At a glance

Amprion is one of Germany's four transmission system operators, with €6,137.3 million FY2025 revenue and a €42.1 billion 2026-2030 investment plan.

Amprion GmbH, based in Dortmund, runs the 220/380 kV extra-high-voltage transmission grid "From the North Sea to the Alps" and says it supplies 29 million people and a third of the German economy. Its customers are distribution system operators, energy-intensive industrial companies and power plants, and its revenue is set by a regulator-defined revenue cap. In FY2025 (IFRS) it reported external revenue of €6,137.3 million (+8.9%), adjusted EBITDA of €1,530.7 million and adjusted consolidated net income of €671.9 million, with a workforce of 3,434 FTEs at end-2025. At 30 June 2026 it was owned by the M31 consortium of mainly German insurers and pension funds (74.9%) and RWE Alkaios Holding (25.1%); after that date RWE lifted its economic stake to around 55%. Its debt is listed on the Euro MTF market in Luxembourg.

Business units

Strategic priorities

Finishing the DC electricity highways
Ultranet is due in December 2026 and A-Nord fully in 2027; the CEO says the two lines will cut redispatch costs by 700 million euros from 2027.
Delivering the 2026-2030 investment programme
€42.1 billion of investment to 2030: around €25,400 million onshore at Amprion GmbH and around €16,800 million at Amprion Offshore GmbH. The 2026 capex target is around €7.4 billion (€4.3 billion onshore, €3.1 billion offshore).
Funding a 6 to 6.5 billion euro yearly debt need
About 60% of the 42 billion euros is to be financed with debt, about 25% with equity and about 15% internally. The bond programme was raised to €25.0 billion and Amprion is considering issuing in Australian dollars, Swiss francs or sterling.
A competitive regulatory return
BNetzA plans a WACC-based return on capital, with the final TSO framework expected in Q3 2026; the CFO wants a return "at least at the average of the European continent".
Managing scarce grid connections
Amprion has given 70 GW of connection commitments against a peak load of 27 GW, with 35 GW to be actually connected by end-2029; the CEO wants government and lawmakers to set priorities.
System stability
Five new grid-stabilising installations were commissioned in 2025 (16 in total), with five to seven more planned every year.

Latest results

In H1 2026 (IFRS) external revenue fell 10.9% to €2,748.8 million and consolidated net income fell to €290.8 million (H1 2025: €522.8 million), reflecting a lower revenue cap and higher interest costs. HGB net income of Amprion GmbH, the steering KPI, rose 23.8% to €352.7 million on higher capital-cost income from investment. H1 investment was €1,944.2 million (IFRS). Full-year 2026 HGB net income guidance was raised to €680-760 million (from €600-690 million), and the around €7.4 billion capex target was confirmed. The workforce reached 3,595 FTEs at 30 June 2026, with the year-end target trimmed to 3,800 FTEs.

Investments and deals

Record 2025 investment
€5,446.1 million (IFRS) invested in 2025: €3,638.4 million in Transmission System Operation and €1,807.6 million in Offshore Grid Connections; the regulated asset base reached about €16.5 billion.
Onshore HVDC projects
A-Nord, Ultranet, Corridor B (710 km HVDC), Rastede-Bürstadt DC34, Ovelgönne-Marxheim DC35 and the Rhine-Main Link (four bundled projects, four converters).
Offshore grid connections
DolWin4 and BorWin4 (in operation 2028), BalWin1 and BalWin2, around €3,200 million of offshore investment in 2026.
Equity and debt raised
€2,200.0 million shareholder equity injection (December 2025), €2.6 billion triple-tranche green bond (January 2026), first green hybrid bond of €1.0 billion (April 2026) and a syndicated loan raised to €6,500.0 million with 15 core banks.
Grid innovation
Decentralised grid booster with LEW Verteilnetz and E.ON (250 MWh of battery storage, contracts signed 10 December 2025) and the KuPilot curative redispatch pilot in Emsland (200 MW).

Challenges and risks

Regulation and legislation risk
Rated the highest risk class ("High"); appeals on equity returns were dismissed by the Higher Regional Court of Düsseldorf on 29 October 2025 and have been taken to the Federal Court of Justice.
Rating pressure
Moody's downgraded Amprion to Baa2 (stable) on heavy investment and pressure on cash-flow metrics; the equity ratio fell to 32.6% at 30 June 2026 from 36.8%.
Redispatch and balancing costs
Balancing-power costs rose approximately 54% in 2025, and the CEO expects redispatch price effects if wholesale prices stay high as the Iran war goes on.
Skilled-labour shortage
End-2025 headcount was 5.7% below forecast because of the skilled-labour shortage.
Project delivery and cyber risk
Project delays and cost overruns are rated medium risk; NIS 2 makes TSOs "particularly important entities" for IT and cyber security.

What leadership says

“The Ultranet and A-Nord lines alone will lower redispatch costs by 700 million euros from 2027”

Dr Christoph Müller, CEO · FY2025 results press conference, reported by ZfK, 2026-04-01 (translated from German)

“Grid connections are a scarce good, so we must use this resource efficiently”

Dr Christoph Müller, CEO · FY2025 results press conference, reported by ZfK, 2026-04-01 (translated from German)

“financing on such a scale is not a sure-fire success!”

Peter Rüth, CFO · CFO interview in the Amprion Financial Report 2025, 2026-04-01

“In the end we need a regulatory return that is at least at the average of the European continent”

Peter Rüth, CFO · Börsen-Zeitung interview, 2026-10-12 (translated from German)

Where a supplier can help

HVDC and offshore project delivery
The €42.1 billion investment programme and the ten offshore grid connections create demand for construction, cable, converter and project-control capacity, especially with project delays and cost overruns rated a medium risk.
Recruiting and workforce tools
Headcount ended 2025 below forecast because of the skilled-labour shortage; recruiting, training and productivity offers tie directly to the 3,800 FTE year-end 2026 target.
Treasury and capital-markets services
A 6 to 6.5 billion euro yearly debt need and plans to issue in new currencies open room for treasury, hedging and investor-relations support.
Grid stability and flexibility solutions
Five to seven new grid-stabilising installations a year, the battery-based grid booster and rising redispatch costs point to demand for storage, voltage-control and congestion-management technology.
Cyber security for critical infrastructure
NIS 2 classifies TSOs as "particularly important entities", making security services and compliance tooling relevant to Amprion's IT and cyber risk.

Tamtam's reading of the priorities and challenges above, not the company's own words.

Selling to companies like Amprion GmbH?

Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.

Find similar companies

Key documents

Read in full by Tamtam; each summary links to the document itself.

Questions about Amprion GmbH

What does Amprion do?

Amprion is one of Germany's four transmission system operators, running the 220/380 kV extra-high-voltage grid from Dortmund. It also builds offshore grid connections through Amprion Offshore GmbH.

What is Amprion's revenue?

In FY2025 Amprion reported external revenue of €6,137.3 million (IFRS), up 8.9%. In H1 2026 external revenue was €2,748.8 million.

How many employees does Amprion have?

Amprion had 3,434 FTEs at end-2025 and 3,595 FTEs at 30 June 2026, with a year-end 2026 target of 3,800 FTEs.

How much is Amprion investing?

Amprion plans €42.1 billion of investment over 2026-2030, with around €7.4 billion targeted for 2026.

Who leads Amprion?

Dr Christoph Müller is CEO, Peter Rüth CFO, Dr Hendrik Neumann CTO and, from 1 March 2026, Katrin Hilmer COO.