Aker Solutions account plan
Low-carbon energy production
At a glance
Aker Solutions is a Norwegian energy engineering and project-execution company: NOK 63,202 million FY2025 revenue, about 11,800 employees.
Aker Solutions is a Norwegian engineering and project-execution company, listed in Oslo (AKSO) with its head office at Fornebu, serving international, national and independent energy companies in oil and gas, offshore wind, CCS, electrification and hydropower. It has about 11,800 employees and operations in 13 countries. In record year 2025 revenue was NOK 63,202 million (+19%), EBITDA NOK 5,027 million (8.0% margin) and net income NOK 2,531 million. The business is concentrated on Norway and on one large Norwegian oil company, which made up 56% of 2025 revenue, largely through alliance projects with Aker BP.
Business units
Renewables and Field Development
NOK 46.1 billion FY2025 revenueEngineering and delivery of new field developments, platforms, substructures and energy-transition projects, much of it under the alliance model with Aker BP (Hugin A, Valhall PWP, Skarv satellites). It had 6,472 own employees and a 7.6% EBITDA margin in 2025. Its backlog fell to NOK 27.1 billion at Q3 2026, and 2026 revenue is expected at NOK 36-38 billion.
Life Cycle
NOK 15.0 billion FY2025 revenueMaintenance, modifications and operations services under long-term frame agreements with operators such as Equinor, Aker BP, Cenovus and bp. It had 4,111 own employees and a 7.1% EBITDA margin in 2025. Renewed frame agreements lifted H1 2026 order intake to NOK 26.5 billion and the backlog to about NOK 40 billion, about NOK 80 billion with options.
SLB OneSubsea (20% stake)
A 20% stake in the subsea joint venture, which contributed a NOK 749 million share of net income in 2025 and paid NOK 841 million of dividends. Aker Solutions sold its SLB shares for gross proceeds of USD 255 million in February 2026.
Strategic priorities
- Deliver and transform
- CEO Paal Eikeseth, in the role since September 2026, has set two priorities: deliver the current projects and transform the company by reducing the cost base and aligning capacity with the 2027 workload.
- Scale through standardization, automation and AI
- New offerings are to be scaled through standardization, automation and AI, building on digital partnerships with Microsoft, Cognite, Aize and Accenture.
- Next-level Life Cycle
- Life Cycle targets "a 50% improvement in costs and delivery times" and sees NOK 15 billion annual revenue as sustainable.
- Growth in selected new markets
- Rolls-Royce SMR (detailed engineering contracts targeted during 2027), second-generation CCS, hydropower and FPSOs, with more weight on Asia/Australia hubs in Mumbai and Kuala Lumpur.
Latest results
In Q3 2026 revenue was NOK 13,464 million versus NOK 16,983 million a year earlier, in line with expectations after the 2025 peak. EBITDA excluding special items was NOK 1,294 million (9.6%), or 7.7% excluding SLB OneSubsea. Order intake was NOK 5.4 billion and the backlog NOK 69.3 billion, with net cash of NOK 5.8 billion. For the first half, revenue was NOK 26,498 million and net profit rose to NOK 1,661 million. Guidance is NOK 53-55 billion revenue for 2026 and NOK 35-40 billion for 2027 as the Aker BP projects wind down, with an EBITDA margin of 7.0-8.0% excluding SLB OneSubsea.
Investments and deals
- Rolls-Royce SMR partnership
- An MoU signed in April 2026 covers non-nuclear parts of framed modules, with larger construction scopes expected from early 2029.
- CCS projects
- FEED for the Klaipeda CO2 terminal and second-generation CCS work for Hafslund Celsio and the Northern Lights expansion.
- Hydropower
- A profitable hydropower business since the Rainpower acquisition, including Tussa II under an alliance-inspired model.
- SLB stake sale and extraordinary dividend
- SLB shares were sold for gross proceeds of USD 255 million in February 2026, funding an extraordinary dividend of NOK 5.0 per share paid April 27, 2026.
Challenges and risks
- Falling activity after the 2025 peak
- Revenue is guided down from a 2025 peak above NOK 60 billion to NOK 35-40 billion in 2027 as the Norwegian activity-package projects end, forcing workforce reductions announced in January 2026.
- Customer concentration
- One large Norwegian oil company was 56% of 2025 revenue (2024: 43.8%), and Norway accounted for NOK 57,167 million of revenue from customer contracts.
- Shrinking field development backlog
- Renewables and Field Development backlog dropped 30% to NOK 32.6 billion in H1 2026 after the loss of the Wisting FPSO and a European offshore wind project.
- Legacy offshore wind contracts
- The 2019-2021 legacy lump-sum offshore wind projects remain operationally and commercially challenging.
- Safety
- A fatality occurred at the Stord decommissioning site in April 2026.
What leadership says
“from an era of major, large products into more smaller, marginal subsea tiebacks”
“a 50% improvement in costs and delivery times”
Where a supplier can help
- Cost-base reduction
- The deliver-and-transform agenda and the drop to NOK 35-40 billion revenue in 2027 make cost and capacity tools, outsourcing and restructuring support relevant now.
- Automation and AI in engineering
- Scaling new offerings through standardization, automation and AI opens room for engineering automation, data and AI suppliers alongside the existing Microsoft and Cognite partnerships.
- Life Cycle efficiency
- The target of a 50% improvement in costs and delivery times in Life Cycle fits maintenance planning, digital twin and field-service productivity offers.
- New-market build-out
- Rolls-Royce SMR, CCS and hydropower work and the Asia/Australia hubs need specialist partners, modules and local subcontractors.
- Site safety
- The April 2026 fatality at Stord makes safety training and monitoring a credible conversation with yard operations.
Tamtam's reading of the priorities and challenges above, not the company's own words.
Selling to companies like Aker Solutions?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companiesKey documents
Read in full by Tamtam; each summary links to the document itself.
- Annual Report 2025
- Aker Solutions is a Norwegian engineering and project-execution company (Oslo ticker AKSO, head office Fornebu) serving international, national and independent energy companies in oil and gas, offshore wind, CCS, electrification and hydropower; about 11,800 employees (11,818 own employees at 31 Dec 2025) and operations in 13 countries.
- Record 2025: revenue NOK 63,202 million (2024: NOK 53,201 million, +19%), EBITDA NOK 5,027 million (8.0% margin; 8.4% excluding special items), net income NOK 2,531 million.
- Order intake NOK 66.4 billion (2024: NOK 40.1 billion) and year-end backlog NOK 64.8 billion, dominated by projects under the alliance model with Aker BP; tender pipeline about NOK 80 billion at year-end.
- Two reporting segments: Renewables and Field Development (revenue NOK 46.1 billion, EBITDA margin 7.6%, 6,472 own employees) and Life Cycle (revenue NOK 15.0 billion, EBITDA margin 7.1%, 4,111 own employees); plus a 20% stake in SLB OneSubsea (share of net income NOK 749 million).
- Heavy concentration: one large Norwegian oil company was 56% of total revenue (2024: 43.8%) and Norway was NOK 57,167 million of NOK 62,202 million revenue from customer contracts.
- Renewables and transitional energy solutions were 20% of revenue (2024: 18%); oil-and-gas-related products and services were 84% of revenue from customer contracts.
- The company expects activity to decrease in 2026 after several years of record workload and is adjusting capacity and cost levels; the 2019-2021 legacy lump-sum projects (offshore wind) remain operationally and commercially challenging.
- Digitalization and AI with partners Microsoft, Cognite, Aize and Accenture are central to project execution (e.g. the fully digitalized Yggdrasil model for Aker BP).
- Shareholder returns: proposed ordinary dividend NOK 3.60 per share (about 60% of adjusted net profit) plus an extraordinary NOK 5.0 per share after selling its SLB shares for gross proceeds of USD 255 million in February 2026.
- Half-Year Report 2026
- First-half 2026 revenue fell to NOK 26,498 million from NOK 29,544 million as activity declined after the 2025 peak; EBITDA NOK 2,302 million (8.7% margin), 8.9% excluding special items.
- Net profit rose to NOK 1,661 million (1H 2025: NOK 957 million), helped by net financial items of NOK 551 million; EPS NOK 3.43.
- Order intake NOK 38,730 million and backlog NOK 77,173 million (1H 2025: NOK 67,954 million).
- Life Cycle order intake jumped to NOK 26.5 billion (book-to-bill 3.8) on renewed long-term frame agreements with Equinor and Aker BP with larger scope; backlog NOK 42.4 billion.
- Renewables and Field Development order intake fell to NOK 11.0 billion and backlog dropped 30% to NOK 32.6 billion.
- Workforce reductions and capacity adjustments were announced in January 2026; a fatality occurred at the Stord decommissioning site in April 2026.
- New growth areas: MoU with Rolls-Royce SMR (April 2026) for non-nuclear parts of framed modules; FEED for the Klaipeda CO2 terminal.
- Net cash NOK 2.3 billion plus NOK 2.0 billion in liquid funds; liquidity buffer NOK 7.3 billion; extraordinary dividend of NOK 5.0 per share paid April 27, 2026.
- Third-Quarter 2026 Results Presentation
- Q3 2026 revenue NOK 13,464 million (Q3 2025: NOK 16,983 million), in line with expectations after the 2025 peak; EBITDA excluding special items NOK 1,294 million (9.6%), or 7.7% excluding SLB OneSubsea's NOK 281 million net profit.
- Order intake NOK 5.4 billion and backlog NOK 69.3 billion; net cash NOK 5.8 billion including NOK 2.1 billion in liquid funds.
- 2026 guidance: revenue NOK 53-55 billion with an EBITDA margin of 7.5-8.0% excluding SLB OneSubsea.
- 2027 preliminary guidance: revenue NOK 35-40 billion with an EBITDA margin of 7.0-8.0% excluding SLB OneSubsea, as the Aker BP projects wind down.
- Renewables and Field Development: revenue NOK 9.2 billion, EBITDA NOK 775 million (8.4%), backlog NOK 27.1 billion; 2026 revenue expected NOK 36-38 billion.
- Life Cycle: revenue NOK 3.6 billion, EBITDA NOK 274 million (7.6%), backlog NOK 40.0 billion excluding options; new long-term frame agreement with bp in the UK.
- New CEO Paal Eikeseth's agenda "Deliver and Transform": reduce the cost base, align capacity with 2027 workload, scale new offerings through standardization, automation and AI, and target profitable growth in selected markets (incl. Rolls-Royce SMR).
- Q3 2026 earnings call transcript
- First results call of CEO Paal Eikeseth (in the role since September 2026), with CFO Idar Eikrem; his two priorities are "deliver and transform".
- Q3 2026 revenue NOK 13.5 billion, EBITDA margin 9.6% (7.7% excluding SLB OneSubsea net profit); 2026 guidance NOK 53-55 billion revenue.
- 2027 revenue guided to NOK 35-40 billion (from a 2025 peak above NOK 60 billion) as the NCS activity-package projects end; the company will cut costs and capacity, with restructuring costs booked as special items.
- Shift "from an era of major, large products into more smaller, marginal subsea tiebacks"; tender pipeline about NOK 72 billion after losing the Wisting FPSO, with more weight on Asia/Australia hubs (Mumbai, Kuala Lumpur) and FPSOs.
- Life Cycle renewed all long-term frame agreements in Norway and Canada and won a bp UK frame agreement; backlog NOK 40 billion, about NOK 80 billion with options.
- New markets: Rolls-Royce SMR (detailed engineering contracts targeted during 2027, first energy ambition 2035), a Microsoft collaboration to mature projects to FID, a profitable hydropower business since the Rainpower acquisition.
- SLB OneSubsea (20%): 18.5% EBITDA margin, net cash USD 482 million; dividends expected in line with 2025 (NOK 841 million received in 2025).
- Q2 2026 earnings call transcript
- Last results call of CEO Kjetel Digre (Q2 2026, July 14, 2026), with CFO Idar Eikrem; Q2 revenue NOK 13.1 billion, EBITDA margin 9.2% (7.9% excluding SLB OneSubsea).
- 2026 guidance raised to NOK 50-55 billion revenue with an EBITDA margin around 7.5% excluding SLB OneSubsea; NOK 4.2 billion (NOK 8.6 per share) paid in dividends in Q2.
- Life Cycle renewed all five frame agreements tendered in 12 months, most recently Cenovus in Canada, with larger scope; ambition "a 50% improvement in costs and delivery times" ("next-level lifecycle").
- Aker BP portfolio: Hugin A and Valhall PWP in final assembly at Stord; Verdal delivered all four substructures; Skarv satellites on track for first gas in H2 2026.
- Adjacent markets: second-generation CCS (Hafslund Celsio, Northern Lights expansion), hydropower (Tussa II with an alliance-inspired model), Rolls-Royce SMR MoU with larger construction scopes expected from early 2029.
- Tender pipeline about NOK 77 billion, now dominated by oil and gas, after losing a European offshore wind project to a local competitor.
- Life Cycle backlog NOK 42.4 billion (about NOK 80 billion with options); NOK 15 billion annual revenue seen as sustainable.
Questions about Aker Solutions
What does Aker Solutions do?
Aker Solutions engineers and executes energy projects for oil and gas, offshore wind, CCS, electrification and hydropower customers, and provides life-cycle maintenance and modification services.
What is Aker Solutions' revenue?
Revenue was a record NOK 63,202 million in 2025. Guidance is NOK 53-55 billion for 2026 and NOK 35-40 billion for 2027.
How many employees does Aker Solutions have?
Aker Solutions had 11,818 own employees at 31 Dec 2025, with operations in 13 countries.
Who leads Aker Solutions?
Paal Eikeseth has been President and CEO since September 2026, succeeding Kjetel Digre; Idar Eikrem is CFO.
Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)