SBM Offshore account plan
Offshore energy solutions design
At a glance
SBM Offshore builds, leases and operates FPSOs: 16-unit fleet, 8,178 people, FY2025 Directional revenue US$5,066m.
SBM Offshore, headquartered in Amsterdam and listed on Euronext Amsterdam, designs, builds, installs, leases and operates FPSOs (Floating Production Storage and Offloading units) and related ocean infrastructure such as turret moorings and offloading terminals. Its clients are oil companies including Petrobras, ExxonMobil, TotalEnergies, Shell, Woodside and Azule Energy, with a fleet of 16 FPSOs around the Atlantic Basin (Brazil, Guyana, Angola). In FY2025 Directional revenue was US$5,066m (2024: US$6,111m), Directional EBITDA US$1,709m and Directional net profit US$677m; under IFRS revenue was US$5,903m. It employed 8,178 people across 23 countries at end-2025, more than 4,100 of them on the operating fleet.
Business units
Turnkey
55% of FY2025 Directional revenue (US$2,772m)Engineering, procurement, construction and installation of FPSOs, FSOs, turret moorings and terminals, sold under Sale and Operate or ahead of a lease, plus the Imodco terminals business and the installation activity. Directional Turnkey EBITDA was US$561m in FY2025 (2024: US$724m); in the first nine months of 2026 Turnkey revenue rose 132% to US$4,565m on the ONE GUYANA sale and new Petrobras and ExxonMobil contracts.
Lease and Operate
about 45% of FY2025 Directional revenue (US$2,295m)Leasing and operating FPSOs for oil companies, mostly on fixed day-rates, plus O&M-only contracts on client-owned units. Directional EBITDA was US$1,235m in FY2025; the fleet ran at 99.1% production uptime and revenue rose 10% to US$1,772m in the first nine months of 2026.
Strategic priorities
- Win the right FPSO projects
- Management counts 41 FPSO projects expected to be sanctioned over three years, 16 of them in SBM's sweet spot, mainly in Brazil, Guyana, Suriname and West Africa, and wants to keep above 50% market share of those.
- Scale Fast4Ward standardization
- Thirteen Fast4Ward hulls have been ordered; five are under construction, two of them unallocated to support tendering. The programme is presented as a way to scale execution capacity without a matching rise in overhead.
- Execute five projects in parallel
- Jaguar (ExxonMobil, first oil 2027), Chalchi (Woodside), GranMorgu (TotalEnergies, first oil 2028), and SEAP II and SEAP I (Petrobras, handover 2030 and 2031) are in progress, with Longtail FEED on plan.
- Shareholder returns
- SBM is committed to returning at least US$2.1 billion to shareholders through 2031; the 2026 return is US$2.57 per share through a US$270 million buyback and US$200 million of dividends.
- Decarbonize and diversify
- Targets are net zero by 2050 and 50% lower Scope 3 downstream intensity by 2030 against 2016 (currently -28%); new-energy work includes the Ekwil floating wind JV with Technip Energies and a Blue Ammonia FPSO design.
- Digital foundation
- SBM is building an AI-ready data foundation with Cognite and a digital alliance with SLB, and fully deployed its new global ERP in June 2026.
Latest results
In the first nine months of 2026, Directional revenue was US$6,337m, up 77% from US$3,571m, with Turnkey up 132% and Lease and Operate up 10%. Directional net debt was US$3.6 billion at the end of Q3, 36% lower than at year-end 2025, mainly due to the February 2026 sale of FPSO ONE GUYANA to ExxonMobil. The pro-forma Directional backlog reached a record US$35.6 billion at June 30, 2026. Fleet oil uptime was 99.0% year-to-date. Guidance for 2026 was raised to Directional revenue of around US$7.9 billion and Directional EBITDA above US$1.95 billion; SEAP and Longtail will not reach margin recognition in 2026.
Investments and deals
- New installation vessel
- In June 2026 SBM formed a joint venture with Solstad Offshore and ordered a next-generation multi-purpose deepwater installation and construction vessel, due in the first half of 2029.
- Fast4Ward hulls
- Five hulls are under construction at three yards: one for Longtail, two for SEAP and two to support tendering, with options to order more.
- Portfolio sales
- FPSO ONE GUYANA was sold to ExxonMobil on February 4, 2026 for US$2,321m of cash consideration; 45% of FSO Chalchi was sold to NYK in June 2026; Kikeh, Aseng and Thunder Hawk left the portfolio in 2025.
- Project financing
- FSO Chalchi project financing of US$465m was secured on June 29, 2026, and a new US$1.1 billion RCF with 13 banks was signed.
Challenges and risks
- Portfolio concentration
- The risk map names the concentration of fossil-fuel-related business in Brazil and Guyana; three customers each made up more than 10% of FY2025 Directional revenue.
- More competition from yards
- Management says the Sale and Operate model lets construction yards sell assets directly, making the market more competitive than it used to be.
- Supply-chain constraints
- The risk map lists supply-chain constraints on MPF hulls and critical equipment, alongside project performance and process safety.
- Safety at construction yards
- A subcontractor died in June 2026 at a construction yard in China, and a 2025 incident in Singapore was reclassified as a Permanent Impairment.
- Margin timing
- New awards book revenue but no margin until 25% completion; SEAP II should pass that point towards the end of 2027 and SEAP I in the second half of 2028.
What leadership says
“Scale only creates value when accompanied by discipline”
“We will remain selective, focusing on projects with the right risk-return balance”
“Fast4Ward is not just a standardized product, it is also a way of working”
“our tendering pipeline contains only Sale and Operate prospects”
Where a supplier can help
- Yard and equipment capacity
- With five hulls under construction and supply-chain constraints on MPF hulls and critical equipment named as a risk, suppliers of critical FPSO equipment and fabrication capacity are relevant to the Fast4Ward programme.
- Engineering subcontracting
- Executing five projects in parallel while chasing 16 sweet-spot prospects creates demand for controlled outside engineering hours and carved-out scope.
- Digital and data on the fleet
- The AI-ready data foundation, the new global ERP and robotics on the fleet open room for data, integration and operations-software providers.
- Yard safety and quality control
- The June 2026 fatality at a Chinese yard points to contractor safety management and quality-control services across partner yards.
Tamtam's reading of the priorities and challenges above, not the company's own words.
Selling to companies like SBM Offshore?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companiesKey documents
Read in full by Tamtam; each summary links to the document itself.
- SBM Offshore Annual Report 2025
- SBM Offshore (Amsterdam, listed on Euronext Amsterdam since 1965) designs, builds, installs, leases and operates FPSOs (Floating Production Storage and Offloading units) and related ocean infrastructure across the full lifecycle; 8,178 people across 23 countries at end-2025, fleet of 16 FPSOs.
- FY2025 Directional revenue US$5,066m (2024: US$6,111m) and Directional EBITDA US$1,709m (2024: US$1,896m); Directional net profit US$677m. Under IFRS, revenue US$5,903m (+23%) and net profit attributable to shareholders US$922m (2024: US$150m).
- Two reporting segments: Turnkey (Directional revenue US$2,772m, 55% of the total) and Lease and Operate (US$2,295m); pro-forma Directional backlog US$31.1 billion, with cash flow visibility up to 2050.
- 2025 was a delivery year: FPSOs Almirante Tamandaré and Alexandre de Gusmão (Petrobras) and ONE GUYANA (ExxonMobil), an aggregate 655,000 boepd of capacity, came online within six months; fleet production uptime 99.1%, fleet oil production capacity 2,667,000 bopd.
- Under construction: FPSO Jaguar (ExxonMobil, first oil 2027), FPSO GranMorgu (TotalEnergies, Suriname, first oil 2028) and FSO Chalchi (Woodside, Mexico, 2028); Fast4Ward standardized MPF hulls are the core of the execution model.
- Revenue is concentrated: Guyana/Suriname US$2,901m and Brazil US$1,385m of Directional revenue; three customers each above 10% of revenue. Portfolio concentration in Brazil and Guyana is named as a strategic risk.
- Strategy "True. Blue. Transition.": Advancing the Core (FPSOs) and Pioneering More (carbon capture FPSO with up to 80% lower emissions, Blue Ammonia FPSO, floating power with Microsoft, Ekwil floating wind JV with Technip Energies, desalination with Veolia); digital alliances with Cognite and SLB.
- Proposed cash return of c. US$440 million for 2026 (US$270m buyback plus US$200m aggregate dividend), a 57% increase; 2026 guidance: Directional revenue around US$6.5 billion and Directional EBITDA around US$1.8 billion, excluding new FPSO awards.
- Management Board: Øivind Tangen (CEO, proposed for a second four-year term) and Douglas Wood (CFO); COO Alexander Glenn and CBO Olivier Icyk complete the Executive Leadership Team.
- SBM Offshore 2026 Half Year Earnings
- H1 2026 Directional revenue US$4,904m (+112%) and Directional EBITDA US$1,310m (+92%); Directional net profit US$826m, or US$4.90 per share (H1 2025: US$274m). IFRS revenue US$2,785m (-2%).
- Turnkey drove the jump: Directional Turnkey revenue US$3,713m (76% of the total), from the sale of FPSO ONE GUYANA to ExxonMobil, the 45% sale of FSO Chalchi to NYK, the SEAP awards and GranMorgu progress.
- New business: Petrobras awarded FPSOs SEAP I and SEAP II (Sale and Operate, 120,000 bpd each, handover 2031 and 2030), and ExxonMobil Guyana awarded the FEED for the Longtail FPSO; N'Goma FPSO was extended to December 2028.
- Record pro-forma Directional backlog of US$35.6 billion (FY2025: US$31.1 billion) and US$8.0 billion Directional net cash backlog.
- Directional net debt fell to US$3,680m from US$5,651m, after the ONE GUYANA proceeds repaid the US$1,740m project financing.
- 2026 guidance raised: Directional revenue to around US$7.6 billion (from above US$6.9 billion) and Directional EBITDA to around US$1.9 billion (from around US$1.8 billion).
- Thirteen Fast4Ward hulls ordered to date, two of them to support active tendering; a JV with Solstad Offshore will build a new deepwater installation vessel, due in H1 2029.
- Fleet oil uptime 98.9%; a fatal incident involving a subcontractor occurred at a construction yard in China in June 2026.
- Shareholder returns: a US$100m interim dividend payable on September 3, 2026, the US$270m buyback about 44% complete, and the company "on track to deliver a minimum of US$2.1 billion to shareholders over the six-year period to 2031".
- SBM Offshore Third Quarter 2026 Trading Update
- Year-to-date (9M 2026) Directional revenue US$6,337m, up 77% from US$3,571m: Turnkey US$4,565m (+132%) and Lease and Operate US$1,772m (+10%).
- 2026 guidance raised again: Directional revenue to around US$7.9 billion (around US$2.4bn Lease and Operate, around US$5.5bn Turnkey) and Directional EBITDA to above US$1.95 billion.
- SEAP I, SEAP II and Longtail add revenue but no EBITDA in 2026, since they remain below the 25% stage of completion needed for margin recognition.
- Directional net debt US$3.6 billion, down 36% from year-end 2025 after the FPSO ONE GUYANA sale; the hedge ratio of floating-rate debt is above 90%.
- Five projects in execution and all on plan: Jaguar more than 75% complete (first oil 2027), Chalchi and GranMorgu more than 50% (GranMorgu first oil 2028), SEAP II (P-87, handover 2030) and SEAP I (P-81, 2031) below 25%, plus the Longtail FEED.
- Fleet oil uptime 99.0% year-to-date; the fleet produces more than two million boepd; no fatalities or permanent impairment injuries in Q3.
- Market: "16 opportunities in our sweet spot expected over the next three years"; two unallocated hulls under construction.
- Shareholder returns: US$100m interim dividend paid, buyback about 72% complete, 6,000,000 shares cancelled (3.5% of capital), and at least US$2.1 billion to be returned through 2031.
- SBM Offshore Full Year 2025 Earnings Call (transcript)
- Tangen: SBM brought three of the world's largest FPSOs online in six months in 2025, adding 655,000 bpd and delivering "around 45% of all new deepwater production capacity in the world".
- He calls SBM "the world's largest contractor by global oil production capacity": 16 units, about 2% of global oil production, 2.7 million bopd of capacity and over 4.1 billion scf/d of gas handling; Guyana debottlenecking added over 100,000 bopd.
- Market view: 16 prospects in SBM's sweet spot over three years; 35% of new oil production this decade expected from deepwater; FPSO topsides weight has grown 3x in a decade.
- Capacity: in-house capacity for six projects in parallel, two Fast4Ward MPF hulls in hand, a third yard (COSCO) added to SWS and CMHI, and scope can be carved out to partners as on ONE GUYANA (McDermott) and Block 58 (Technip Energies).
- Wood: cash return up 57% to US$440m (US$2.57 per share), including a one-off US$100m from moving to an interim dividend; a minimum of more than US$2.1 billion to be returned over the six years to 2031.
- Backlog US$31.1 billion, expected to generate US$8.4 billion of net cash; pro-forma net debt about US$3.9 billion after the ONE GUYANA sale.
- 2026 baseline guidance: Directional revenue around US$6.5 billion and EBITDA around US$1.8 billion, excluding new awards; growth to come from "shorter cycle, Sale and Operate awards".
- SBM was the lowest bidder on Petrobras' Sépia-2 and Atapu-2; "The timing is entirely on our client side".
- New ocean infrastructure markets are options only: "Up to the end of this decade, SBM will be a very sort of FPSO focused, FPSO revenue driven, company."
- SBM Offshore Third Quarter 2026 Trading Update Call (transcript)
- Tangen: 2026 Directional revenue guidance up by US$300 million to around US$7.9 billion and EBITDA guidance to above US$1.95 billion; the extension of the Longtail FEED is "the main component" of the revenue increase (Wood).
- Five projects in execution and the 13th Fast4Ward hull ordered; Fast4Ward is "an industrial way of working" that gives "a pathway to scaling execution capacity without a corresponding increase in overhead costs".
- Market: 41 FPSO projects expected to be sanctioned in three years, 16 of them in SBM's sweet spot; strongest pipeline in Brazil, Guyana, Suriname and West Africa. SBM aims to stay "above 50% market share" of its sweet spot as "a minimum".
- Hulls: five under construction, two for SEAP, MPF 6 for Longtail, and MPF D (CMHI) and MPF 7 (SWS) unallocated.
- Competition from offshore yards selling assets under Sale and Operate is "maybe more competitive today than it used to be"; SBM's answer is lifecycle performance, repeat learning and yard continuity.
- Petrobras bonus payments for strong performance after debottlenecking are booked in Lease and Operate and are "not a Q3 kind of specificity".
- SEAP II should pass 25% completion towards the end of 2027 and SEAP I in H2 2028; Wood says turnkey results should be read on "a rolling maybe four-year basis".
- Net debt to stay around US$3.6 billion; shareholder returns to be reassessed in the full-year 2026 capital allocation review, with at least US$2.1 billion through 2031.
- Macro: energy security, data-centre power demand and the Atlantic Basin's position strengthen the outlook; Tangen sees "oil in the mix for a very long time".
Questions about SBM Offshore
What does SBM Offshore do?
SBM Offshore designs, builds, installs, leases and operates FPSOs and related ocean infrastructure for oil companies, covering the full lifecycle from engineering to decommissioning. It runs a fleet of 16 FPSOs in Brazil, Guyana and Angola.
What is SBM Offshore's revenue?
FY2025 Directional revenue was US$5,066m and IFRS revenue US$5,903m. For 2026 the company guides to Directional revenue of around US$7.9 billion.
How many employees does SBM Offshore have?
SBM Offshore employed 8,178 people across 23 countries at end-2025, more than 4,100 of them working on the operating fleet.
Who leads SBM Offshore?
Øivind Tangen has been CEO since April 2024 and Douglas Wood has been CFO since 2016. The Supervisory Board is chaired by Roeland Baan.
What is SBM Offshore's strategy?
Its strategy rests on Advancing the Core (oil and gas production) and Pioneering More (the wider Blue Economy), with Fast4Ward standardized hulls and selective bidding on FPSO projects at its centre.
Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)