# The AES Corporation account plan

> AES is a U.S.-based power generator and utility owner with a 34,740 MW portfolio, 2.7 million utility customers and FY2025 revenue of $12,233m.

## At a glance

The AES Corporation develops, owns and operates power plants and electric utilities. It owns and/or operates 34,740 MW of generation, 54% of it renewables, and six utility businesses serving 2.7 million customers in Indiana, Ohio and El Salvador, with plants across the Americas, Europe and Asia. Its strategy is to partner with large corporations, notably data center companies in the U.S. and mining companies outside it, under long-term PPAs. FY2025 revenue was $12,233m, Adjusted EBITDA $2,871m and net income attributable to AES $910m, with 8,336 employees. AES has agreed to be taken private by Horizon Parent (GIP and EQT Infrastructure VI) at $15.00 per share.

## Business units

- **Energy Infrastructure SBU** (about 44% of FY2025 revenue ($5,402m)): Natural gas, LNG, coal, pet coke and oil plants in nine countries (12,705 MW), including AES Southland in California and LNG hubs in the Dominican Republic and Panama. FY2025 Adjusted EBITDA fell 13% to $1,130m; led from 2 March 2026 by Juan Ignacio Rubiolo, also COO.
- **Utilities SBU** (about 34% of FY2025 revenue ($4,122m)): AES Indiana (about 533,000 customers), AES Ohio (about 541,000 customers) and four El Salvador distributors. Adjusted EBITDA rose 9% in FY2025 on higher retail rates; both U.S. utilities are signing data center load and running large investment programs.
- **Renewables SBU** (about 24% of FY2025 revenue ($2,913m)): Solar, wind, storage and hydro in ten countries (17,836 MW operating), led by AES Clean Energy in the U.S. with a 46 GW pipeline and customers such as Amazon, Microsoft and Google, plus Chile, Colombia and Panama. Adjusted EBITDA rose 52% to $932m in FY2025; led by Bernerd Da Santos.
- **New Energy Technologies SBU**: Investments in Fluence (energy storage), the Maximo solar installation robot, the AI Fund venture studio, Uplight and 5B; it posted negative Adjusted EBITDA in FY2025 on Fluence losses.

## Strategic priorities

- **Power for data centers**: AES had 8.2 GW signed with data centers by Q3 2025 and offers 24/7 carbon-free energy, storage, load siting and powered land through Develop-Transfer Agreements.
- **Build out the renewables backlog**: The 2025 backlog stood at 12.0 GW with 5.7 GW under construction; AES says the U.S. backlog is largely safe harbored for tax credits.
- **Grow regulated U.S. utilities**: AES Indiana expects about $4.2bn of capex in 2026-2028 and AES Ohio about $1.6bn, including transmission for data centers and coal-to-gas conversion at Petersburg in 2026.
- **Cost savings**: A restructuring program launched in February 2025 targets a $300 million annual run rate of savings in 2026.
- **Strengthen the balance sheet**: Management said the plan through 2027 is fully self-funded with no equity issuance, targeting Moody's FFO to net debt of 12% by end-2026.

## Latest results

In Q3 2026 (quarter ended 30 September), revenue rose to $3,872m from $3,351m and Adjusted EBITDA to $1,090m from $830m. Renewables Adjusted EBITDA reached $496m against $296m, helped by $182m of higher spot sales in Colombia during El Niño, and Utilities rose to $296m on higher AES Ohio rates. Over nine months, revenue was $10,474m and net income attributable to AES $1,466m against $590m. AES is awaiting completion of its take-private, with stockholder, HSR, PUCO and European Commission approvals obtained and an outside date of 1 June 2027.

## Investments and deals

- **Take-private by GIP and EQT**: Merger agreement of 1 March 2026 with Horizon Parent at $15.00 per share, an equity value of about $10.7bn.
- **Asset sales**: A minority stake in AGIC sold for $450m and about 30% of AES Ohio sold to CDPQ in 2025; Fluence units sold in May 2026 for net proceeds of $207m.
- **U.S. renewables construction**: AES Clean Energy's construction budget for projects under construction and contracted is over $12 billion, including the 2 GW Bellefield site built with the Maximo robot.
- **Utility investment program**: About $1.4 billion in 2025 across AES Indiana and AES Ohio for grid hardening, smart grid, new generation and data center transmission.

## Challenges and risks

- **Trade restrictions and supply chain**: Tariffs on Chinese batteries, Section 232 actions, polysilicon import measures and FEOC rules; AES says it has shifted most final products outside China.
- **U.S. tax credit changes**: The 2025 Act (H.R. 1) and Treasury guidance affect renewable tax credits; AES expects the vast majority of its backlog to keep qualifying.
- **Hydrology and weather**: Dry conditions in Panama, Colombia and Chile and an El Niño forecast into 2027, plus warm-winter risk for U.S. utility sales.
- **Emerging-market and regulatory exposure**: Argentina's market reform, PREPA's bankruptcy in Puerto Rico, and rate outcomes in Indiana and Ohio.
- **Leverage**: Total gross debt was $29.5bn at end-2025, with about $7.3bn at variable rates, and interest expense of $1,407m.

## What leadership says

> "the cost of a new gas turbine has more than doubled, and lead times have stretched to 4 years or more" — Andrés Gluski, Chief Executive Officer, Q2 2025 earnings call, 1 August 2025

> "we are doing fewer projects, larger projects" — Andrés Gluski, Chief Executive Officer, Q3 2025 earnings call, 5 November 2025

> "we feel our company has been undervalued, consistently undervalued" — Andrés Gluski, Chief Executive Officer, Q2 2025 earnings call, 1 August 2025

> "our top priority is continuing to strengthen our balance sheet" — Stephen Coughlin, EVP and CFO, Q3 2025 earnings call, 5 November 2025


## Where a supplier can help

- **Domestic equipment supply**: Tariffs and FEOC rules push AES toward U.S. or South Korean suppliers for panels, batteries and turbines for its renewables backlog.
- **Construction productivity**: Larger projects and an over $12 billion construction budget favor suppliers of construction automation, project controls and EPC services.
- **Utility grid modernization**: The AES Indiana and AES Ohio capex plans for grid hardening, smart grid and data center transmission open room for T&D equipment and software vendors.
- **Cost-saving programs**: The $300 million annual savings target supports procurement, outsourcing and automation offers that cut G&A.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [The AES Corporation Form 10-K for fiscal year 2025](https://www.sec.gov/Archives/edgar/data/874761/000087476126000063/aes-20251231.htm)

Annual report · 2026-03-02

- The AES Corporation (Arlington, Virginia) is a global power generator and utility owner with a 34,740 MW generation portfolio, organised into four technology SBUs: Renewables, Utilities, Energy Infrastructure and New Energy Technologies; 8,336 full-time employees at 31 Dec 2025.
- FY2025: revenue $12,233m (2024: $12,278m); net income $162m (2024: $802m); Adjusted EBITDA $2,871m (up from $2,639m); Adjusted EBITDA with Tax Attributes $4,411m; diluted EPS from continuing operations $1.31; Adjusted EPS $2.34 (2024: $2.14).
- Strategy: "partner with large corporations to deliver the electricity they need when they need it", above all renewables for data center companies in the U.S. and for large mining companies outside it; consistently rated by BNEF as one of the top two sellers of renewable power to corporates.
- 2025 delivery: 3.2 GW of solar, storage and wind completed; 4.0 GW of new long-term PPAs signed; backlog of 12.0 GW including 5.7 GW under construction. AES Clean Energy has a 46 GW U.S. development pipeline and a 7.6 GW backlog.
- U.S. utilities (AES Indiana, AES Ohio) are in "the most ambitious investment growth" in their history, with projected double-digit rate base growth through 2027; capex plans of $4.2bn (Indiana) and $1.6bn (Ohio) for 2026-2028; data center demand in their territories is an added opportunity.
- On 1 March 2026 AES agreed to be acquired by Horizon Parent, jointly controlled by Global Infrastructure Management (GIP) and EQT Infrastructure VI, for $15.00 per share in cash (equity value about $10.7bn), expected to close in late 2026 or early 2027.
- Leadership change effective 2 March 2026: Ricardo Falú becomes President, Andrés Gluski stays CEO, Juan Ignacio Rubiolo becomes EVP and COO and President of the Energy Infrastructure SBU.
- Risks: U.S. tariffs, AD/CVD and forced-labor rules on solar and battery supply, tax credit legislation, hydrology in Colombia, Panama and Chile, PREPA in Puerto Rico, Argentina's market reform; a $264m Maritza impairment as its PPA expires in May 2026.

### [The AES Corporation Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/874761/000087476126000156/aes-20260930.htm)

Interim report · 2026-11-03

- Q3 2026 (quarter to 30 Sep 2026, 10-Q filed 3 Nov 2026): revenue $3,872m (+16%), net income $527m (Q3 2025: $517m), Adjusted EBITDA $1,090m vs $830m.
- Nine months: revenue $10,474m (+15%), net income $1,189m vs $294m, Adjusted EBITDA $2,815m vs $2,102m, operating cash flow $3,447m (+22%).
- Renewables Q3 Adjusted EBITDA $496m (+68%), driven by El Niño-elevated spot prices in Colombia with good hydrology at Chivor, a stronger Colombian peso and U.S. development services.
- Utilities Q3 Adjusted EBITDA $296m (+23%) on AES Ohio's 2024 DRC Settlement rates and weather; Energy Infrastructure $322m (+7%) on Argentine spot prices and LNG, offset by the expiry of the Maritza PPA in Bulgaria.
- Take-private by GIP/EQT ($15.00 per share): stockholders approved on 26 June 2026; HSR expired; PUCO approved on 17 Sept 2026; EC cleared it on 15 Oct 2026; NY PSC needs no further review; other approvals still pending.
- AES sold Fluence shares in May 2026 (net proceeds $207m, $186m gain) and issued $1bn of senior notes in June 2026.
- Watch-points: new U.S. tariffs and a Section 232 minimum import price and 15% tariff on polysilicon and solar modules from 4 Dec 2026, a strong El Niño into 2027, a possibly warm Midwest winter, and Chile's tax cut to 23% by 2029.

### [AES Q3 2025 earnings call transcript](https://www.fool.com/earnings/call-transcripts/2025/11/05/the-aes-aes-q3-2025-earnings-call-transcript/)

Executive talk · Andrés Gluski, President and Chief Executive Officer · 2025-11-05

- Q3 2025 call (5 Nov 2025): Adjusted EBITDA $830m vs $698m, Adjusted EPS $0.75 vs $0.71; 2025 guidance reaffirmed ($2.65-2.85bn Adjusted EBITDA, $2.10-2.26 Adjusted EPS) with a 5% to 7% Adjusted EBITDA growth rate through 2027.
- Gluski: 2.2 GW of PPAs signed year to date, at least 1.8 GW more expected; 11.1 GW backlog with 4.8 GW under construction; renewables EBITDA up 46% year to date.
- Data centers: 8.2 GW signed with data centers, 4.2 GW in operation; first Develop-Transfer Agreement transferring a "powered land" data center site with an ongoing PPA.
- 7.5 GW U.S. backlog "entirely safe harbored", 4 GW more in the pipeline, 3-4 GW more to safe harbor before July 4, 2026, enabling tax-credit projects through 2030.
- Utilities: 2.1 GW of data center agreements at AES Ohio; AES Indiana negotiating deals Falú expects "more in the 1.5, 2.5 gigawatt range"; Ohio settlement with a ~$168m revenue increase.
- Coughlin: $300m annual cost-savings run rate in 2026, low-teens EBITDA growth in 2026, an extra $400m of run-rate EBITDA beyond 2027 from the backlog, "self-funded through 2027" and no equity plans; returns "at the higher end" of 12-15% on data center PPAs.

### [AES Q2 2025 earnings call transcript](https://www.fool.com/earnings/call-transcripts/2026/05/13/aes-aes-q2-2025-earnings-call-transcript/)

Executive talk · Andrés Gluski, President and Chief Executive Officer · 2025-08-01

- Q2 2025 call (1 Aug 2025): Adjusted EBITDA $681m, Adjusted EPS $0.51 (up 34% from $0.38); renewables Adjusted EBITDA $240m, up 56%; 2025 guidance and long-term growth targets reaffirmed.
- Gluski on the U.S. market: demand is "growing rapidly", and "the bulk of new additions over the next 5 years will be renewables and energy storage"; gas turbine costs have "more than doubled" with lead times of 4 years or more.
- 1.6 GW of new PPAs since the prior call, all with data center customers (including Meta); backlog 12 GW, of which 4.1 GW international and 7.9 GW U.S.; 6 GW of the U.S. backlog to be placed in service before end-2027.
- Policy resilience: safe harboring, a U.S.-based supply chain compliant with FEOC rules, and avoiding federal land; "over 11 gigawatts" of agreements signed with data center companies.
- Utilities: about $1.4bn of investment in 2025 across Indiana and Ohio; Pike County storage (200 MW / 800 MWh) completed; Petersburg coal-to-gas repowering due in 2026.
- On take-private rumours Gluski declined to comment but said the company has been "consistently undervalued"; AES calls itself "an all-of-the-above energy company" ready to build gas if customers ask.
- Coughlin: renewables growth of 19% to 21% and utilities 13% to 15% within the 5% to 7% EBITDA target; plan "fully self-funded" through 2027.

## Questions about The AES Corporation

### What does AES do?

AES develops, owns and operates power plants (34,740 MW, 54% renewables) and six electric utilities, selling mostly under long-term contracts to utilities, data center companies and mining companies.

### What was AES's revenue in 2025?

FY2025 revenue was $12,233m, with Adjusted EBITDA of $2,871m and net income attributable to AES of $910m.

### How many employees does AES have?

AES had 8,336 employees according to its FY2025 10-K.

### Who leads AES?

Andrés Gluski has been CEO since 2011; Ricardo Falú became President on 2 March 2026 and Stephen Coughlin is EVP and CFO.

### Is AES being acquired?

Yes. AES agreed on 1 March 2026 to be acquired by Horizon Parent, controlled by GIP and EQT Infrastructure VI, at $15.00 per share; completion awaits remaining approvals, with an outside date of 1 June 2027.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_
