# Tutor Perini Corporation account plan

> Tutor Perini is a US general contractor for large civil and building projects: FY2025 revenue $5.5 billion, backlog $20.4 billion, about 7,400 employees.

## At a glance

Tutor Perini Corporation (NYSE: TPC), headquartered in Los Angeles (Sylmar), California, provides general contracting, construction management and design-build services, focused on large, complex civil infrastructure and building projects. Government customers were 75% of 2025 revenue, and the company can self-perform electrical, mechanical, plumbing, HVAC and fire protection work through its own specialty businesses. FY2025 revenue was $5.5 billion (+28%), income from construction operations $232.0 million and operating cash flow a record $748.1 million. At December 31, 2025 it had approximately 7,400 employees, about 4,000 of them union employees; executive chairman Ronald N. Tutor and trusts he controls own approximately 12% of the shares.

## Business units

- **Civil** (about 51% of 2025 revenue ($2,846.8 million, computed); backlog $10.0 billion at September 30, 2026): Highways, bridges, tunnels, mass-transit systems, military facilities and water infrastructure, through units such as Black Construction in Guam, Frontier-Kemper, Lunda Construction and Becho. Q3 2026 revenue rose 16.0% to $893.5 million at a 14.0% margin, driven by Northeast and Indo-Pacific projects.
- **Building** (about 33% of 2025 revenue ($1,852.2 million, computed); backlog $7.2 billion at September 30, 2026): Healthcare, detention, hospitality and gaming, government and education buildings through Rudolph and Sletten, Tutor Perini Building Corp., Roy Anderson Corp. and Perini Management Services. Q3 2026 revenue rose 29.1% to $540.5 million at a 5.0% margin, led by New York detention facilities and California healthcare.
- **Specialty Contractors** (about 15% of 2025 revenue ($844.0 million, computed); backlog $3.2 billion at September 30, 2026): Electrical, mechanical, plumbing, HVAC and fire protection systems through Five Star Electric, Fisk Electric, WDF, Nagelbush and Desert Mechanical; approximately two-thirds of backlog is work for the Civil and Building segments. Q3 2026 revenue rose 26.4% to $286.2 million at a 3.5% margin.

## Strategic priorities

- **Selective bidding on large projects**: Bid conservatively on large, complex fixed-price projects where competition is limited; backlog includes nine mega projects totalling $16 billion.
- **Segment margin targets**: Civil at 12%-15% (running at 14%), Building at 3%-6% and Specialty Contractors at 5%-8% to be reached sometime in 2027.
- **Convert a $200 billion pipeline**: The pipeline of potential projects over the next three to four years exceeds $200 billion, including Sepulveda Transit Corridor, Southeast Gateway, Hudson Tunnel and Newark Terminal B.
- **Indo-Pacific growth**: Black Construction is pursuing more than $4.6 billion of federal work across Guam, Palau, Yap, Wake Island and Tinian, backed by the Pacific Deterrence Initiative.
- **Bid sole-source rather than in joint ventures**: With $1.1 billion of cash, the company intends to bid alone where possible and keep margin in-house.

## Latest results

In Q3 2026 revenue reached a record $1.7 billion (+21.5%) and income from construction operations a record $125.4 million (+212.8%), helped by lower share-based compensation. Adjusted diluted EPS was $1.83 against $1.15, while GAAP EPS was $0.39 after a $51.4 million loss on debt extinguishment and a $33.8 million pension settlement charge. Nine-month revenue was $4.7 billion (+17.6%) and operating cash flow a record $665.1 million. Backlog stood at $20.4 billion after $2.2 billion of Q3 awards. 2026 adjusted EPS guidance was raised to $5.90-$6.10 from $5.15-$5.45, and management expects double-digit revenue and earnings growth in 2027.

## Investments and deals

- **Debt refinancing**: On July 2, 2026 the company issued $400.0 million of 6.625% Senior Notes due 2033 to replace the 11.875% notes, with expected annualized cash interest savings of $21.0 million; the revolver was raised to $350.0 million.
- **Equipment capex**: Capex was $180.9 million in 2025, mostly owner-funded equipment on newer projects; 2026 capex is guided at $125-$135 million.
- **Capital returns**: A first $0.06 quarterly dividend and a $200 million share repurchase program started in November 2025; share repurchases reached $30.0 million in nine months of 2026.

## Challenges and risks

- **Fixed-price estimating risk**: 79% of backlog is fixed price, exposing the company to cost overruns, liquidated damages and unapproved change orders.
- **Legal disputes**: An unfavorable ruling assessed approximately $175 million of damages on the W Element Hotel dispute in Philadelphia, which the company is appealing; 2025 results absorbed $61.8 million of settlements.
- **Slower new awards**: Nine-month 2026 awards were $4.5 billion against $7.0 billion a year earlier, and backlog was down 6% year on year.
- **Federal funding uncertainty**: The Bipartisan Infrastructure Law funding window closed September 30, 2026 and a reauthorization bill is pending; guidance assumes no additional federal funding.
- **Specialty margins below target**: Legacy settlements keep Specialty Contractors below its 5%-8% target range.

## What leadership says

> "probably the highest level of certainty that I had seen in backlog in my career" — Gary Smalley, CEO and President, Q3 2026 earnings call, 5 November 2026

> "If we did not book any more work, 2027 is going to be a blowout year, as is 2026." — Gary G. Smalley, CEO and President, Q1 2026 earnings call, 6 May 2026

> "Data centers is not going to be a focus for us." — Gary Smalley, CEO and President, Q3 2026 earnings call, 5 November 2026

> "We do not see new competitors entering the market right now" — Gary G. Smalley, CEO and President, Q1 2026 earnings call, 6 May 2026


## Where a supplier can help

- **Estimating and project controls**: Tied to the fixed-price estimating risk and the selective bidding priority: estimating, scheduling and cost-control tools protect margins on mega projects.
- **Claims and contract management**: Tied to the legal disputes challenge: document control, change-order tracking and claims-support services reduce exposure on long projects.
- **Specialty trades productivity**: Tied to the Specialty margin target: prefabrication, field productivity and workforce tools help lift Specialty Contractors toward 5%-8%.
- **Equipment and logistics in the Indo-Pacific**: Tied to the Indo-Pacific growth priority and equipment capex: equipment, marine logistics and remote-site services support Black Construction's federal work.
- **Business development for mega project pursuits**: Tied to the $200 billion pipeline priority: bid-management and market intelligence tools help track and win large transit, bridge and airport pursuits.

_Tamtam's reading of the priorities and challenges above, not the company's own words._

## Key documents

### [Form 10-K for fiscal year 2025](https://www.sec.gov/Archives/edgar/data/77543/000007754326000028/tpc-20251231.htm)

Annual report · 2026-02-26

- Tutor Perini is a US general contractor (formed by the 2008 merger of Tutor-Saliba and Perini, legacy dating to 1894), headquartered in Los Angeles (Sylmar) and listed on the NYSE as TPC; it worked on approximately 1,600 construction projects in 2025.
- FY2025 revenue was $5.5 billion, up 28% from $4.3 billion, with strong growth in all three segments (Civil, Building, Specialty Contractors), driven by newer, larger, higher-margin projects still in early stages.
- Income from construction operations was $232.0 million versus a loss of $103.8 million in 2024; diluted EPS $1.51 (vs. a $3.13 loss); adjusted diluted EPS $4.29, excluding $150.0 million of share-based compensation expense.
- Record operating cash flow of $748.1 million (fourth consecutive record year); the remaining $121.9 million Term Loan B was voluntarily prepaid; cash and equivalents of $734.6 million at year-end.
- Backlog reached $20.6 billion (up 10%): Civil 49%, Building 36%, Specialty Contractors 15%; about $6 billion (approximately 29%) is expected to convert to revenue in 2026. New awards were $7.4 billion vs. $12.8 billion in 2024.
- Customers are mostly public: government customers were 75% of 2025 revenue; backlog is 78% state and local agencies, 14% private owners, 8% federal agencies, and 79% fixed price.
- Key 2025 wins: the $1.87 billion Midtown Bus Terminal Replacement - Phase 1 and the $1.18 billion Manhattan Tunnel in New York, plus California healthcare projects (one valued at approximately $1 billion, another at $538 million).
- Outlook: management expects revenue growth to remain highly favorable on large, long-duration awards, a multi-billion-dollar California healthcare project to be added incrementally over two to three years, and continued limited competition for large fixed-price civil work.
- Capital returns started in November 2025: a first $0.06 quarterly dividend and a $200 million share repurchase program. Executive chairman Ronald N. Tutor and trusts he controls own approximately 12% of the shares.

### [Form 10-Q for the quarter ended September 30, 2026](https://www.sec.gov/Archives/edgar/data/77543/000007754326000220/tpc-20260930.htm)

Interim report · 2026-11-04

- Q3 2026 revenue was a record $1.7 billion (up 21.5%); nine-month revenue $4.7 billion (up 17.6%). All three segments grew double digits.
- Q3 income from construction operations was a record $125.4 million (up 212.8%); nine months $302.3 million (up 66.3%), helped by a $39.5 million drop in Q3 share-based compensation.
- Q3 diluted EPS $0.39 and adjusted diluted EPS $1.83 (vs. $1.15); nine-month adjusted diluted EPS $4.59 (vs. $3.22).
- Segment Q3: Civil revenue $893.5 million at a 14.0% margin; Building $540.5 million at 5.0%; Specialty Contractors $286.2 million at 3.5%.
- Backlog $20.4 billion at September 30, 2026 (49% Civil, 35% Building, 16% Specialty), up from $19.9 billion at June 30; Q3 new awards $2.2 billion, nine months $4.5 billion (vs. $7.0 billion).
- July 2, 2026 refinancing: $400.0 million 6.625% Senior Notes due 2033 replaced the 11.875% notes, with expected annualized cash interest savings of $21.0 million; a $51.4 million loss on extinguishment and a $33.8 million pension settlement charge were booked in Q3.
- Record nine-month operating cash flow of $665.1 million; cash $1.1 billion, $504.2 million available for general corporate purposes; revolver now $350.0 million and unused.
- Pipeline of potential projects over the next three to four years exceeds $200 billion, about three times larger than a couple of years ago; a significant number of large opportunities are expected to bid in 2027.

### [Q3 2026 earnings call transcript](https://www.fool.com/earnings/call-transcripts/2026/11/05/tutor-perini-tpc-q3-2026-earnings-call-transcript/)

Executive talk · Gary Smalley, CEO and President · 2026-11-05

- CEO Gary Smalley called Q3 2026 the seventh consecutive quarter of outstanding results: record revenue of $1.7 billion (up 22%), record operating income of $125 million and record quarterly operating cash flow of $331 million.
- 2026 adjusted EPS guidance raised to $5.90-$6.10 from $5.15-$5.45; double-digit revenue and earnings growth expected in 2027, with no additional federal funding assumed.
- More than three quarters of 2027 revenue is already in backlog; Smalley said 2026 was "probably the highest level of certainty that I had seen in backlog in my career".
- Backlog of $20.4 billion includes nine mega projects totalling $16 billion; Q3 awards of $2.2 billion, a book-to-burn of 1.3x.
- Pipeline of more than $200 billion over three to four years, including Sepulveda Transit Corridor (approximately $12 billion), Southeast Gateway ($4 billion), Hudson Tunnel ($3 billion), Newark Terminal B ($3 billion) and Indo-Pacific pursuits over $4.6 billion via Black Construction.
- Margin targets: Civil 12%-15% (running at 14%, with "upward pressure"), Building 3%-6%, Specialty Contractors 5%-8% to be reached sometime in 2027.
- Data centers are 0.2% of backlog and "not going to be a focus"; the company prefers to bid sole-source rather than in joint ventures, backed by $1.1 billion of cash.
- CFO Ryan Soroka: the refinancing cut the notes coupon from 11.875% to 6.625%, saving $21 million a year; 2026 capex guided at $125-$135 million.

### [Q1 2026 earnings call transcript](https://www.fool.com/earnings/call-transcripts/2026/05/06/tutor-perini-tpc-q1-2026-earnings-transcript/)

Executive talk · Gary G. Smalley, CEO and President · 2026-05-06

- Q1 2026 call opened with the loss of the offshore cargo vessel Mariana, which capsized near Saipan during a super typhoon with a six-member crew including two employees.
- Record Q1 operating cash flow of $147 million (up 542%); revenue $1.4 billion (up 11%), highest Q1 since 2009; backlog $19.8 billion.
- Adjusted EPS $1.03 (up 58%); GAAP EPS $0.48; 2026 adjusted EPS guidance of $4.90-$5.30 affirmed, with 2027 earnings expected to be higher.
- Smalley: "If we did not book any more work, 2027 is going to be a blowout year, as is 2026."
- Approximately $1 billion of finish-trades work on the Midtown Bus Terminal Phase 1 expected in H2 2026; a multibillion-dollar California healthcare project expected to start construction in late 2027.
- Bidding targets include Penn Station, the $1.4 billion Blatnik Bridge, California High-Speed Rail, Sepulveda Transit Corridor, the $3.8 billion Southeast Gateway Line, Newark Terminal B and more than $4 billion in the Indo-Pacific region.
- An unfavorable ruling assessed approximately $175 million of damages on the W Element Hotel dispute in Philadelphia; the company will appeal.
- CFO Soroka targeted refinancing savings of 400-500 basis points; Specialty margins of 1%-3% in 2026, rising to 5%-8% eventually; $20 million of shares bought back at about $72.

## Questions about Tutor Perini Corporation

### What does Tutor Perini do?

Tutor Perini is a US general contractor building large civil infrastructure (mass transit, tunnels, bridges, military facilities) and buildings (healthcare, detention, hospitality and gaming), with its own specialty electrical and mechanical contractors.

### What is Tutor Perini's revenue?

FY2025 revenue was $5.5 billion, up 28%. Nine-month 2026 revenue was $4.7 billion, up 17.6%.

### How many employees does Tutor Perini have?

Approximately 7,400 at December 31, 2025, about 2,000 salaried and 5,400 hourly.

### What is Tutor Perini's backlog?

$20.4 billion at September 30, 2026: 49% Civil, 35% Building and 16% Specialty Contractors.

### Who leads Tutor Perini?

Gary G. Smalley is CEO and President, Ryan J. Soroka is EVP and CFO, and Ronald N. Tutor is executive chairman.

_Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)_