors for neighbourhood grids.
- Strategy sharpened with three additions (resilience, design, rethinking through research and innovation), three refinements (connecting as many customers as possible, market flexibility, prefab and modular construction) and digitalisation and AI for productivity.
- From 2027 a cost-based regulatory methodology replaces yardstick regulation (ACM final method decisions February 2026, period 2027-2031).

### [Trudy Onland (Stedin): 'Accelerating with tomorrow's technology'](https://managementscope.nl/en/interview/trudy-onland-stedin-energy-system-sustainability)

Executive talk · Trudy Onland, CEO · 2025-06-24

- First press interview of Trudy Onland as CEO of Stedin (since early May 2025, previously COO), with Janine Tjassens of CGI, published in Management Scope 06 2025.
- Goal: take "major, concrete steps" towards a new sustainable energy system; the sector is at the end of one S-curve and moving to the next.
- Labour is the binding constraint: Stedin has "only a third of the number of technicians needed" for the planned grid expansion and hires hundreds of people every month; the answer is less labour-intensive work, e.g. the pluggable cable connection.
- Technology bets: storage in the network to defer upgrades, data from distribution stations to regulate grid traffic, AI; "not to get stuck in yesterday's technology".
- Before investing tens of millions in upgrades, Stedin will first test whether smart decentralised storage can absorb peaks, buying "a few years of breathing space".
- Resilience: diversifying supply chains and keeping analogue back-ups because some critical components come from countries "not always well disposed towards us".
- Regulation dates from the fossil era but the ACM is willing to experiment; she wants more leeway for companies that are flexible about when they use energy.
- Sector collaboration through Netbeheer Nederland so public money is not spent three times; Stedin leads basic knowledge and language training for status holders for the whole sector.

### [Interview Trudy Onland en Coen de Ruiter (SER Topvrouwen jubilee magazine)](https://www.ser.nl/nl/thema/topvrouwen/best-practices/interviews/2025/trudy-en-coen)

Executive talk · Trudy Onland, CEO

- Joint interview (in Dutch) of Stedin CEO Trudy Onland and Greenchoice CEO Coen de Ruiter for the 10-year jubilee magazine of SER Topvrouwen (2025), on diversity, inclusion and the energy transition; quotes below are translations.
- Onland calls the energy transition Stedin's most important societal assignment for now, while safe infrastructure stays just as important (e.g. a September explosion in a Den Haag flat).
- The hard choices are now about heat, hydrogen, batteries, perhaps nuclear energy, which industry stays in the Netherlands and how to finance the transition; politics should set more long-term lines and companies should form coalitions.
- Stedin is still a utility formed from many municipal grid operators; its culture of rapid safety response can work against changing course, so it needs many different people to ask different questions.
- Board is gender-balanced; Stedin's sub-top is 36% women with a 50% target for 2030; of the directors responsible for large construction programmes, two are men and two women.
- 400 of Stedin's 6,000 people are in its neurodiversity network; cultural and social diversity still lags.
- Practices: a quiz to open conversations on hurtful jokes, 50-50 intake in leadership pipelines, annual Nyenrode places for people of different backgrounds; customers increasingly ask about gender balance.

## Questions about Stedin

### What does Stedin do?

Stedin builds, operates and maintains electricity and gas distribution networks in most of South Holland, Utrecht and Zeeland, serving an area of approximately 5.6 million people. Through NetVerder it also develops heat and steam networks.

### Who owns Stedin?

Stedin is owned by 61 Dutch municipalities, two provinces and the State of the Netherlands; the municipality of Rotterdam is the largest shareholder with approximately 27.9%.

### What was Stedin's revenue in 2025?

Revenue was €2,300 million in 2025, with operating profit of €449 million and profit after tax of €278 million.

### How many employees does Stedin have?

Stedin had 6,787 FTE at the end of 2025 and 7,109 FTE in H1 2026.

### Who leads Stedin?

Trudy Onland has been CEO since 1 May 2025, with CFO Jaap Verhoeff, COO Aline Arends and CTO Timo Idema.