Talgo account plan
Designing high-speed trains
At a glance
Talgo is a Spanish maker and maintainer of lightweight high-speed and intercity trains, with EUR 618.2m revenue in FY2025 and a record EUR 6,477m backlog.
Talgo, S.A. designs, manufactures and maintains lightweight high-speed and intercity trains on its own Avril and Talgo 230 platforms, and supplies maintenance equipment such as underfloor wheel lathes. Its customers are mostly public-sector railway operators, with trains running in Spain, Germany, Denmark, Kazakhstan, Uzbekistan, Saudi Arabia, Egypt and the USA. FY2025 revenue was EUR 618.2m (EUR 669.2m in 2024), with a net loss of EUR 100.6m after extraordinary charges, and the group had 3,594 employees at year-end 2025. In December 2025 a Basque investor consortium bought 29.8% of the shares and the state-owned SEPI entered the capital; Jose Antonio Jainaga Gomez chairs the board.
Business units
Rolling stock
about 90% of FY2025 revenue (EUR 555.0m)Manufacture of high-speed, intercity and regional trains plus their maintenance, and refurbishment of third-party rolling stock. Projects under way include 60 trains for Deutsche Bahn, 16 Talgo 230 trains for DSB, up to 65 trainsets for FlixTrain, 20 more high-speed trains for SAR and an order from Trafikverket in Sweden. H1 2026 revenue rose to EUR 348.9m (EUR 238.3m).
Auxiliary machines and others
about 10% of FY2025 revenue (EUR 63.2m)Manufacture and maintenance of underfloor wheel lathes, measurement equipment and other equipment, plus repairs, modifications, spare parts and TSMART train-to-ground monitoring systems. Lathes went to Hungary, Peru, the Philippines and Spain in 2025; H1 2026 revenue was EUR 27.0m (EUR 31.8m).
Strategic priorities
- Double industrial capacity
- Talgo intends to double industrial capacity by the end of 2028, with new investment at the Rivabellosa and Las Matas plants and about 200 hires in 2026.
- Delivery punctuality
- The chairman's stated objective is to improve delivery punctuality "drastically" to protect margins, after the Renfe Avril order ran about four years late.
- New Strategic Plan on shared platforms
- A Strategic Plan is being drawn up around new products on shared platforms for the Intercity and High Speed segments, including a new 350 km/h train to be designed within three years for Renfe's tender.
- Win European tenders
- The 2026-2027 pipeline is an estimated EUR 9,600m, with Europe and the CIS 80% by geography; 9M 2026 order intake of EUR 2,584m already exceeded the initial EUR 1,500-2,000m target.
- 2026 financial targets
- FY2026 guidance is revenue of EUR 700-800m, an EBITDA margin excluding extraordinaries of 7.5-8.5% and NFD/EBITDA below 5.5x.
Latest results
In the nine months to September 2026 revenue rose 29.1% to EUR 572.0m from EUR 443.1m, driven by manufacturing execution, maintenance and refurbishment. EBITDA was EUR 46.2m (8.1% margin) against a loss of EUR 3.3m a year earlier, or EUR 51.7m (9.0%) excluding extraordinaries. The backlog reached a record EUR 6,477m (+45% vs FY2025), 98% of it rolling stock. In H1 2026 the net result was a EUR 27.01m loss (EUR 65.72m loss) and net financial debt was EUR 497m. FY2026 guidance was maintained at EUR 700-800m revenue.
Investments and deals
- Recapitalisation and refinancing
- In December 2025 the Basque consortium bought 29.8% at EUR 4.25 per share, SEPI subscribed a capital increase (7.8753%) and a EUR 30m convertible, and a further EUR 75m convertible was issued, alongside a EUR 650m CESCE-backed syndicated loan, a EUR 120m working-capital facility and a EUR 500m guarantee line.
- Plant investment and hiring
- Significant industrial investment and hiring are planned to the end of 2027, a substantial part at Rivabellosa; more than 200 people had been hired for production by June 2026.
- R&D and capex
- FY2025 capex was EUR 44.0m, mainly capitalised R&D, including Hympulso, a high-speed hydrogen train due for completion in 2026.
- AI in maintenance
- AI tools SophIA (diagnostics assistant), TalIA (fault-management agent, in development), TALVI (visual inspection) and TSMART (predictive maintenance) are being deployed, and Microsoft 365 Copilot is being rolled out.
Challenges and risks
- Renfe Avril penalty and relations
- Talgo provisioned EUR 116m for Renfe's late-delivery penalty on 30 Avril trains; a July 2026 agreement defers penalties to 2032-2037 and adds a EUR 132m conversion contract.
- Net debt and working capital
- Net financial debt rose to EUR 497m at June 2026 with working capital of EUR 581m; net debt is expected to stay elevated during working-capital-intensive phases, and the new loans carry covenants and limit dividends.
- Loss-making legacy projects
- FY2025 included a EUR 53.3m extraordinary charge for the Deutsche Bahn order cut from 79 to 60 trains, the Los Angeles Metro termination and restructuring costs.
- Delivery capacity
- The chairman acknowledged past "deficiencies in economic management and leadership" and said Talgo must improve its capacity to deliver orders and grow to absorb fixed engineering and R&D costs.
- Competitive tenders
- Pipeline opportunities are subject to competitive tenders; for Renfe's 350 km/h tender of more than EUR 1,700m the Government's options have included Chinese makers, Siemens and Hitachi.
What leadership says
“Talgo has to improve its capacity to deliver orders, through, among other measures, industrial investments, and it has to grow to optimise its fixed cost structure, in particular those linked to engineering and R&D activity.”
“Between now and the end of 2027 we will make significant industrial investments, and equally significant hiring will take place, a substantial part of both located at the Rivabellosa plant.”
“Citizens would not understand that the regulator, the operator, and ultimately the Government, do not consider Talgo's technological solutions as the best adapted to the priorities of Spanish society.”
Where a supplier can help
- Industrial capacity build-out
- Doubling industrial capacity by 2028 and new investment at Rivabellosa and Las Matas (priority) create demand for production equipment, automation, plant engineering and construction suppliers.
- Recruiting and training
- About 200 production hires in 2026 and significant hiring to 2027 (investments) suit recruitment, onboarding and skills training providers.
- Project delivery and supply chain
- The push to improve delivery punctuality after the Avril delays (challenge) favours project planning, supply-chain and quality tools that keep large train programmes on schedule.
- Working-capital and finance tools
- Elevated net debt and working capital (challenge) make cash, receivables and treasury solutions relevant to the finance team.
- Digital maintenance and AI
- The roll-out of SophIA, TalIA, TALVI and TSMART (investments) opens room for data, IoT and AI partners in predictive maintenance.
Tamtam's reading of the priorities and challenges above, not the company's own words.
Selling to companies like Talgo?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companiesKey documents
Read in full by Tamtam; each summary links to the document itself.
- Talgo, S.A. and Subsidiaries - Consolidated Financial Statements and Consolidated Directors' Report 2025
- Talgo is a Spanish designer, manufacturer and maintainer of lightweight high-speed and intercity trains (Avril very-high-speed and Talgo 230 platforms), plus maintenance equipment such as underfloor wheel lathes; 3,594 employees at year-end 2025.
- FY2025 revenue was EUR 618.2m (EUR 669.2m in 2024), above EUR 600m for the third consecutive year; Rolling stock EUR 555.0m, Auxiliary machines and others EUR 63.2m.
- Rest of Europe is the largest market (EUR 315.9m of revenue), ahead of Spain (EUR 131.4m) and Middle East and North Africa (EUR 94.7m).
- EBITDA was EUR 649 thousand after a EUR 53.3m extraordinary charge (Deutsche Bahn order cut from 79 to 60 trains, Los Angeles Metro termination, restructuring costs); excluding it EBITDA was EUR 53.9m (8.1% margin). Net loss EUR 100.6m (EUR 107.9m loss in 2024).
- Contract awards of EUR 1,473m in 2025 (FlixTrain up to 65 trains, DB and DSB extra scopes) lifted the backlog to EUR 4,466m despite EUR 548m of reductions; with the 20-train SAR (Saudi Arabia) award signed after year-end it is about EUR 5,798m.
- December 2025 recapitalisation: a Basque investor consortium (Clerbil, Finkatuz, BBK and Vital foundations) bought 29.8% at EUR 4.25 per share; SEPI entered via a capital increase (7.8753%) and a EUR 30m convertible; a further EUR 75m convertible; a EUR 650m CESCE-backed syndicated loan, EUR 120m working-capital facility and EUR 500m guarantee line.
- Net financial debt was EUR 393m and working capital EUR 561m at year-end; operating cash flow was -EUR 103m and investment EUR 44.5m.
- Main open risk: the EUR 116m Renfe penalty for late Avril deliveries (provisioned in 2024, still contested) plus EUR 98.5m unbilled and EUR 22m overdue on that project.
- The board, chaired by Jose Antonio Jainaga Gomez, signed the accounts on 27 February 2026; new shares from the capital increase began trading in January 2026, and the new financing limits dividends.
- Talgo Annual Report 2025 - Strength and Momentum for a New Phase
- Talgo presents itself as a leader in lightweight high-speed trains, with more than 3,500 employees, 180 trains in operation or under production, 300+ trains under maintenance, industrial presence in 8 countries and EUR 618 million revenue in FY2025.
- FY2025: EBITDA EUR 0.6m reported, EUR 53.9m excluding extraordinaries; net loss EUR 100.7m; backlog a record EUR 4,466m; net financial debt EUR 393.7m; capex EUR 44.0m.
- Contracts signed in 2025 totalled EUR 1,458m, led by FlixTrain (up to 65 Talgo 230 trainsets, up to EUR 2,400m, firm order of 30 for about EUR 1,100m). In 2026, SAR (20 Very High-Speed trains, EUR 1,332m) and Trafikverket in Sweden (about EUR 756m) followed.
- The backlog reached EUR 5,668m in Q1 2026. Rolling stock is 97% of the backlog and 91% of revenue (average of 2024-2025).
- 2026 guidance: revenue EUR 700-800m, EBITDA margin excluding extraordinaries 7.5-8.5%, order intake EUR 1.5-2.0bn (already exceeded), NFD/EBITDA below 5.5x. The two-year pipeline is EUR 7.9bn, more than 60% in Europe.
- Chairman Jose Antonio Jainaga: new shareholders (Basque Consortium and SEPI) bring stability. Priorities are more industrial capacity at Rivabellosa and Las Matas, about 200 hires, punctual deliveries, and a new Strategic Plan built on shared product platforms.
- Sustainability Master Plan 2026-2030. AI tools (SophIA, TalIA, TALVI, TSMART) are being deployed in maintenance.
- Talgo Condensed Consolidated Interim Financial Statements and Directors' Report, 30 June 2026
- H1 2026 revenue was EUR 375.8m, up 39% from EUR 270.1m. Rolling stock grew to EUR 348.9m (EUR 238.3m); Auxiliary machines and others fell to EUR 27.0m (EUR 31.8m).
- EBITDA was EUR 32m (8.44% margin) against -EUR 16m in H1 2025; operating profit was EUR 11.76m. The net result was a EUR 27.01m loss (EUR 65.72m loss).
- The backlog grew by more than EUR 2,133m in the half to a record EUR 6,239m.
- Main awards: 20 more high-speed trains for SAR (Saudi Arabia) with maintenance of 55 trains to March 2038; Trafikverket (Sweden) ordered 10 locomotives, 9 day and 11 night trainsets with 10 years of maintenance.
- Rest of Europe revenue almost doubled to EUR 226.0m (EUR 117.3m). Spain was EUR 68.0m and MENA EUR 45.3m.
- Talgo and Renfe reached a comprehensive agreement on the 30-train Avril contract, covering withheld payments, acceptance, guarantees and the delay penalty.
- Working capital was EUR 581m and net financial debt EUR 497m with EUR 120m cash. EUR 385m of tranche A and EUR 80m of tranche B of the syndicated loan were undrawn.
- Ricardo Chocarro Melgosa signs as CEO, beside Chairman Jose Antonio Jainaga Gomez.
- Talgo 9M 2026 Results Presentation
- 9M 2026 revenue was EUR 572.0m, up 29.1% from EUR 443.1m, driven by manufacturing execution, maintenance and refurbishment.
- EBITDA was EUR 46.2m (8.1% margin) against -EUR 3.3m a year earlier; excluding extraordinaries it was EUR 51.7m (9.0%).
- Order intake was EUR 2,584m, above the initial EUR 1,500-2,000m target. The backlog was a record EUR 6,477m (+45% vs FY2025), 98% rolling stock.
- The commercial pipeline for 2026-2027 is EUR 9,600m, mainly Very High Speed and Talgo 230 demand in Europe.
- July 2026 agreement with Renfe on the S106 Very High-Speed project: Talgo converts 15 fixed-gauge trains to variable gauge for EUR 132m. Penalties are deferred to 2032-2037. About EUR 200m of guarantees are close to release.
- Q3 milestones: more DSB trainsets delivered, the first DB trainset passed its key in-service performance milestone, more Renfe S130/730 trains delivered.
- FY2026 guidance maintained: revenue EUR 700-800m, EBITDA margin excluding extraordinaries 7.5-8.5%, NFD/EBITDA below 5.5x.
- Jainaga avanza 200 contrataciones en Talgo este año (Foro Capital, Fundación Vital)
- Talk by Talgo's chairman at Fundación Vital's Foro Capital in Vitoria-Gasteiz, reported by Onda Vasca/NTM on 23 February 2026, about two months after his consortium took the stake.
- Hiring: about 200 workers to be hired in 2026 at the Alava plant (Rivabellosa) to meet orders; significant industrial investment and hiring planned to the end of 2027, a substantial part at Rivabellosa.
- Diagnosis: Talgo "has a solution" despite a "delicate financial situation" and a "public image problem", both tied to Renfe's Avril fine. He acknowledged past "deficiencies in economic management and leadership" (translated).
- Priorities: improve delivery capacity, and grow to absorb fixed costs, especially engineering and R&D.
- Growth drivers: liberalisation of Spanish high speed, upcoming Renfe tenders, and more than EUR 500,000m of planned EU rail investment. He does not rule out one-off industrial alliances with national operators, mainly in Eastern Europe.
- Deal: talks were "on the verge of breaking down" (translated). Support came from the Basque Government (Finkatuz), BBK, Vital, Ekarpen, SEPI, ICO and CESCE; 13 banks are in the EUR 650m syndicated loan. HQ moved to Alava.
- Jainaga: "La ciudadanía no entendería" que el Gobierno no comprara trenes de Talgo tras Adamuz (AGM 2026 speech)
- El Español's report of Chairman Jose Antonio Jainaga's speech at Talgo's first AGM under the Sidenor-led consortium, held on 2 June 2026.
- Renfe has tendered up to 40 trains running at 350 km/h, for more than EUR 1,700m. Jainaga pitched Talgo's trains as more "accessible", "light" and "sustainable", and up to 35% more efficient than competitors at very high speed.
- He told the Government that citizens "would not understand" if regulator, operator and Government did not see Talgo's solutions as best suited to Spanish society's priorities (translated), citing the Adamuz accident.
- Talgo plans to design in three years a new 350 km/h train able to enter the Renfe mega-contract.
- To repair relations with Renfe, the last three Avril trains are to be delivered in the coming weeks; that order ran about four years late and led to a EUR 116m fine.
- Talgo intends to double industrial capacity by the end of 2028. More than 200 people have been hired for production, with new investment at Rivabellosa and Las Matas.
- The backlog is a record EUR 6,307m, against EUR 4,466m at end-2025. General manager Rafael Sterling said 2026 order targets were already exceeded.
Questions about Talgo
What does Talgo do?
Talgo designs, manufactures and maintains lightweight high-speed and intercity trains, and supplies maintenance equipment such as underfloor wheel lathes, mostly to public-sector railway operators in Europe, the Middle East, Central Asia and the USA.
What is Talgo's revenue?
FY2025 revenue was EUR 618.2m. In the nine months to September 2026 revenue rose 29.1% to EUR 572.0m, and FY2026 guidance is EUR 700-800m.
How many people work at Talgo?
Talgo had 3,594 employees at year-end 2025 and an average headcount of 3,622 in H1 2026.
Who owns and leads Talgo?
Since December 2025 a Basque consortium (Clerbil, Finkatuz, BBK and Vital) holds a stake and SEPI is a shareholder. Jose Antonio Jainaga Gomez is Chairman and Ricardo Chocarro Melgosa signs as CEO.
What is Talgo's strategy?
Talgo is expanding industrial capacity, improving delivery punctuality and building a new Strategic Plan on shared Intercity and High Speed platforms, while converting a record backlog into revenue.
Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)