# TenneT account plan

> TenneT is the Dutch state-owned electricity transmission operator for the Netherlands and much of Germany, with EUR 9,101 million of 2025 underlying revenue.

## At a glance

TenneT Holding B.V. is a transmission system operator wholly owned by the Dutch state, running the high-voltage grid in the Netherlands (110 kV and higher) and a large part of Germany (220 kV and higher). It operates over 26,000 km of high-voltage connections, 481 substations, 17 interconnectors and 22 offshore connections with 14.7 GW of installed offshore capacity, serving over 43 million end-users. In FY2025 underlying revenue was EUR 9,101 million and underlying EBIT EUR 2,746 million, with 10,836 colleagues (9,562 employees). Revenue is mostly regulated by ACM in the Netherlands and BNetzA in Germany. TenneT Germany was deconsolidated on 30 June 2026 after outside investors and KfW took stakes; the Holding keeps 28.9% of votes and an 81.1% economic stake.

## Business units

- **TSO Netherlands (TenneT Netherlands)** (about 31% of FY2025 segment revenue (computed); 36% of underlying EBIT): The sole Dutch TSO, with underlying EBIT of EUR 992 million and investments of EUR 4,869 million in FY2025, and 3,933 employees. It completed its 700 MW offshore program and is moving to the 2 GW standard, while around 1,000 onshore projects sit in its Investment Plans. Frans Everts becomes CEO from 1 November 2026, succeeding Manon van Beek; Dieuwert Inia is CFO.
- **TSO Germany (TenneT Germany)** (about 68% of FY2025 segment revenue (computed); 58% of underlying EBIT): One of four German TSOs, connecting the wind-rich north with load centres in the south, with underlying EBIT of EUR 1,588 million and investments of EUR 9,948 million in FY2025, and 5,629 employees. It is building SuedLink and SuedOstLink and has almost 10 GW of offshore capacity in the German North Sea. Led by CEO Tim Meyerjürgens; deconsolidated on 30 June 2026 and now an associate of the Holding.
- **Non-regulated activities** (about 1% of FY2025 segment revenue (computed); 6% of underlying EBIT): Companies ancillary to the core task, including TenneT Reinsurance, CEVON (previously NOVEC), Duvekot Rentmeesters and Relined. FY2025 EBIT of EUR 166 million included a EUR 133 million gain on the NOVEC sale.

## Strategic priorities

- **Build the grid faster**: Standardised designs and the 2GW Program, a replicable 2 GW HVDC platform with 525 kV cable, are meant to more than triple offshore grid capacity in the Netherlands and Germany to 40 GW by 2032. SuedLink and SuedOstLink are fully permitted and under construction.
- **Use the existing grid better**: Flexibility products such as Time-Dependent Transmission Rights, with 50 to 65% tariff discounts, could unlock up to 9.1 GW off-peak; Dynamic Line Rating runs on 20 connections.
- **Dutch Acceleration Package**: With over 30 measures and over 100 congestion projects, the package with the ministry aims to cut lead times by up to 50%, with full effect expected by 2028, as about 60% of Dutch grid projects are expected 2.5 years late.
- **German investment agenda**: TenneT Germany plans EUR 65 billion of investment over 2025-2029, about EUR 13 billion a year, roughly half offshore and half onshore, growing its asset base to more than EUR 85 billion in 2029.
- **Organisational transformation**: A target operating model moving from functional to end-to-end working is being implemented in 2026, with emphasis on data, technology and AI.

## Latest results

In H1 2026 underlying revenue was EUR 5,173 million against EUR 4,409 million in H1 2025, and underlying EBIT EUR 6,337 million, inflated by a EUR 4.6 billion gain on the deconsolidation of TenneT Germany; IFRS EBIT was EUR 2,950 million. TSO Netherlands EBIT rose to EUR 579 million from EUR 447 million. Investments reached EUR 6,023 million (H1 2025: EUR 5,504 million), but full-year 2026 investments are expected below plan as 2GW Program offshore spend shifts to 2027 after the move from Petrofac to Larsen & Toubro. Adjusted FFO/net debt was 7.3% and adjusted ROIC 6.4%.

## Investments and deals

- **Record grid investment**: FY2025 grid investments were EUR 14.8 billion (NL EUR 4.9 billion, DE EUR 9.9 billion), up from EUR 10.6 billion but below the EUR 18.0 billion target.
- **Equity for TenneT Germany**: APG, GIC and NBIM committed up to EUR 9.5 billion for 46% of voting rights (closed 30 June 2026, EUR 2.5 billion initial contribution), and KfW bought 25.1% for EUR 3.3 billion on 3 July 2026.
- **2GW Program supply framework**: The 15-year framework committed EUR 50 billion to the market for 14 converter systems, eight for the Netherlands and six for Germany; Larsen & Toubro joins Hitachi Energy after Petrofac was partially terminated in October 2025.
- **Funding reset**: TenneT Netherlands holds the state-guaranteed senior debt and issued its first EUR 2.0 billion green bond (10-year, 3.25%) in March 2026; TenneT Germany has a EUR 12 billion RCF and a EUR 35 billion Debt Issuance Programme.
- **Cross-border links**: A Joint Development Agreement with National Grid covers LionLink (up to 2 GW, early 2030s), and TenneT Germany is exploring GriffinLink with National Grid.

## Challenges and risks

- **Permitting and project delays**: Onshore projects take 8 to 12 years, 70-80% of which is permitting; Dutch lines such as Utrecht-Noord slipped from 2029 to 2033.
- **Supplier scarcity and distress**: HVDC, transformers and cables come from few global players; Petrofac was partially terminated in October 2025 and Petrofac Norge B.V. was declared bankrupt on 8 June 2026, with claims pending both ways.
- **Regulatory returns**: ACM decided in February 2026 to move to cost-based regulation for 2027-2031, and BNetzA is redesigning the post-2029 German framework; Germany's fourth regulatory period cut the return on equity.
- **Grid congestion and connection backlog**: The Netherlands had 713 open connection requests and announced measures in Flevoland, Gelderland and Utrecht to prevent large-scale outages; TenneT Germany received 250 GW of battery connection requests.
- **Safety and security**: TRIR was 4.1 against a target of 3.1 in 2025, three subcontractor workers died in unrelated incidents in May 2026, and cyber and physical security are named operational risks.

## What leadership says

> "Slowing down is not an option: the costs of underinvesting in infrastructure outweigh the investments needed today." — Manon van Beek, CEO of TenneT Holding, TenneT Holding B.V. Integrated Annual Report 2025, 2026-03-09

> "Failing to invest, or investing too slowly, is simply not an option if we want to power societal and economic prosperity." — Dieuwert Inia, CFO, TenneT Holding B.V. Integrated Annual Report 2025, 2026-03-09

> "every euro that we are investing is reducing at least two euros on the ancillary side" — Tim Meyerjürgens, CEO of TenneT Germany, Cleaning Up podcast Ep233, 2025-11-12

> "a step towards becoming a modern, customer-oriented, data-driven TSO." — Maarten Abbenhuis, COO, TenneT Holding B.V. Integrated Annual Report 2025, 2026-03-09


## Where a supplier can help

- **Grid equipment and supply-chain capacity**: Tied to the supplier scarcity challenge and the 2GW Program: TenneT seeks long-term partners for HVDC, transformers and cables who can add capacity and deliver on time.
- **Construction and civil works for onshore projects**: Tied to the build-faster priority and project delays: with around 1,000 Dutch projects and German DC corridors, contractors that reduce lead times or replace failed contractors fit a stated need.
- **Flexibility and grid optimisation technology**: Tied to the use-the-grid-better priority: dynamic line rating, batteries and flexibility products are how TenneT frees capacity without new lines.
- **Data, AI and operating model support**: Tied to the 2026 organisational transformation toward end-to-end working with an emphasis on data, technology and AI, and to asset data quality risk.
- **Safety and security services**: Tied to the safety and security challenge: contractor safety, cyber and physical security of substations are named risks after the 2026 incidents.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [TenneT Holding B.V. Integrated Annual Report 2025](https://tennet-drupal.s3.eu-central-1.amazonaws.com/default/2026-03/Integrated%20Annual%20Report%20TenneT%20Holding%20B.V.%202025.pdf)

Annual report · 2026-03-09

- TenneT Holding B.V. is the Dutch state-owned transmission system operator (TSO) for the Netherlands and a large part of Germany: over 26,000 km of high-voltage connections, 481 substations, 17 interconnectors, 22 offshore connections and 14.7 GW of installed offshore capacity, serving over 43 million end-users; 10,836 colleagues (9,562 employees: 3,933 in the Netherlands, 5,629 in Germany, plus 1,274 externally contracted).
- FY2025 underlying revenue EUR 9,101 million (2024: EUR 8,430 million) and underlying EBIT EUR 2,746 million (2024: EUR 1,745 million); IFRS EBIT EUR 4,900 million. EBIT by segment: TSO Netherlands EUR 992 million, TSO Germany EUR 1,588 million, non-regulated EUR 166 million (incl. a EUR 133 million gain on the NOVEC sale).
- Record grid investments of EUR 14.8 billion (NL EUR 4.9 billion, DE EUR 9.9 billion), up from EUR 10.6 billion, but below the EUR 18.0 billion target because of offshore delays (Petrofac termination in the 2GW Program) and German DC onshore delays (archaeological finds, a terminated civil works contractor).
- Group split into two independent national companies from 1 January 2025. TenneT Germany is classified as held for sale: APG, GIC and NBIM committed up to EUR 9.5 billion of equity for up to 46.0%, and KfW agreed (3 February 2026) to buy 25.1% for about EUR 3.3 billion; Holding expects to lose control within one year.
- Funding reset: Dutch state guarantee for TenneT Netherlands B.V. (about EUR 38 billion of senior debt transferred to it), a EUR 12 billion RCF and a EUR 35 billion Debt Issuance Programme for TenneT Germany, which aims for at least BBB / Baa2.
- Strategy of building the grid faster, utilising it better and delivering together, toward the Target Grid 2045; offshore capacity to reach 40 GW by 2032 via the standardised 2 GW HVDC program; SuedLink and SuedOstLink fully permitted and under construction.
- Netherlands: around 1,000 grid expansion projects in the Investment Plans, but about 60% expected 2.5 years late; an Acceleration Package with the ministry aims to cut lead times by up to 50%. Time-Dependent Transmission Rights could unlock up to 9.1 GW off-peak.
- Key risks: permitting and social acceptance, supplier distress and scarcity (HVDC, transformers, cables), failed offshore wind tenders, regulatory returns (ACM move to cost-based regulation 2027-2031; BNetzA framework from 2029), affordability, cyber and physical security.
- CEO Manon van Beek: "Slowing down is not an option: the costs of underinvesting in infrastructure outweigh the investments needed today." A new CEO recruitment started in 2026 as her second term ends.

### [TenneT Holding B.V. Half-Year Report 2026](https://tennet-drupal.s3.eu-central-1.amazonaws.com/default/2026-07/Half-Year%20Report%20TenneT%20Holding%20BV%202026.pdf)

Interim report · 2026-07-24

- H1 2026 underlying revenue EUR 5,173 million (H1 2025: EUR 4,409 million); underlying EBIT EUR 6,337 million (H1 2025: EUR 1,467 million), inflated by a EUR 4.6 billion gain on the deconsolidation of TenneT Germany. IFRS EBIT EUR 2,950 million.
- TenneT Germany deconsolidated on 30 June 2026: APG, GIC and NBIM closed (EUR 2.5 billion initial contribution, 46% of voting rights), and KfW bought 25.1% for EUR 3.3 billion on 3 July; the Holding keeps 28.9% of votes and an 81.1% economic stake before later contributions, carried at EUR 10,744 million.
- Segment EBIT: TSO Netherlands EUR 579 million (H1 2025: EUR 447 million), TSO Germany EUR 5,739 million incl. the gain (EUR 870 million), non-regulated EUR 19 million (EUR 150 million, which included a EUR 133 million disposal gain).
- Investments EUR 6,023 million (H1 2025: EUR 5,504 million: NL EUR 2,145 million, DE EUR 3,875 million); full-year 2026 investments expected below plan as 2GW Program offshore spend shifts to 2027 after the move from Petrofac to Larsen & Toubro.
- Adjusted FFO/net debt 7.3% and adjusted ROIC 6.4%; first EUR 2.0 billion green bond of TenneT Netherlands (10-year, 3.25%), state-guaranteed; KfW proceeds repaid EUR 3.3 billion of the Dutch state shareholder loan, whose EUR 11.0 billion undrawn facility was terminated.
- Frans Everts (Shell Netherlands) appointed CEO from 1 November 2026, succeeding Manon van Beek; Anja Mutsaers chairs the Supervisory Board from 1 June 2026.
- Three subcontractor workers died in unrelated incidents in May; Petrofac Norge B.V. declared bankrupt on 8 June 2026, with claims pending both ways.

### [The EUR 65 Billion Plan to Modernise Germany's Grids | Cleaning Up Ep233: Tim Meyerjürgens](https://www.cleaningup.live/the-eur65-billion-plan-to-modernise-germanys-grids-ep233-tim-meyerjurgens/)

Podcast · Tim Meyerjürgens, CEO of TenneT Germany · 2025-11-12

- Tim Meyerjürgens, CEO of TenneT Germany, on Cleaning Up (November 2025), recorded in Berlin; the episode was supported by TenneT Germany.
- The split into TenneT Netherlands and TenneT Germany came because the Dutch state was "not willing to continue to provide equity for the German business"; after about two years of talks with the German state and KfW, TenneT ran a dual track (private placement and IPO, with investors in Frankfurt, London, New York and Boston).
- The Dutch finance minister chose the private route (APG, GIC, NBIM, EUR 9.5 billion) for transaction security.
- Investment agenda of EUR 65 billion for 2025-2029, about EUR 13 billion a year, roughly half offshore and half onshore; around EUR 10 billion a year expected after 2029.
- Financing: EUR 12 billion RCF, then raising roughly EUR 10 billion of debt a year from next year; targets a BBB+ rating; asset base to grow from around EUR 30 billion to more than EUR 85 billion in 2029, then equity self-funding.
- Grid investment pays back: "every euro that we are investing is reducing at least two euros on the ancillary side"; a 60 km line costing about EUR 1 billion saved EUR 500 million of redispatch in its first year.
- Permitting: lead times fell from 10-12 years to 5-8 under emergency rules; without permanent legislation they will go back up.
- 250 GW of battery connection requests in the transmission grid; he wants maturity-based connection criteria instead of first-come, first-served, and is sceptical about splitting Germany's price zone.
- The 2GW Program framework committed EUR 50 billion to the market for 14 converter systems (eight Netherlands, six Germany).

### [Manon van Beek (TenneT): 'De Noordzee kan de nieuwe energiecentrale van Europa worden'](https://www.change.inc/transities/energie-transitie/manon-van-beek-tennet-nederland-heeft-alles-in-huis-om-het-energieknooppunt-van-europa-te-worden)

Executive talk · Manon van Beek, CEO of TenneT Holding · 2025-06-16

- Manon van Beek, CEO of TenneT since 2018, in the Change Inc. "Horizon" CEO series (16 June 2025), in Dutch.
- Backs the wind sector's call for policy support: investors need "investment certainty", long-term vision, stable policy and clear frameworks (translated).
- Vision: the North Sea as "the new power plant of Europe", with room for 300 GW of wind; the Netherlands can become Europe's energy hub if it dares to choose.
- TenneT finished its 700 MW offshore connection phase on time and within budget; the 2 GW program is the new standard as the Netherlands targets 21 GW of offshore wind in 2032.
- Wants government to de-risk offshore wind (price guarantees, subsidies) and fast tailor-made deals with industry, which is half of energy use.
- Permitting: "ten years of talking and two years of building" is the problem; she would use emergency-style legislation for priority congestion projects (105 identified for the minister).
- Flexibility: the grid is only truly full 15 percent of the time; flexible companies could free much more room if flexibility pays.
- Leadership: her "Ten Commandments of the energy transition", from long-term vision to vulnerability; "zigzagging is fatal" for 30-50 year assets (translated).

## Questions about TenneT

### What does TenneT do?

TenneT is a transmission system operator that runs the high-voltage electricity grid in the Netherlands and a large part of Germany, balances supply and demand and connects offshore wind farms. It serves over 43 million end-users.

### What was TenneT's revenue in 2025?

FY2025 underlying revenue was EUR 9,101 million (2024: EUR 8,430 million) and underlying EBIT EUR 2,746 million. IFRS revenue was EUR 11,436 million.

### How many people work at TenneT?

At end-2025 TenneT had 10,836 colleagues: 9,562 employees (3,933 in the Netherlands and 5,629 in Germany) plus 1,274 externally contracted.

### Who owns TenneT?

TenneT Holding is wholly owned by the Dutch state. TenneT Germany was deconsolidated on 30 June 2026 after APG, GIC and NBIM took 46% of voting rights and KfW bought 25.1%; the Holding keeps 28.9% of votes.

### Who leads TenneT?

Manon van Beek has been CEO since 2018; Frans Everts succeeds her from 1 November 2026. Tim Meyerjürgens is CEO of TenneT Germany.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_