Advanced Nuclear Energy Reactors

At a glance

newcleo develops 200 MWe lead-cooled fast reactors and recycled MOX fuel; Nasdaq-listed (NWCL), over 900 staff, €32.8 million 2025 revenue.

newcleo, founded in 2021, develops the LFR-AS-200, a modular 200 MWe (480 MWt) lead-cooled fast reactor fuelled with MOX made from recycled spent nuclear fuel, and plans to build its own MOX fuel factories. It intends to license the reactor IP to utilities and industrial users such as data centers, steel, cement and chemicals, sell components, EPCM and advisory services, and supply the fuel; no reactor or MOX plant is built or contracted yet. Today's revenue comes from acquired engineering and manufacturing subsidiaries: €32.8 million in 2025 (down from €46.7 million in 2024), with a net loss of €140.0 million. The company has over 900 employees and contractors across the UK, France, Italy, Switzerland, Slovakia and the U.S., and has traded on Nasdaq as NWCL since September 22, 2026 after merging with the NewHold Investment Corp III SPAC.

Business units

Strategic priorities

Complete the PRECURSOR demonstrator
Finish the 10 MWt non-nuclear, electricity-generating demonstrator at ENEA Brasimone by end-2026, the last major milestone before first-of-a-kind reactor licensing; its main vessel and turbine are installed.
Licensing in France and the U.S.
Obtain ASNR's opinion on the LFR safety options filed in December 2025 and pursue NRC pre-application: Regulatory Engagement Plans were filed for the LFR-AS-200 on July 14 and for the Aiken MOX plant on August 6, 2026.
Shift the first plants to the U.S.
Plans for the first MOX factory and first commercial reactor moved from France to the U.S., around Savannah River, with the first fuel line planned for 2031 and the first commercial plant for 2032.
Convert the pipeline into contracts
Turn non-binding frameworks (about 9.2 GW, or 46 reactors) into definitive agreements, including the Newvys JV in Slovakia for up to four reactors at Bohunice, Oklo, IP3 / Cybernetic Intelligence for AI data centers, ALTRA in Lithuania and Danieli.
Vertical integration of the supply chain
Keep acquiring nuclear suppliers to control cost, schedule and quality, as with S.R.S, Fucina Italia, Rütschi and Bonifait Pesage.

Latest results

In the six months to June 30, 2026, revenue from products and services rose about 46% to €19.4 million from €13.3 million, on equipment manufacturing for third parties and consultancy, and gross profit rose about 48% to €6.1 million. R&D expenses were €34.6 million and SG&A rose about 21% to €59.2 million, mainly on share-based payments. The net loss was €82.0 million against €74,293 thousand in H1 2025. Cash was €66.5 million at June 30, 2026, and preliminary unaudited cash was about €233 million at September 30, 2026 after the SPAC closing, which brought about $247 million of gross proceeds. Tangible capital expenditure rose 37% to €25.3 million.

Investments and deals

SPAC listing and capital raising
The merger with NewHold Investment Corp III closed on September 21, 2026 with about $247 million of gross proceeds, including a $216 million PIPE; total funds raised since founding exceed $1 billion. In 2026 newcleo also raised €45.1 million in share issues.
U.S. fuel facility with Oklo
newcleo plans to invest $2.2 billion to $2.6 billion over 5 to 6 years in a U.S. facility with Oklo to supply MOX and other advanced fuels; the two were selected by the DOE on May 26, 2026 for advanced negotiations on surplus plutonium.
Test facilities in Italy and France
€81.5 million has been invested at ENEA Brasimone since 2022 (OTHELLO lead loop and PRECURSOR), and the FASTER MOX research and qualification centre at Chusclan became operational in 2025.
Bonifait Pesage acquisition
Agreed in June 2026 to buy the French nuclear-grade scales maker (about €2.1 million revenue in 2025), with closing expected in Q4 2026.

Challenges and risks

Going-concern uncertainty and funding needs
The F-1 discloses a material uncertainty on going concern and says the company needs significant additional funding from equity, debt, project finance and non-dilutive sources.
Large capital requirements
The CEO puts the fuel factory at about 2.5 billion dollars and the first reactor at about the same.
No plant or binding customer yet
No LFR or MOX plant is built and there is no binding contract with a customer to operate one; the 9.2 GW pipeline is non-binding.
Falling engineering revenue
Subsidiary revenue fell 30% in 2025 to €32.8 million because capacity went to PRECURSOR and OTHELLO.
Technical and regulatory risk
ASNR's opinion on the reactor design is still awaited, and an outside expert quoted by Forbes Italia notes lead is very corrosive and only Russia has operating experience.

What leadership says

“a defining milestone”

Stefano Buono, Founder and CEO · On the Nasdaq listing, H1 2026 results release, October 2, 2026

“direct control over cost, schedule, and quality”

Elisabeth Rizzotti, Co-founder, Deputy CEO and COO · On PRECURSOR components built by in-house subsidiaries, H1 2026 results release, October 2, 2026

“What we are going to do is sell the reactors, not operate them”

Stefano Buono, Founder and CEO · Italian YouTube interview, July 19, 2026 (translated)

“the first reactor we build will already be commercial, will generate revenue”

Stefano Buono, Founder and CEO · Forbes Italia, September 18, 2026 (translated)

Where a supplier can help

Nuclear-grade components and manufacturing
Completing PRECURSOR and preparing first-of-a-kind reactors requires pumps, vessels, steam generators and fuel-handling equipment; suppliers can complement the in-house subsidiaries where vertical integration does not reach.
U.S. licensing and site development
The move of the first MOX plant and reactor to the U.S. around Savannah River and the NRC pre-application create needs for regulatory, engineering, environmental and construction services.
Project finance and capital markets support
With a going-concern warning and multi-billion-dollar plant costs to fund through debt and project financing, financial advisory and structuring services are directly relevant.
Data center and industrial offtake
The pipeline includes AI data centers with IP3 / Cybernetic Intelligence and steel with Danieli; partners in data-center infrastructure and heavy industry can help convert non-binding frameworks into contracts.

Tamtam's reading of the priorities and challenges above, not the company's own words.

Selling to companies like newcleo?

Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.

Find similar companies

Key documents

Read in full by Tamtam; each summary links to the document itself.

Questions about newcleo

What does newcleo do?

newcleo develops the LFR-AS-200, a 200 MWe lead-cooled fast reactor fuelled with MOX made from recycled spent nuclear fuel, and plans to license the design, supply components and services, and sell the fuel from its own MOX factories.

What is newcleo's revenue?

Revenue, which comes from its acquired engineering and manufacturing subsidiaries, was €32.8 million in 2025 with a net loss of €140.0 million. In H1 2026 revenue was €19.4 million.

How many employees does newcleo have?

Over 900 employees and contractors, with 16 offices and three factories across the UK, France, Italy, Switzerland, Slovakia and the U.S.

Who leads newcleo?

Stefano Buono is co-founder and CEO, Elisabeth Rizzotti is co-founder, Deputy CEO and COO, Jon Stranske is Group CFO and Jeffrey Lyash is Chairman.

When will newcleo build its first reactor?

The first fuel line is planned for 2031 and the first commercial plant for 2032, both now planned in the U.S.; the PRECURSOR demonstrator is due for completion by end-2026.

Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)