# Terna SpA account plan

> Terna owns and operates Italy's high-voltage National Transmission Grid as TSO, with €4,033.0m revenue and 7,117 employees in FY2025.

## At a glance

Terna owns and operates Italy's high- and very-high-voltage National Transmission Grid (NTG) and, as Transmission System Operator, handles transmission and real-time dispatching under a government concession regulated by ARERA. Alongside the regulated grid it runs Non-Regulated Activities: power transformers (Tamini), terrestrial cables (Brugg Cables), energy services (Altenia), fibre connectivity and private interconnectors. In FY2025 revenue was €4,033.0m (+9.6%), EBITDA €2,750.8m (+7.2%) and profit attributable to owners of the Parent €1,111.5m (+4.7%), with a workforce of 7,117 at end-2025. Terna has been listed since June 2004; CDP Reti S.p.A. holds 29.851% of the shares.

## Business units

- **Regulated Activities (Italy)** (about 81% of FY2025 group revenue (€3,278.6m)): Transmission and dispatching of the NTG, paid through the Transmission and Dispatching Fee set by ARERA on the RAB and a regulatory WACC of 5.5% for 2025-2027. FY2025 EBITDA was €2,611.2m and regulated capex €3,321.6m, led by the Tyrrhenian Link, Adriatic Link, SA.CO.I.3 and Elmed projects.
- **Non-Regulated Activities** (about 19% of FY2025 group revenue (€754.4m)): Run mainly through Terna Energy Solutions: equipment (Tamini transformers, Brugg Cables), services for third parties (fibre connectivity and Altenia energy services, including turnkey NTG connections for data centres in the Milan area) and private interconnectors. FY2025 EBITDA was €141.1m; 9M 2026 EBITDA rose 40% to EUR 142m.
- **International activities**: Residual Latin American assets; the 40% stake in BMT Energy Transmission Development was sold in 2025 and the Peruvian assets were sold in September 2026. The Group monitors the Mediterranean and Balkan areas.

## Strategic priorities

- **Deliver the 2024-2028 Industrial Plan**: The "Empowering Tomorrow" plan update totals €17.7bn of investment, €16.6bn in Regulated Activities in Italy, taking the RAB to about €32bn in 2028 (9% CAGR); around 94% of plan projects are under awarded contracts and 93% authorised.
- **Ten-year grid development**: The 2025 Development Plan foresees over €23bn of investment over 2025-2034, raising South-North transmission capacity from 16 GW to 39 GW; a new 10-year plan (2027-2036) is due in the first half of 2027.
- **Connecting renewables, storage and data centres**: Data centres have around 2 GW ready to build and 108 GW of connection requests; the first MACSE auction awarded 10 GWh of storage and a new one on 24 November will award up to 16 GWh.
- **Grow non-regulated businesses**: The plan targets ~€730m cumulative non-regulated EBITDA over the plan period; management pitches Tamini, Brugg and Altenia as an industrial platform open to small, selective M&A, with full-year 2026 EBITDA expected around EUR 180m.
- **Digital and grid security**: €2.4bn of the plan goes to digital technology; Terna invested more than EUR 600 million in digital transformation in 2025, and the Security Plan deploys synchronous condensers, reactors and stabilising resistors.
- **New industrial plan**: CEO Pasqualino Monti is preparing a new industrial plan to be shared in 2027, most likely in the second half, once ARERA's regulatory framework for 2028-2031 is defined.

## Latest results

For the first nine months of 2026, revenue was EUR 3.1 billion and EBITDA EUR 2.2 billion (+7%), with net income of EUR 857 million broadly stable (+4% excluding the energy-decree tax). Non-regulated revenue rose 22% to EUR 640 million and non-regulated EBITDA 40% to EUR 142 million. Capex rose 13% to EUR 2.4 billion, and net debt was EUR 12 billion at September, expected slightly below EUR 14 billion at year-end. In H1 2026 revenue was €2,113.6m (+11.6%) and EBITDA €1,467.0m (+7.9%). 2026 guidance is confirmed: revenue €4.41bn, EBITDA €2.93bn, net profit €1.12bn and capex around €4.2bn.

## Investments and deals

- **Tyrrhenian Link**: Campania-Sicily-Sardinia HVDC submarine link: €823.8m of capex in 2025; cables laid at a record depth of 2,150 metres and marine works between Campania and Sicily completed in April 2026.
- **Interconnectors and HVDC projects**: Adriatic Link (with a €1.5bn financing package from EIB, Intesa Sanpaolo and SACE), SA.CO.I.3 and Elmed with Tunisia, where Hitachi Energy was awarded the converter stations.
- **Grid and services acquisitions**: Acquired Rete 2 S.r.l. from Acea's Areti in September 2025 (481 km of circuits in the Rome area) and STE Energy S.r.l. through Altenia in May 2025.
- **Green financing**: €750m green bond and first €750m European Green Bond in 2025, an €850m hybrid perpetual European Green Bond in January 2026, and the EMTN programme raised to €6bn.
- **Grid digitalisation**: DigiL IoT sensors installed on over 1,800 pylons, a private 5G network procured, and digital twins covering over 66% of operations.

## Challenges and risks

- **Regulatory return**: The 2027 WACC trigger is expected to cut allowed WACC by around 30 bps, and the 2028-2031 period will be set by end-2027.
- **Temporary IRAP increase**: The extra IRAP tax costs about EUR 40 million of 2026 net income, held H1 2026 profit growth to +0.6%.
- **Executing complex HVDC works**: Authorisations, local opposition and worksite safety on HVDC and Hypergrid projects are named operational risks.
- **Supplier capacity saturation**: European TSOs ramping up investment saturate supplier capacity, and geopolitical tensions may affect material costs indirectly.
- **Rising net debt**: Net debt rose €1,839.8m to €13,000.2m in 2025 after record capex, and free cash flow was -€996.6m.

## What leadership says

> "Solid execution in the development of our grid infrastructure is the main priority." — Pasqualino Monti, Chief Executive Officer and General Manager, First Half 2026 Results Conference Call, 29 July 2026

> "we are starting to work on the update of the industrial plan." — Pasqualino Monti, Chief Executive Officer and General Manager, First Half 2026 Results Conference Call, 29 July 2026

> "does not change the Terna risk profile" — Francesco Beccali, Chief Financial Officer, First Half 2026 Results Conference Call, 29 July 2026, on non-regulated activities

> "Deliver the plan, support system security and flexibility, maintain a sound financial balance, and create sustainable and predictable value." — Giuseppina Di Foggia, then Chief Executive Officer and General Manager, Full Year 2025 Results Conference Call, 26 March 2026


## Where a supplier can help

- **HVDC and substation supply chain**: With supplier capacity saturation named as a risk and capex guided at around €4.2bn for 2026, cable, converter, substation and installation suppliers with reserved capacity can help keep the Industrial Plan on schedule.
- **Data-centre grid connections**: 108 GW of data-centre connection requests and Altenia's turnkey NTG connections in the Milan area create demand for EPC partners, HV equipment and connection engineering.
- **Grid digital and security technology**: The €2.4bn digital budget, IoT sensors on pylons, private 5G and cyber-attack risk point to needs in sensors, network security, digital twins and AI tools.
- **Non-regulated industrial platform**: Growth at Tamini, Brugg and Altenia, plus openness to small selective M&A, opens doors for manufacturing inputs, EPC subcontracting and bolt-on targets.
- **Worksite safety and permitting**: Authorisation, local opposition and worksite safety risks on complex HVDC works fit permitting, stakeholder-engagement and safety-management services.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Terna Group 2025 Annual Report (Report on Operations, Consolidated Sustainability Statement and Financial Statements)](https://www.emarketstorage.it/sites/default/files/comunicati/2026-04/20260420_182440.pdf)

Annual report · 2026-04-20

- Terna owns and operates Italy's high- and very-high-voltage National Transmission Grid (NTG) as the country's TSO, under a government concession regulated by ARERA; it also runs Non-Regulated Activities (transformers via Tamini, terrestrial cables via Brugg Cables, energy services via Altenia, fibre connectivity, private interconnectors).
- FY2025: revenue €4,033.0m (+9.6%), EBITDA €2,750.8m (+7.2%), profit attributable to owners of the Parent €1,111.5m (+4.7%), net debt €13,000.2m; dividend €0.3962 per share.
- Capital expenditure hit a record €3,514.9m (+30.6%), of which €3,321.6m in regulated assets; Tyrrhenian Link alone €823.8m (including financial expenses). 99% of capex aligned with the EU Taxonomy.
- 2024-2028 Industrial Plan update ("Empowering Tomorrow"): €17.7bn of investment, €16.6bn in Regulated Activities in Italy; RAB to reach around €32bn in 2028 (9% CAGR). 2025 Development Plan: over €23bn over 2025-2034.
- Execution: around 92% of plan works authorised and around 88% covered by supplier contracts at December 2025; 38 NTG projects (~€927m) authorised in 2025.
- Non-Regulated Activities grew fast: revenue €754.4m (+29.2%), EBITDA €141.1m (+€33.3m), driven by Tamini and Brugg; plan targets ~€730m cumulative EBITDA over the plan period.
- Demand signals: 329 GW of renewable connection applications at end-2025, almost 80 GW of connection requests from data centres; first MACSE storage auction awarded 10 GWh with bids more than four times demand.
- 2026 guidance: revenue €4.41bn, EBITDA €2.93bn, net profit €1.12bn, capex around €4.2bn.
- Ratings upgraded in 2025 to A- (S&P) and Baa1 (Moody's); workforce 7,117 at end-2025 with more than 800 hires in the year.
- Key risks: regulatory and tariff reviews (WACC set at 5.5% for 2025-2027), execution and authorisation of complex HVDC works, supplier capacity saturation, extreme weather and cyber-attacks.

### [Terna Group 2026 Half-Year Report (six months ended 30 June 2026)](https://www.emarketstorage.it/sites/default/files/comunicati/2026-07/20260730_187519.pdf)

Interim report · 2026-07-30

- H1 2026 revenue €2,113.6m (+11.6%), EBITDA €1,467.0m (+7.9%), profit attributable to owners of the Parent €591.2m (+0.6%).
- Regulated Activities EBITDA €1,361.4m (+€59.9m), helped by higher output-based incentives (+€59.4m); Non-Regulated EBITDA €105.9m (+€47.0m).
- Non-Regulated revenue €450.5m (+50.1%): Energy Services revenue up about 235% (Altenia, STE Energy), Equipment €235.6m (Tamini and Brugg).
- Capex €1,581.0m (+19.8%), regulated €1,464.9m; Development Plan €881.0m, Tyrrhenian Link €380.3m.
- Net debt €12,625.9m, down €374.3m vs end-2025, helped by the €850m hybrid European Green Bond (January 2026).
- Governance change: Pasqualino Monti appointed CEO and Stefano Cuzzilla Chairman by the 12 May 2026 AGM.
- Binding agreement to sell Terna Peru to Engie for about $15m; data-centre NTG connection projects multiplying in the Milan area.
- 2026 guidance confirmed: revenue €4.41bn, EBITDA €2.93bn, net profit €1.12bn, capex about €4.2bn.

### [Terna Full Year 2025 Results Conference Call (transcript)](https://stockanalysis.com/quote/bit/TRN/transcripts/404320-q4-2025/)

Executive talk · Giuseppina Di Foggia, Chief Executive Officer and General Manager (until May 2026) · 2026-03-26

- Di Foggia (then CEO) called 2025 a year of on-track execution: capex up 31% to EUR 3.5bn, EBITDA up 7%, net income up 5%, ahead of guidance.
- Plan: EUR 17.7bn 2024-2028 (EUR 16.6bn regulated); 10-year development plan over EUR 23bn; South-North transmission capacity to rise from 16 GW to 39 GW once projects complete.
- About 92% of the plan authorised and 88% secured by procurement contracts; EUR 5.5bn of projects entered operation in 2023-2025.
- Data centres: around 80 GW of connection requests; expected to become a main driver of demand; grid planning being aligned.
- Storage: first MACSE auction awarded 10 GWh, more than four times oversubscribed; installed batteries rose to almost 18 GWh.
- 2026 guidance (CFO Beccali): revenue about EUR 4.41bn, EBITDA EUR 2.93bn, net income above EUR 1.12bn including about EUR 40m extra IRAP tax; capex EUR 4.2bn.
- Non-regulated: Tamini revenue +54%, Brugg +14%, energy services +50% to over EUR 260m.
- Middle East conflict seen as having no direct impact; regulatory framework protects against raw-material cost increases.

### [Terna First Half 2026 Results Conference Call (transcript)](https://stockanalysis.com/quote/bit/TRN/transcripts/549753-q2-2026/)

Executive talk · Pasqualino Monti, Chief Executive Officer and General Manager (with CFO Francesco Beccali) · 2026-07-29

- First results call of new CEO Pasqualino Monti: "Solid execution in the development of our grid infrastructure is the main priority."
- Monti announced work on a new industrial plan, to be shared in 2027 once ARERA's new regulatory framework is visible.
- H1 2026 (CFO Beccali): revenue up around 12% to EUR 2.1bn, EBITDA up 8% to around EUR 1.5bn, net income EUR 591m (+1%; +4% adjusted for IRAP).
- Capex EUR 1.6bn (+20%); about 92% of plan projects under awarded contracts and 93% authorised.
- Non-regulated EBITDA up around 81% to EUR 106m (24% margin); Beccali pitched these businesses as an industrial platform complementary to the grid, open to small, selective M&A.
- Net debt EUR 12.6bn after the EUR 850m green hybrid bond (orders above EUR 7bn); 2026 guidance fully confirmed.
- New 10-year development plan (2027-2036) to be presented in the first half of 2027.

### [Terna Nine Months 2026 Results Conference Call (transcript)](https://stockanalysis.com/quote/bit/TRN/transcripts/673364-q3-2026/)

Executive talk · Francesco Beccali, Chief Financial Officer · 2026-11-12

- 9M 2026 (CFO Beccali): high-single-digit growth in revenue and EBITDA; group revenue EUR 3.1bn, EBITDA EUR 2.2bn (+7%), net income EUR 857m, broadly stable (+4% excluding the energy-decree tax).
- Capex EUR 2.4bn (+13%), in line with the confirmed EUR 4.2bn full-year guidance; above 90% of the plan authorised and procured.
- Peru assets sold in September; interim dividend EUR 0.1192 per share, flat.
- Data centres: around 2 GW ready to build and 108 GW of connection requests; new Terna-Snam scenario sees demand reach 439 TWh by 2040 with 77% renewables.
- Non-regulated EBITDA up 40% to EUR 142m; full-year expected around EUR 180m.
- Regulation: 2027 WACC trigger expected to cut allowed WACC by around 30 bps; 2028 mark-to-market in the 5.4% area; new industrial plan most likely in H2 2027.
- Net debt EUR 12bn at September; full-year expected slightly below EUR 14bn; dividend policy (4% growth vs EUR 0.3962 floor) not seen at risk.

## Questions about Terna SpA

### What does Terna do?

Terna owns and operates Italy's high- and very-high-voltage National Transmission Grid and, as TSO, handles transmission and real-time dispatching under an ARERA-regulated concession. It also makes transformers and cables and provides energy services through its non-regulated businesses.

### What was Terna's revenue in 2025?

FY2025 revenue was €4,033.0m (+9.6%), with EBITDA of €2,750.8m and profit attributable to owners of the Parent of €1,111.5m. 2026 guidance is revenue of €4.41bn.

### How many employees does Terna have?

Terna had 7,117 employees at end-2025 and 7,260 at 30 June 2026.

### What is Terna's investment plan?

The 2024-2028 Industrial Plan update totals €17.7bn of investment, €16.6bn in regulated activities in Italy, and the 2025 Development Plan foresees over €23bn over 2025-2034.

### Who leads Terna?

Pasqualino Monti has been Chief Executive Officer since the 12 May 2026 AGM, with Stefano Cuzzilla as Chairman and Francesco Beccali as CFO.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_