Korea Electric Power Corporation (KEPCO) account plan
Electricity generation and distribution
At a glance
KEPCO is Korea's state-controlled integrated electric utility, transmitting and distributing substantially all of its power: Won 96,568 billion 2025 sales.
Korea Electric Power Corporation (KEPCO), headquartered in Naju, buys power through the Korea Power Exchange and transmits, distributes and sells substantially all of the electricity in Korea to industrial, commercial and residential customers. Through its subsidiaries (KHNP for nuclear and hydro, five thermal generation companies, engineering and maintenance companies) it owned about 53.4% of Korea's generation capacity at end-2025, and it runs 30 overseas projects in 12 countries. 2025 sales were Won 96,568 billion (+4.3%), operating profit Won 14,011 billion and net profit Won 8,667 billion. The group had 48,650 regular employees at end-2025. The Government owns 51.1% directly and through Korea Development Bank, approves its tariffs, and the President of Korea appoints its President and CEO, Kim Dong-Cheol.
Business units
Transmission and distribution (KEPCO parent)
about 95.6% of 2025 external revenue (Won 92,351,290 million)Buys electricity from its subsidiaries and independent producers and sells it to end users over 36,183 circuit km of transmission lines and 939 substations. Industry is the largest customer segment, with sales down 2.1% in 2025 on a petrochemicals and steel slowdown. It is investing in smart meters, grid storage, AI-based substation diagnostics and microgrids.
Nuclear generation (KHNP)
Won 15,346,722 million 2025 total segment revenue, mostly intra-groupOperates 26 nuclear units and is the cheapest source in the pool, supplying 33.2% of KEPCO's purchased volume in 2025. Several units are shut down pending life extension, and H1 2026 capacity factors were weak on prolonged maintenance. KHNP signed the Dukovany #5 and #6 contract in the Czech Republic in June 2025.
Non-nuclear generation (KOSEP, KOMIPO, KOWEPO, KOSPO, EWP)
Won 28,710,970 million 2025 total segment revenue, mostly intra-groupFive companies running coal, LNG combined-cycle and renewable plants that sell to KEPCO through the pool. Under the Basic Plans 28 old coal units convert to LNG by 2036; the segment swung to an operating loss of Won 246 billion in H1 2026 as the prices KEPCO paid them fell.
Plant maintenance & engineering service
about 0.6% of 2025 external revenueKEPCO E&C, KEPCO KPS and others provide engineering and plant maintenance, sold mainly inside the group.
Others (mainly overseas business)
about 0.8% of 2025 external revenue30 projects in 12 countries with 37,339 MW of installed capacity, including 18% of the UAE's Barakah nuclear plant, Saudi gas, solar and wind projects and ADNOC's HVDC subsea transmission. KEPCO is exiting overseas coal.
Strategic priorities
- Grid build-out for carbon neutrality
- The 2035 strategy aims at a grid that supports carbon neutrality by 2050; the Eleventh Transmission and Substation Facilities Plan (May 2025) includes supply to semiconductor clusters, and the 2026-2030 plan calls for timely construction of key national grids.
- Cost-based and restructured tariffs
- KEPCO seeks a cost-based tariff and is in talks with the government on a tariff increase. A TOU restructuring took effect April 16, 2026, and regional differentiation of electricity pricing is to be introduced by the end of 2026.
- Financial soundness
- A five-year financial soundness plan (asset sales, spending restructuring, headquarters downsizing) has run since 2022, and a mid-to-long term financial management plan (2026-2030) was adopted in June 2026; the bond cap falls back to 2x capital and reserves after 2027.
- Overseas and nuclear exports
- Refocus overseas business on eco-friendly projects and nuclear, with the Czech Dukovany contract, Saudi gas, wind and solar projects, and cooperation with the government on a streamlined nuclear export framework.
- New energy businesses and digitalisation
- Platform businesses such as EV charging and distributed energy, digitalisation across the supply chain, a KEPCO Technology Holding Company created in May 2026 and an AI Committee set up in June 2026.
Latest results
In H1 2026 (six months to June 30, 2026) consolidated sales were Won 46,317 billion against Won 46,174 billion a year earlier, while operating profit fell to Won 4,913 billion from Won 5,889 billion and net income to Won 2,797 billion from Won 3,538 billion. Power sales volume fell 0.6% to 266.7 TWh on weaker industrial demand. Fuel costs rose 8.8% as the Middle East conflict pushed LNG and coal prices up, and nuclear capacity factors were weak on prolonged maintenance. KHNP's operating profit rose while the thermal subsidiaries swung to a loss. Management expects the system marginal price to keep rising into Q3 and gives no earnings guidance.
Investments and deals
- Rising group capex
- Capex was Won 18,701 billion in 2025; the budget is Won 23,099 billion for 2026, Won 27,391 billion for 2027 and Won 27,625 billion for 2028, including Won 18,680 billion for transmission and Won 12,846 billion for distribution.
- New nuclear and LNG capacity
- One 1,400 MW nuclear unit in each of 2026 and 2027, and LNG combined-cycle additions of 1,562 MW (2026) to 4,749 MW (2029).
- R&D
- Won 860 billion of R&D in 2025 and Won 1,230 billion planned for 2026, with 1,503 R&D staff.
- Grid modernisation
- Smart-meter communications for 20.5 million households (AMI spend Won 1,800 billion to end-2025), 1,404 MW of grid energy storage and industrial-complex microgrids in Gumi, Yeosu and Gwangyang.
- Saudi Arabia projects
- Rumah 1 and Nairyah 1 gas plants (3,780 MW, US$4.1 billion, operation expected Q2 2028), Jafurah Phase 2 cogeneration with Saudi Aramco (US$758 million), and the Dawadmi wind project, for which a foreign subsidiary was approved in January 2026.
Challenges and risks
- Heavy debt
- Consolidated borrowings were KRW 133.3 trillion in mid-2026, and the statutory bond cap falls to 2x capital and reserves by end-2027.
- Fuel costs it cannot pass through
- Tariffs are approved by the government, so fuel price increases may not be passed on; the Middle East conflict that began in February 2026 raised LNG and coal prices.
- Weak industrial demand
- Industrial sales fell 2.1% in 2025 and H1 2026 volume fell 0.6%; large customers above 30,000 kVA may buy directly through the Korea Power Exchange.
- Nuclear availability and provisions
- Several reactors await life extension, H1 2026 maintenance added about KRW 101.3 billion of cost, and KHNP has accrued Won 28,541 billion for decommissioning and spent-fuel costs.
- Environmental regulation and the Barakah dispute
- Emissions trading, coal output caps and a renewable portfolio standard rising to 25% by 2030 weigh on costs, and talks continue over additional construction costs at the UAE Barakah plant.
What leadership says
“We are not really focusing on reducing the overall bond issuance amount”
“the increase in LNG prices triggered by the Middle Eastern conflict and also higher bituminous coal prices as well.”
Where a supplier can help
- Transmission and substation equipment
- Tied to the grid build-out priority and the Won 18,680 billion transmission capex: equipment, construction and project delivery for national grids and semiconductor-cluster supply.
- Grid digitalisation and AI
- Tied to the digitalisation priority, the new AI Committee and the AI-based substation diagnostics: analytics, asset-monitoring and smart-meter data solutions.
- Demand response and tariff design tools
- Tied to the TOU restructuring and regional pricing plans: billing, demand-response and customer-service software to roll out new tariffs.
- Cost reduction under the financial plan
- Tied to the heavy-debt challenge and the 2026-2030 financial management plan: suppliers that can show measurable savings in operations, maintenance or procurement.
- Nuclear and overseas project services
- Tied to the nuclear export and Saudi project investments: engineering, maintenance and supply-chain partners for new builds abroad and life extensions at home.
Tamtam's reading of the priorities and challenges above, not the company's own words.
Selling to companies like Korea Electric Power Corporation (KEPCO)?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companiesKey documents
Read in full by Tamtam; each summary links to the document itself.
- Annual Report on Form 20-F for fiscal year 2025
- KEPCO is Korea's state-controlled integrated utility (Government 51.1% directly and via Korea Development Bank): it transmits and distributes substantially all of Korea's electricity and, through six wholly-owned generation subsidiaries (KHNP for nuclear/hydro; KOSEP, KOMIPO, KOWEPO, KOSPO, EWP for thermal), owns about 53.4% of national generation capacity.
- FY2025: sales Won 96,568 billion (+4.3%), operating profit Won 14,011 billion (operating margin 14.5% vs 9.1%), net profit Won 8,667 billion vs Won 3,622 billion in 2024; electricity sold 549,417 GWh (-0.1%) at an average Won 170.37/kWh (+4.6%).
- The recovery came from lower fuel and power-purchase costs (fuel costs 20.1% of sales vs 30.8% in 2023) while the Government held the Fuel Cost Adjusted Charge at +Won 5.0/kWh even though the formula pointed to cuts every quarter from Q4 2023 to Q2 2026.
- Tariffs remain Government-approved and lag costs: the 20-F names fuel prices, tariff policy, Won depreciation, debt refinancing and the erosion of its position by independent power producers and direct power purchase as main risks.
- Capex steps up sharply: Won 18,701 billion in 2025, budgeted Won 23,099 billion (2026), Won 27,391 billion (2027) and Won 27,625 billion (2028), Won 78,115 billion over three years, of which Won 31,526 billion for transmission and distribution.
- The Eleventh Basic Plan (2024-2038) targets nuclear capacity of 35.2 GW and renewables of 121.9 GW by 2038 and a carbon-free share of 70.7%, requiring a major grid build-out; a TOU tariff reform shifting demand to daytime solar hours took effect from April 16, 2026.
- Overseas: 30 projects in 12 countries (37,339 MW); KHNP signed the Dukovany #5-#6 nuclear contract (about KRW 25,861 billion) in June 2025; Saudi wins include Rumah 1/Nairyah 1 (3,780 MW), Sadawi solar (2,000 MW) and Dawadmi wind (1,500 MW); a KRW 1,450 billion provision covers prolongation costs on nuclear projects (UAE Barakah).
- Debt ceiling on bonds raised to five times capital and reserves until December 31, 2027; 2026 R&D budget Won 1,230 billion around grids, AI for energy, carbon neutrality and new energy businesses; 48,650 regular employees group-wide.
- Half-year business report, January 1 to June 30, 2026 (Form 6-K)
- KEPCO's English summary of its Korean half-year business report (January 1 to June 30, 2026), filed on Form 6-K on September 15, 2026.
- H1 2026 consolidated sales Won 46,317 billion (vs Won 46,174 billion), operating profit Won 4,913 billion (vs Won 5,889 billion), net income Won 2,797 billion (vs Won 3,538 billion).
- By segment: electricity sales (KEPCO) Won 44,996 billion sales and Won 2,123 billion operating profit; nuclear generation Won 8,152 billion / Won 3,089 billion; thermal generation Won 13,479 billion with an operating loss of Won 246 billion; plant maintenance & engineering Won 1,604 billion / Won 142 billion.
- KEPCO bought 274,623 GWh for Won 37,750 billion in H1; KHNP's selling price rose to Won 96.47/kWh from Won 82.87/kWh while thermal subsidiaries' prices fell (e.g. KOSPO Won 149.65/kWh from Won 175.84/kWh).
- Average retail prices were broadly flat: industrial Won 179.01/kWh, residential Won 156.69/kWh.
- Total assets Won 262,561 billion and liabilities Won 210,716 billion at June 30, 2026; Won and foreign-currency bonds kept being issued after the half (e.g. a US$300 million global bond in July 2026).
- Board decisions in H1: a Saudi subsidiary for the Dawadmi wind project, a KEPCO Technology Holding Company for new energy businesses, an AI Committee and a 2026-2030 mid-to-long-term financial management plan; most standing and independent directors were renewed between April and June 2026.
- The notes flag that the financial impact of the Middle East armed conflict that began in February 2026 cannot be estimated; FY2025 dividend was Won 1,542 per share (Won 989.9 billion).
- Q2 2026 earnings call transcript
- KEPCO's Q2/H1 2026 results call (August 12, 2026), led by Head of Finance Heung-Bok Oh and Senior IR Manager Taeseop Eom, with consecutive interpretation.
- H1 2026: revenue KRW 46,317.3 billion (+0.3%), consolidated operating income KRW 4,912.7 billion, net income KRW 2,796.5 billion; other revenue including overseas business +16.7% to KRW 2,353.2 billion.
- Fuel costs rose 8.8% to KRW 10,142.9 billion on higher LNG and coal prices linked to the Middle East conflict; SMP was about KRW 112.3/kWh in H1 but around 151 in August versus 117 a year earlier.
- Power sales volume fell 0.6% to 266.7 TWh on weaker industrial demand; a slight full-year increase is expected.
- Prolonged preventive maintenance weighed on nuclear output (KRW 101.3 billion extra cost); Saeul Unit 3 joins the grid and the full-year nuclear capacity factor is guided at low- to mid-80%.
- Consolidated borrowings KRW 133.3 trillion (stand-alone KRW 84.8 trillion); the bond cap falls from 5x to 2x capital and reserves by end-2027, which management plans to meet through operating profit and tariff increases discussed with the government.
- A regional electricity pricing system goes to public hearings and should be introduced by the end of 2026; grid "mega project" capex will be spread over years.
- Q4 2025 earnings call transcript
- KEPCO's FY2025/Q4 results call (February 26, 2026), presented by Head of Finance Si-young Yang and Senior IR Manager Eom Tae-seop, Korean with consecutive English interpretation.
- FY2025 preliminary figures: consolidated operating income KRW 13.5248 trillion, net income KRW 8.7372 trillion, revenue +4.3% to KRW 97.4345 trillion; fuel costs -13.8%, purchased power -1.8%.
- Power sales 549.4 TWh (-0.1%) on weaker industrial demand; a slight increase expected in 2026.
- 2026 guidance: nuclear capacity factor mid to high 80%, coal mid 40%, LNG early to mid 20%; nuclear share of the mix to rise.
- Q4 costs included higher greenhouse-gas provisions (KRW 340.6 billion) and nuclear site restoration provisions (up KRW 904.5 billion to KRW 24.076.9 trillion).
- Consolidated borrowings KRW 129.8 trillion; the bond issuance ratio should be "just over 3x" capital and reserves after the dividend.
- Dividend payout 13.65% (16.5% the year before) but DPS rose to about KRW 1,541; 2026 dividends depend on the government.
- Seasonal, time-of-use and regional tariff schemes are being designed with the government; KEPCO will cooperate on streamlining Korea's nuclear export strategy.
Questions about Korea Electric Power Corporation (KEPCO)
What does KEPCO do?
KEPCO transmits, distributes and sells substantially all of the electricity in Korea and, through its subsidiaries, generates power from nuclear, coal, LNG and renewables, plus overseas power projects.
What is KEPCO's revenue?
2025 sales were Won 96,568 billion (+4.3%) with operating profit of Won 14,011 billion. H1 2026 sales were Won 46,317 billion.
How many employees does KEPCO have?
The group had 48,650 regular employees at end-2025; KEPCO itself (separate) had 22,949 employees in H1 2026.
Who owns and leads KEPCO?
The Government owns 51.1% directly and through Korea Development Bank. Kim Dong-Cheol has been President and CEO since September 19, 2023.
What is KEPCO's strategy?
Its 2035 strategy aims at a carbon-neutral grid, cost-based tariffs, new energy platform businesses, overseas projects without coal, digitalisation and financial stability.
Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)