ASFINAG in the news
Connecting regions and people
Tamtam found 20 recent articles about ASFINAG.
- Holzarbeiten entlang der A 12 bei Weer bis Wattens
ASFINAG is undertaking extensive road maintenance and noise protection upgrades along the A12 Inntal motorway near Weer and Wattens, with woodwork starting soon and major works planned from March 2027.
- Sieben Millionen Euro investiert: Neuer Verkehrskontrollplatz auf der A2 in Kärnten eröffnet
ASFINAG inaugurated a new 7 million Euro traffic control center on the A2 Südautobahn in Carinthia, Austria, to enhance road safety through comprehensive heavy vehicle inspections.
- Ohne Vignette in Österreich: So viele Autofahrer werden erwischt – welche Strafen drohen?
Austria enforces mandatory road tolls via vignettes or GO-Maut, with ASFINAG reporting hundreds of thousands of annual violations leading to substitute tolls or significant fines for non-compliance.
- Fotos der Veranstaltung - Ante Portas mit ASFINAG Vorstandsdirektor Hartwig Hufnagl
A photo gallery is available from the Ante Portas event featuring ASFINAG board member Hartwig Hufnagl.
- Ante Portas mit ASFINAG Vorstandsdirektor Hartwig Hufnagl
An "Ante Portas" discussion features ASFINAG Board Director Hartwig Hufnagl.
- Spätherbstliches Wetter erfordert angepasstes Fahrverhalten
ASFINAG advises on safe driving in late autumn weather, warns of high traffic for the agraria fair in Wels, and reports on a major A99 closure near Munich for bridge demolition.
- A9 nach Sanierung wieder frei befahrbar
ASFINAG completed an 8-kilometer renovation of the A9 motorway section between Gratkorn North and Deutschfeistritz, costing nearly 60 million Euros, including road surface replacement, bridge renewal, noise protection, and environmental measures, with full traffic access restored.
- Einzelne Fahrstreifen der S6 bei Leoben erneut kurze Zeit gesperrt
Individual lanes of the S6 near Leoben will be temporarily closed again for final construction checks, shortly after the main construction concluded.
- Plabutschtunnel-Sanierung: Debatte um dritte Röhre, Sozialpartner pochen auf Variantenvergleich
Social partners and the Federation of Austrian Industries are demanding a comprehensive economic review of all options for the Plabutschtunnel renovation, including a 'third tube' alternative, while Asfinag prepares to release its fact-check results.
- A26-Bauarbeiten: Halbseitige Sperre im Kreuzungsbereich Kudlichstraße/Waldeggstraße
ASFINAG announced a partial closure of the Kudlichstrasse/Waldeggstrasse intersection in Linz from November 18 to December 23, 2026, due to construction for the A 26 Linz motorway.
- ASFINAG siedelt sich in S7-Businesspark an
ASFINAG is building a new maintenance base in the S7 Business Park for the S7 expressway and A2 motorway, creating six jobs by early 2028.
- Cyberangriffe: Digitale Systeme der Asfinag sind mehrstufig abgesichert
ASFINAG secures its critical digital infrastructure, including traffic and toll systems, with multi-layered security measures, compliance with regulations, and emergency operational plans to counter cyber threats.
- Österreich-Vignette 2027: Preise, Fristen und Digitalpflicht
ASFINAG is transitioning to exclusively digital vignettes for Austrian motorways from December 1, 2026, with price changes for 2027 and an 18-day waiting period for private online purchases.
- Asfinag plant Freigabe des A7-Pannenstreifens bei Linz
ASFINAG plans to convert the A7 hard shoulder near Linz into a regular lane after current renovations, aiming to reduce traffic congestion by late 2027.
- Weitere fünf Jahre: Stefan Siegele bleibt ASFINAG-Geschäftsführer
Stefan Siegele has been reappointed as the Managing Director of ASFINAG Alpenstraßen GmbH for another five-year term, continuing his leadership in western Austria.
- Neues Stützpunktgebäude: ASFINAG baut im Gewerbegebiet an der Schnellstraße S7
ASFINAG is constructing a technical maintenance base near the S7 motorway for their infrastructure.
- Vignette 2027: Neue Preise, Fristen und wichtige Änderungen
Austria's 2027 highway vignette goes fully digital, replacing adhesive stickers, with price increases in January and an 18-day online purchase waiting period unless bought at AMTC.
- Vignette 2027 jetzt erhältlich, Kauf heuer noch zum alten Preis
Austria is switching entirely to a digital vignette system by February 1, 2027, offering increased convenience and retaining current validity models, with ASFINAG managing the transition and sales.
- Maut in Österreich wird ab 2027 deutlich teurer: Auf diesen Alpen-Strecken müssen Autofahrer extra zahlen
Austria is implementing a fully digital vignette system from 2027, alongside separate per-trip tolls on key alpine routes, and the motorway company ASFINAG is responsible for these charges.
- Weiterbau der S 10 Mühlviertler Schnellstraße: Asfinag lädt zur Planungsausstellung im Gasthof Pammer
ASFINAG is holding a planning exhibition for the S 10 Mühlviertler Schnellstraße extension project in Leopoldschlag.
Articles collected by Tamtam and kept when they are about the company, newest first. Each links to its source.
Selling to companies like ASFINAG?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companies