GE Aerospace account plan
Jet engine manufacturer
At a glance
GE Aerospace makes and services commercial and military jet engines, with $45,855 million FY2025 revenue and approximately 57,000 employees.
GE Aerospace (legal name General Electric Company), headquartered in Evendale, Ohio, is the aerospace business GE kept after separating GE Vernova and GE HealthCare. It designs, manufactures and services jet engines and components for airlines, airframers such as Boeing and Airbus, and governments, with an installed base of approximately 50,000 commercial and 30,000 military engines; aftermarket services are approximately 70% of revenue. FY2025 total revenue was $45,855 million (up 18%), operating profit $9.1 billion (21.4% margin) and free cash flow $7.7 billion. It had approximately 57,000 employees, about 30,000 in the United States, and customers in approximately 120 countries. H. Lawrence Culp, Jr. is Chairman & CEO.
Business units
Commercial Engines & Services (CES)
approximately 73% of 2025 revenue ($33,314 million)Jet engines and services for narrowbody, widebody, regional and business aircraft, including the LEAP and CFM56 sold through CFM International, the 50-50 joint venture with Safran Aircraft Engines, plus GEnx, GE90 and GE9X. Revenue grew 24% in 2025 and 27% in Q2 2026, with services 75% of CES revenue. From 2026 it covers the whole commercial engine lifecycle and is led by Mohamed Ali, CEO of CES since February 1, 2026.
Defense & Propulsion Technologies (DPT)
approximately 23% of 2025 revenue ($10,554 million)Two businesses: Defense & Systems (F110, F404, F414, T408, T700 and T901 engines, LM2500 marine engines; $6,574 million 2025 revenue, led by Amy Gowder) and Propulsion & Additive Technologies (Avio Aero, Unison, Dowty Propellers and Colibrium Additive components; $3,980 million, led by Ricardo Procacci). The Aeroderivative business joined DPT in 2026. DPT RPO reached $30,663 million at June 30, 2026, up 19%.
Strategic priorities
- Fix supply to meet demand
- Management says the constraint is supply, not demand: spare parts delinquency grew 20% sequentially in Q2 2026 while more than 95% of Q3 spare parts revenue was already in backlog.
- Scale LEAP production and services
- LEAP shop visits are expected to grow at about a 25% CAGR to 2030, with LEAP services margins in line with the total services portfolio by 2028; the certified LEAP-1B durability kit should roughly double time on wing.
- FLIGHT DECK and AI in operations
- The lean system and AI are used to cut lead times: F110 deliveries rose over 50% and supplier demand signals were cut in half with processing time down nearly 90% across 190 parts.
- Defense growth and next-generation engines
- The XA102 adaptive cycle engine moved to assembly and test, GEK1500 and GE426 reached preliminary design review milestones for Collaborative Combat Aircraft, and defense book-to-bill stayed above 2 in Q1 2026.
- Future of flight technology
- The CFM RISE programme (Open Fan, compact core, hybrid electric) and a megawatt-class hybrid electric demonstrator under NASA's EPFD continue, backed by roughly $3 billion of annual R&D.
Latest results
In Q2 2026 total revenue rose 21% to $13,349 million and adjusted EPS rose 22% to $2.02, with operating profit of $2.7 billion at a 21.7% margin, down 130 bp on install engine growth, investment and inflation. CES revenue grew 27% and DPT 16%; first half free cash flow was $4,685 million against $3,572 million. RPO reached $210,790 million at June 30, 2026. 2026 guidance was raised to high-teens revenue growth, operating profit of $10.55-10.75 billion, EPS of $7.65-7.85 and free cash flow of $8.9-9.2 billion.
Investments and deals
- Acquisition of Consolidated Precision Products
- Agreed on September 8, 2026 to buy the Cleveland castings maker (~6,600 employees, more than 20 facilities) for $11.75 billion, financed with $7 billion in cash and new debt; closing expected in the second half of 2027.
- U.S. manufacturing
- $1 billion invested and 5,000 U.S. workers hired in 2025, with the same planned for 2026, including nearly $200 million for LEAP durability upgrades.
- MRO capacity
- $1 billion to increase MRO capacity, including $500 million for LEAP MRO, plus $300 million at the Singapore repair facility.
- Supplier tooling
- $100 million for external suppliers' equipment and tooling to raise priority supplier material input.
- Capital return
- 29.6 million shares repurchased for $7.4 billion in 2025 and dividends declared of $1.44 per share.
Challenges and risks
- Supply chain and material availability
- Material availability and supplier delivery performance still disrupt production, with sole- or limited-source suppliers a stated risk.
- Margin dilution from new engines
- Install engine growth, LEAP services and GE9X losses, which peak by 2028, weigh on margins; a GE9X mid-seal durability issue was found in January 2026.
- Middle East conflict and air traffic
- The full-year departures outlook was cut to flat to low single-digit growth; GE flags possible lower shop visits, spare parts volumes and customer credit effects, with no material impact in the first half of 2026.
- Tariffs and trade policy
- Tariffs affected long-term service agreement profitability in 2025; export controls, including rare earth restrictions, and sanctions remain risks.
- Legacy insurance exposure
- Run-off long-term care insurance carries GAAP reserves of $23,837 million, alongside Bank BPH litigation.
What leadership says
“it's much more a supply-side challenge than it is demand”
“Investing in mission-critical casting capacity is needed to support the strong simultaneous demand across commercial engines, aftermarket and defense.”
“Operationally, it is a number we are not proud of”
“AI is a force multiplier for FLIGHT DECK”
Where a supplier can help
- Castings, forgings and critical parts
- Tied to the supply chain challenge and the CPP acquisition: suppliers that add capacity for engine components can reduce the spare parts delinquency GE calls a supply-side problem.
- MRO tooling and repair technology
- Tied to the MRO capacity investments and the LEAP shop visit growth: repair processes, inspection equipment and tooling shorten turnaround times.
- Industrial AI and supplier planning
- Tied to the FLIGHT DECK and AI priority: tools that cut lead times or improve supplier demand signals extend what GE already reports.
- U.S. manufacturing workforce
- Tied to the plan to hire 5,000 U.S. workers in 2026: recruiting, training and onboarding services for factory and MRO sites.
Tamtam's reading of the priorities and challenges above, not the company's own words.
Selling to companies like GE Aerospace?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companiesKey documents
Read in full by Tamtam; each summary links to the document itself.
- Form 10-K for the fiscal year ended December 31, 2025
- GE Aerospace (legal name General Electric Company, Evendale, Ohio) is the aerospace business GE retained following the separations of GE Vernova and GE HealthCare. It has an installed base of approximately 50,000 commercial and 30,000 military engines; aftermarket services are approximately 70% of revenue. Approximately 57,000 employees, of whom approximately 30,000 in the United States; customers in approximately 120 countries.
- FY2025 total revenue $45,855 million, up 18% (adjusted revenue excluding run-off insurance $42,322 million); profit $10.0 billion (21.8% margin); operating profit $9.1 billion (21.4%); continuing EPS $8.05, adjusted EPS $6.37 (up 38%); free cash flow $7.7 billion vs $6.2 billion.
- Two reportable segments: Commercial Engines & Services (CES), approximately 73% of revenue ($33,314 million, up 24%, profit $8,861 million, 26.6% margin), and Defense & Propulsion Technologies (DPT), approximately 23% ($10,554 million, up 11%, profit $1,296 million, 12.3% margin).
- Backlog (RPO) $190,564 million at end-2025, up 11%, of which services $163,029 million. 2,386 commercial engines delivered (1,802 LEAP) and 635 defense engines; internal shop visit revenue grew 24%.
- Non-U.S. revenue was 60% of the total; Asia grew to $10,819 million from $7,237 million. U.S. government agencies were 10% of revenue.
- CFM International, the 50-50 joint venture with Safran Aircraft Engines, sells the LEAP and CFM56; GE makes substantial sales of parts and services to it. Boeing and Airbus are the main airframer customers.
- Investment: total R&D $2,989 million (GE-funded $1,580 million); $1 billion invested in U.S. manufacturing and 5,000 U.S. workers hired in 2025; $1 billion to increase MRO capacity, including $500 million for LEAP MRO.
- Capital return: 29.6 million shares repurchased for $7.4 billion in 2025 ($12.3 billion of the $15.0 billion authorization used); dividends declared $1.44 per share. Moody's upgraded to A3 and S&P to A- in 2025.
- Organisation from 2026: CES expands to the whole commercial engine lifecycle and the Aeroderivative business moves to DPT; Mohamed Ali becomes CEO of CES on February 1, 2026, Russell Stokes retiring in July 2026.
- Main risks: supply chain and material availability, product safety and quality, tariffs and trade policy, commercial aviation cyclicality, U.S. defense budgets, run-off insurance (long-term care) and Bank BPH legacy exposure, cybersecurity.
- Form 10-Q for the quarter ended June 30, 2026
- Q2 2026 (quarter to June 30) total revenue $13,349 million, up 21%; adjusted revenue $12,634 million. First half revenue $25,741 million, up 23%.
- Q2 continuing EPS $2.30 (vs $1.87); adjusted EPS $2.02, up 22%; operating profit $2.7 billion with operating margin 21.7%, down 130 basis points. First half adjusted EPS $3.88, up 24%; first half free cash flow $4,685 million vs $3,572 million.
- CES Q2 revenue $9,731 million (+27%), profit $2,657 million (+20%), margin 27.3% (vs 28.9%); 659 commercial engines delivered, of which 510 LEAP; internal shop visit revenue +25%.
- DPT Q2 revenue $3,443 million (+16%), profit $475 million (+18%), margin 13.8%; Defense & Systems $2,213 million, Propulsion & Additive Technologies $1,230 million.
- RPO $210,790 million at June 30, 2026, up $20.2 billion from year-end; DPT RPO up 19% to $30,663 million.
- Commercial deals in H1: United and Delta chose GEnx for Boeing 787 orders; American and Copa chose LEAP; Ryanair signed a long-term services agreement for about 2,000 CFM56 and LEAP engines. Iberia became the seventh Premier MRO.
- Middle East conflict: possible lower shop visits, spare parts and spare engine volumes and customer credit effects; no material impact in H1 2026. GE received a portion of IEEPA tariff refunds after the Supreme Court ruling.
- Plans to invest $1 billion in U.S. manufacturing and hire 5,000 U.S. workers in 2026; Moody's upgraded to A2 and S&P moved its outlook to positive.
- Q2 2026 GE Aerospace earnings call (edited transcript)
- Larry Culp (Chairman & CEO) and Rahul Ghai (CFO) on Q2 2026, July 16, 2026: orders up 17%, revenue up 24% (CES +27%, DPT +16%), operating profit $2.7 billion, EPS $2.02 (+22%), free cash flow $3 billion (+43%).
- 2026 guidance raised across the board: revenue growth high-teens; operating profit $10.55-10.75 billion; EPS $7.65-7.85; free cash flow $8.9-9.2 billion; CES operating profit $10.25-10.35 billion; DPT $1.6-1.7 billion.
- Demand is not the constraint: commercial services backlog roughly $170 billion, more than 95% of Q3 spare parts revenue in backlog, spare parts delinquency up 20% sequentially; Culp: "it's much more a supply-side challenge than it is demand."
- FLIGHT DECK and AI in operations: F110 deliveries up over 50%, LEAP turnaround times around 100 days, priority supplier material input up double digits; kaizens with GKN.
- LEAP: certified LEAP-1B durability kit expected to give about a two-fold improvement in time on wing, cutover early next year; over 40% of the LEAP-1A fleet has the kit; nearly zero LEAP aircraft grounded due to engines.
- Margin path: install engine growth, LEAP services and GE9X losses (peaking by 2028) weigh now; LEAP services margins in line with the total services portfolio by 2028 and margin expansion expected in '28 and beyond.
- LEAP shop visits expected to grow at about a 25% CAGR to 2030; external channel share from mid-teens to 30% by 2030.
- Defense: XA102 adaptive cycle engine moved to assembly and test; GEK1500 and GE426 for Collaborative Combat Aircraft reached preliminary design review milestones; CT7 selected for the UK medium helicopter.
- Q1 2026 GE Aerospace earnings call (edited transcript)
- Larry Culp (Chairman & CEO) and Rahul Ghai (CFO) on Q1 2026, April 21, 2026: orders up 87% (CES +93%, DPT +67%), revenue up 29%, operating profit $2.5 billion, EPS $1.86 (+25%), free cash flow $1.7 billion (+14%).
- Middle East conflict: full-year departures outlook cut from mid-single-digit growth to flat to low single-digit; guidance held (low double-digit revenue growth, profit $9.85-10.25 billion, EPS $7.10-7.40, free cash flow $8-8.4 billion) while trending to the high end.
- Commercial services backlog over $170 billion; spare parts are roughly 40% and internal shop visits roughly 60% of services revenue; spare parts delinquency up roughly 70% since the end of '24.
- Customer wins: American committed to more than 300 LEAP-1A engines, United selected 300 GEnx engines, Delta 60 GEnx; Ryanair services agreement for about 2,000 CFM56 and LEAP engines; a $1.4 billion T408 contract for the CH-53K.
- Investment: $1 billion in U.S. manufacturing sites and supply base for the second year, $100 million in external suppliers' equipment and tooling, $300 million in the Singapore repair facility.
- Market position cited by Ghai: 75% share of narrowbody cycles and 55% of widebody cycles; CFM56 retirements assumed at about 2% in 2026.
- GE9X: mid-seal durability issue found in January; Culp: "No change on schedule, no change on losses"; over 1,000 engines on order for the 777X.
- Aeroderivatives moved to DPT; post-spin pricing to the JV revised substantially, business sold out through the 2030s.
- GE Aerospace to acquire Consolidated Precision Products (CPP) - press release
- On September 8, 2026, GE Aerospace agreed to acquire Consolidated Precision Products (CPP), a Cleveland, Ohio maker of highly engineered castings, from Warburg Pincus and Berkshire Partners for $11.75 billion.
- Financing: $7 billion in cash and the remainder in new debt; valued at ~18x 2027 EBITDA including expected net synergies, ~26x without.
- Expected accretive to adjusted EPS and free cash flow in the first year (excluding one-time costs and deal amortization); no change to capital allocation plans; closing expected in the second half of 2027, subject to regulatory approvals.
- CPP: founded in 1991, ~6,600 employees across more than 20 facilities; superalloy, titanium, aluminum, magnesium and steel castings for commercial and military aircraft, weapon systems, business jets, helicopters and industrial gas turbines. GE has been a customer for over fifteen years.
- Rationale per Culp: castings capacity is "needed to support the strong simultaneous demand across commercial engines, aftermarket and defense", with FLIGHT DECK applied to raise output and quality and to speed new airfoil technology.
Questions about GE Aerospace
What does GE Aerospace do?
GE Aerospace designs, manufactures and services commercial and military jet engines and components, including the LEAP through CFM International, with aftermarket services approximately 70% of revenue.
What is GE Aerospace's revenue?
FY2025 total revenue was $45,855 million, up 18%. First half 2026 revenue was $25,741 million, up 23%.
How many employees does GE Aerospace have?
Approximately 57,000 at December 31, 2025, of whom approximately 30,000 in the United States.
Who leads GE Aerospace?
H. Lawrence Culp, Jr. is Chairman & CEO and Rahul Ghai is SVP & CFO; Mohamed Ali leads Commercial Engines & Services and Amy Gowder leads Defense & Systems.
Why is GE Aerospace buying CPP?
To secure castings capacity for commercial engines, aftermarket and defense; the $11.75 billion deal for Consolidated Precision Products is expected to close in the second half of 2027.
Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)