At a glance

Bloom Energy makes solid-oxide fuel cell servers for onsite power, mainly for AI data centers; it guides 2026 revenue to $4.4B - $4.6B.

Bloom Energy, headquartered in San Jose, California, designs, manufactures and operates the Bloom Energy Server, a solid-oxide fuel cell that turns natural gas, biogas or hydrogen into electricity without combustion, and the Bloom Electrolyzer for hydrogen. It sells to data centers (hyperscalers, colocation operators, neoclouds), commercial and industrial sites and utilities, usually through financiers that own the servers and sell the power to the end user. Systems run on about 1,100 sites in 9 countries; the U.S. was 81% of 2025 revenue and South Korea is the second market. FY2025 revenue was $2,023,994 thousand, up 37.3%, with income from operations of $72,802 thousand and a net loss attributable to common stockholders of $88.4 million. The company had 2,214 full-time employees at end 2025, is led by founder, Chairman and CEO KR Sridhar, and was added to the S&P 500 in 2026.

Business units

Strategic priorities

Become the standard for onsite power
The long-term objective is to establish solid oxide fuel cells as the standard architecture for onsite power across data centers, advanced manufacturing and critical infrastructure, using time to power as the main argument against grid interconnection timelines that have more than doubled to 55 months.
Scale with AI data center demand
All the major U.S. hyperscalers and over a dozen neoclouds, AI labs and co-location operators have validated Bloom's power solutions. Bloom started 2026 expecting 60% revenue growth and now projects over 120% at the midpoint, with backlog expanding faster than revenue.
Spread beyond hyperscalers
Bloom targets commercial and industrial sites, utilities deploying servers front of the meter, the US Army through partner Indelible, and international markets; its survey found one quarter of U.S. C&I facilities expect to be fully powered on-site by 2030 and 35% by 2035.
Add manufacturing capacity ahead of orders
Fremont annual capacity is being expanded from 1 GW to 2 GW by end 2026, and the site footprint is being prepared for beyond the 5-gigawatt milestone, with each extra gigawatt costing about $100 million to $150 million and six to nine months.
Carbon capture and 800V DC
Bloom pushes carbon-capture-ready systems, which hyperscalers increasingly ask for, and native DC output compatible with 800 VDC data center standards; AEP revealed 700 MW of carbon-capture-enabled servers to supply Google.
Self-funded growth
Management calls Bloom a self funding business: 2026 capital spending is funded from operations, and free cash flow was positive $42 million year to date at Q3 2026.

Latest results

In Q3 2026 revenue was $1,235.8 million, up 138.1% year on year and 16% sequentially, with product revenue of $1,073.6 million, up 179.4%. GAAP gross margin rose to 33.8% and GAAP operating income reached $225.4 million (18.2% margin); net profit to common stockholders was $250,271 thousand against a loss of $23,093 thousand a year earlier. Over nine months revenue was $3,052,256 thousand, up 144.9%, and the U.S. was 97% of Q3 revenue, with two customers at about 43% and 26%. Unrestricted cash stood at $2,486.7 million at September 30, 2026. Bloom raised its full-year 2026 guidance for the third time to revenue of $4.4B - $4.6B (122% growth at the midpoint), non-GAAP gross margin of ~34%, non-GAAP operating income of $960M - $1,030M and non-GAAP EPS of $3.10 - $3.40.

Investments and deals

Fremont and Delaware capacity
Capex was $153 million in Q3 2026 and $231 million year to date, mainly Fremont build-out including a $197.5 million increase in tenant improvement spending; further capacity investments are planned in Fremont and Delaware. A $75.3 million Section 48C(e) manufacturing credit was allocated to Fremont, subject to certification.
Brookfield financing framework
Brookfield set up a financing framework of up to $5.0 billion in August 2025 via an AI Infrastructure Fund and expanded its commitment to $25 billion in June 2026; Bloom invested $36.5 million in the Brookfield joint ventures in 2025.
Oracle partnership
Oracle partnered with Bloom in October 2025 for on-site power for AI data centers; its warrant was exercised on May 1, 2026 for 1,905,433 shares plus 248,798 inducement shares worth $72.3 million.
Convertible notes and credit facility
Bloom issued $2,500.0 million of 0% convertible senior notes due November 2030, partly to exchange its 2028 and 2029 green notes, and signed a $600.0 million revolving credit facility on December 19, 2025, which remains undrawn.
Other project capital partners
Industrial Development Funding, with Oaktree, MUFG Bank and Morgan Stanley, brought its commitment to $2.6 billion and bought servers for a Nebius off-take.

Challenges and risks

Customer concentration and AI exposure
Two customers accounted for about 43% and 26% of Q3 2026 revenue, and the growing AI customer mix is exposed to any actual or perceived slowdown in AI data center build-out.
Data center opposition and permitting
The 10-Q flags growing opposition to data centers, including a New York moratorium on new hyperscale data centers in July 2026, and air, land use and gas permits taking longer for larger installations; Bloom generally cannot sell servers to a financier until permits are in hand.
Harder financing for data center customers
Projections of AI-related debt issuance in 2026 above $500 billion, with hyperscalers, neoclouds and co-location providers increasingly seen as higher credit risks, could cancel projects or pressure prices.
Supply chain, tariffs and inflation
Freight volatility from Middle East events, new tariffs of 10% to 12.5% imposed in late July 2026, commodity price volatility, rising parts and labor inflation, and a July 8, 2026 short-seller report on raw-material sourcing that Bloom rejected.
Installation margins and performance guarantees
Installation gross margin was (5)% in Q3 2026, and performance guarantee caps rose to approximately $847.2 million, with $466.1 million of remaining potential payments.

What leadership says

“What began with hyperscalers is rapidly moving across market segments because every business needs reliable power to grow.”

KR Sridhar, Founder, Chairman and Chief Executive Officer · Q3 2026 financial results press release, October 22, 2026

“Chips without power are inventory, not intelligence.”

KR Sridhar, Founder, Chairman and Chief Executive Officer · Q2 2026 earnings call, July 28, 2026

“we will never be slow enough that we are the bottleneck”

KR Sridhar, Founder, Chairman and Chief Executive Officer · Q3 2026 earnings call, October 22, 2026, on Fremont capacity

“we already view this as a self funding business”

Simon Edwards, Chief Financial Officer · Q3 2026 earnings call, October 22, 2026

Where a supplier can help

Factory ramp suppliers
The Fremont expansion from 1 GW to 2 GW by end 2026, and further capacity in Fremont and Delaware, creates needs for manufacturing equipment, construction, automation and component supply.
Certified EPC installers and site services
The move to a consult-only installation model for large-load sites, where customers contract directly with certified third-party EPC installers, opens room for installation, engineering and commissioning partners, and for tools that lift the negative installation margin.
Permitting and community engagement
Permit delays and data center opposition are named headwinds; firms offering permitting, environmental and community-relations support could help speed sites to power.
Supply chain resilience
Tariffs, freight volatility, inflation and scrutiny of raw-material sourcing make multi-country sourcing, logistics and trade-compliance services relevant to Bloom's ramp.
Carbon capture and DC power partners
The push for carbon-capture-ready systems and 800V DC architectures gives carbon capture, power electronics and data center design partners a way in.

Tamtam's reading of the priorities and challenges above, not the company's own words.

Selling to companies like Bloom Energy?

Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.

Find similar companies

Key documents

Read in full by Tamtam; each summary links to the document itself.

Questions about Bloom Energy

What does Bloom Energy do?

Bloom Energy makes the Bloom Energy Server, a solid-oxide fuel cell that generates electricity on site from natural gas, biogas or hydrogen without combustion, and the Bloom Electrolyzer for hydrogen. It sells mainly to data centers, commercial and industrial sites and utilities, often through financiers that sell the power to end users.

What is Bloom Energy's revenue?

FY2025 revenue was $2,023,994 thousand, up 37.3%. Q3 2026 revenue was $1,235.8 million, and full-year 2026 guidance is $4.4B - $4.6B.

How many employees does Bloom Energy have?

Bloom had 2,214 full-time employees at end 2025, including 1,752 in the U.S. and 395 in India.

Who leads Bloom Energy?

Founder KR Sridhar is Chairman and Chief Executive Officer; Simon Edwards is Chief Financial Officer.

What is Bloom Energy's strategy?

Bloom aims to make solid oxide fuel cells the standard architecture for onsite power, starting with AI data centers that need fast time to power and spreading to commercial and industrial sites, utilities and international markets, while adding factory capacity ahead of orders.

Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)