TenneT is the Dutch state-owned electricity transmission operator for the Netherlands and much of Germany, with EUR 9,101 million of 2025 underlying revenue.

TenneT Holding B.V. is a transmission system operator wholly owned by the Dutch state, running the high-voltage grid in the Netherlands (110 kV and higher) and a large part of Germany (220 kV and higher). It operates over 26,000 km of high-voltage connections, 481 substations, 17 interconnectors and 22 offshore connections with 14.7 GW of installed offshore capacity, serving over 43 million end-users. In FY2025 underlying revenue was EUR 9,101 million and underlying EBIT EUR 2,746 million, with 10,836 colleagues (9,562 employees). Revenue is mostly regulated by ACM in the Netherlands and BNetzA in Germany. TenneT Germany was deconsolidated on 30 June 2026 after outside investors and KfW took stakes; the Holding keeps 28.9% of votes and an 81.1% economic stake.

Business units

Strategic priorities

Build the grid faster
Standardised designs and the 2GW Program, a replicable 2 GW HVDC platform with 525 kV cable, are meant to more than triple offshore grid capacity in the Netherlands and Germany to 40 GW by 2032. SuedLink and SuedOstLink are fully permitted and under construction.
Use the existing grid better
Flexibility products such as Time-Dependent Transmission Rights, with 50 to 65% tariff discounts, could unlock up to 9.1 GW off-peak; Dynamic Line Rating runs on 20 connections.
Dutch Acceleration Package
With over 30 measures and over 100 congestion projects, the package with the ministry aims to cut lead times by up to 50%, with full effect expected by 2028, as about 60% of Dutch grid projects are expected 2.5 years late.
German investment agenda
TenneT Germany plans EUR 65 billion of investment over 2025-2029, about EUR 13 billion a year, roughly half offshore and half onshore, growing its asset base to more than EUR 85 billion in 2029.
Organisational transformation
A target operating model moving from functional to end-to-end working is being implemented in 2026, with emphasis on data, technology and AI.

Latest results

In H1 2026 underlying revenue was EUR 5,173 million against EUR 4,409 million in H1 2025, and underlying EBIT EUR 6,337 million, inflated by a EUR 4.6 billion gain on the deconsolidation of TenneT Germany; IFRS EBIT was EUR 2,950 million. TSO Netherlands EBIT rose to EUR 579 million from EUR 447 million. Investments reached EUR 6,023 million (H1 2025: EUR 5,504 million), but full-year 2026 investments are expected below plan as 2GW Program offshore spend shifts to 2027 after the move from Petrofac to Larsen & Toubro. Adjusted FFO/net debt was 7.3% and adjusted ROIC 6.4%.

Investments and deals

Record grid investment
FY2025 grid investments were EUR 14.8 billion (NL EUR 4.9 billion, DE EUR 9.9 billion), up from EUR 10.6 billion but below the EUR 18.0 billion target.
Equity for TenneT Germany
APG, GIC and NBIM committed up to EUR 9.5 billion for 46% of voting rights (closed 30 June 2026, EUR 2.5 billion initial contribution), and KfW bought 25.1% for EUR 3.3 billion on 3 July 2026.
2GW Program supply framework
The 15-year framework committed EUR 50 billion to the market for 14 converter systems, eight for the Netherlands and six for Germany; Larsen & Toubro joins Hitachi Energy after Petrofac was partially terminated in October 2025.
Funding reset
TenneT Netherlands holds the state-guaranteed senior debt and issued its first EUR 2.0 billion green bond (10-year, 3.25%) in March 2026; TenneT Germany has a EUR 12 billion RCF and a EUR 35 billion Debt Issuance Programme.
Cross-border links
A Joint Development Agreement with National Grid covers LionLink (up to 2 GW, early 2030s), and TenneT Germany is exploring GriffinLink with National Grid.

Challenges and risks

Permitting and project delays
Onshore projects take 8 to 12 years, 70-80% of which is permitting; Dutch lines such as Utrecht-Noord slipped from 2029 to 2033.
Supplier scarcity and distress
HVDC, transformers and cables come from few global players; Petrofac was partially terminated in October 2025 and Petrofac Norge B.V. was declared bankrupt on 8 June 2026, with claims pending both ways.
Regulatory returns
ACM decided in February 2026 to move to cost-based regulation for 2027-2031, and BNetzA is redesigning the post-2029 German framework; Germany's fourth regulatory period cut the return on equity.
Grid congestion and connection backlog
The Netherlands had 713 open connection requests and announced measures in Flevoland, Gelderland and Utrecht to prevent large-scale outages; TenneT Germany received 250 GW of battery connection requests.
Safety and security
TRIR was 4.1 against a target of 3.1 in 2025, three subcontractor workers died in unrelated incidents in May 2026, and cyber and physical security are named operational risks.

What leadership says

“Slowing down is not an option: the costs of underinvesting in infrastructure outweigh the investments needed today.”

Manon van Beek, CEO of TenneT Holding · TenneT Holding B.V. Integrated Annual Report 2025, 2026-03-09

“Failing to invest, or investing too slowly, is simply not an option if we want to power societal and economic prosperity.”

Dieuwert Inia, CFO · TenneT Holding B.V. Integrated Annual Report 2025, 2026-03-09

“every euro that we are investing is reducing at least two euros on the ancillary side”

Tim Meyerjürgens, CEO of TenneT Germany · Cleaning Up podcast Ep233, 2025-11-12

“a step towards becoming a modern, customer-oriented, data-driven TSO.”

Maarten Abbenhuis, COO · TenneT Holding B.V. Integrated Annual Report 2025, 2026-03-09

Where a supplier can help

Grid equipment and supply-chain capacity
Tied to the supplier scarcity challenge and the 2GW Program: TenneT seeks long-term partners for HVDC, transformers and cables who can add capacity and deliver on time.
Construction and civil works for onshore projects
Tied to the build-faster priority and project delays: with around 1,000 Dutch projects and German DC corridors, contractors that reduce lead times or replace failed contractors fit a stated need.
Flexibility and grid optimisation technology
Tied to the use-the-grid-better priority: dynamic line rating, batteries and flexibility products are how TenneT frees capacity without new lines.
Data, AI and operating model support
Tied to the 2026 organisational transformation toward end-to-end working with an emphasis on data, technology and AI, and to asset data quality risk.
Safety and security services
Tied to the safety and security challenge: contractor safety, cyber and physical security of substations are named risks after the 2026 incidents.

Tamtam's reading of the priorities and challenges above, not the company's own words.

Selling to companies like TenneT?

Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.

Find similar companies

Key documents

Read in full by Tamtam; each summary links to the document itself.

Questions about TenneT

What does TenneT do?

TenneT is a transmission system operator that runs the high-voltage electricity grid in the Netherlands and a large part of Germany, balances supply and demand and connects offshore wind farms. It serves over 43 million end-users.

What was TenneT's revenue in 2025?

FY2025 underlying revenue was EUR 9,101 million (2024: EUR 8,430 million) and underlying EBIT EUR 2,746 million. IFRS revenue was EUR 11,436 million.

How many people work at TenneT?

At end-2025 TenneT had 10,836 colleagues: 9,562 employees (3,933 in the Netherlands and 5,629 in Germany) plus 1,274 externally contracted.

Who owns TenneT?

TenneT Holding is wholly owned by the Dutch state. TenneT Germany was deconsolidated on 30 June 2026 after APG, GIC and NBIM took 46% of voting rights and KfW bought 25.1%; the Holding keeps 28.9% of votes.

Who leads TenneT?

Manon van Beek has been CEO since 2018; Frans Everts succeeds her from 1 November 2026. Tim Meyerjürgens is CEO of TenneT Germany.