wienerberger account plan
Building solutions provider
At a glance
wienerberger makes bricks, roof tiles, facades and plastic pipes in 28 countries, with EUR 4,566m of 2025 revenues and more than 20,000 employees.
wienerberger supplies solutions for the building envelope (walls, facades, roofs) and for water and energy infrastructure, through ceramic products, plastic pipes and concrete products, for both new build and renovation. Headquartered in Vienna, it runs over 200 production sites in 28 countries across Europe, North America and India, and describes itself as the world's largest producer of bricks. In 2025 revenues were EUR 4,566m, operating EBITDA EUR 754m and profit after tax EUR 168m, with 20,184 employees at year-end. Wienerberger AG is listed on the Vienna Stock Exchange as a pure free-float company with no core shareholder.
Business units
Europe West
59% of 2025 group revenues (EUR 2,686m)Wall, facade and roof systems, pavements, and wastewater, rainwater, sanitation and energy and water management solutions across Northern and Western Europe. 2025 operating EBITDA rose 17% to EUR 408m, helped by roofing, renovation and piping, while wall and facade demand stayed weak in Germany, France and the UK. In H1 2026 revenues were EUR 1,445m but operating EBITDA fell to EUR 189m.
Europe East
26% of 2025 group revenues (EUR 1,180m)Building envelope solutions, wastewater and rainwater management, energy, gas and water infrastructure, and pavers across Central and Eastern Europe. 2025 operating EBITDA was EUR 214m, pressured by energy and personnel cost inflation; in H1 2026 the margin fell to 13.4% from 17.3%. Led by Gerhard Hanke as COO Central & East in 2025.
North America
15% of 2025 group revenues (EUR 700m)Ceramic facades and piping solutions for residential and commercial construction. Revenues fell from EUR 799m in 2024 on an 8% volume decline as the housing downturn hit facade bricks, and piping pricing fell 15% on raw material deflation; operating EBITDA dropped to EUR 132m. H1 2026 revenues fell further to EUR 322m.
Strategic priorities
- Reduce leverage
- Net debt reached EUR 2.4bn at 30 September 2026 and is targeted at EUR 2.2bn by year-end 2026; the long-term target of approximately two times net debt to operating EBITDA remains, with a debt reduction plan due on 4 March 2027.
- Performance enhancement programme
- Recurring savings from sourcing, operations and SG&A are to improve operating EBITDA by EUR 140m in 2029, with a run rate of around EUR 80m by end-2027, on top of the "Fit for Growth" measures.
- Portfolio review
- The entire portfolio is being reviewed, with underperforming and peripheral businesses in focus and selective disposals possible; roofing and piping remain core pillars, and conclusions are due by 4 March 2027 at the latest.
- Focus on renovation and infrastructure
- Infrastructure and renovation account for more than 60% of group revenues; renovation of the building envelope and water and energy solutions remain strategic priorities.
- Decarbonisation targets
- Under the Sustainability Program 2023-2026, scope 1 and 2 CO2 emissions were down 20.7% since 2020 against a 25% target, and 74.1% of revenue came from products supporting net zero buildings in 2025.
Latest results
In Q3 2026 revenues rose around 8% to EUR 1.3bn, supported by price increases of close to 6% and acquisitions, mainly Italcer, while group volumes fell 6%. Operating EBITDA dropped to EUR 180m from EUR 202m on weaker demand and higher energy, raw material and logistics costs. In H1 2026 revenues were EUR 2,434m and operating EBITDA EUR 326m, against EUR 383m a year earlier. Guidance was cut from around EUR 810m to approximately EUR 700m in August, then to EUR 640-650m on 6 October 2026, which wienerberger reiterated on 12 November 2026.
Investments and deals
- Italcer acquisition
- On 30 April 2026 wienerberger acquired 50% + 1 of the shares of Italcer S.p.A., an Italian ceramic surfaces producer with hubs in Italy and Spain, for cash consideration of EUR 159m; enterprise value was EUR 560m.
- NEWS Group acquisition
- 100% of Northern Environmental and Water Solutions, a Scandinavian wastewater and treatment provider, acquired on 30 April 2026.
- 2025 bolt-on acquisitions
- MFP Ltd. (drainage, roofline and cable ducting), VETA France (insulated facade panels) and the remaining stake in GSEi (roof-integrated photovoltaics) for EUR 24m.
- Capex and M&A freeze
- Capex in 2025 was EUR 148m maintenance and EUR 133m growth; since the strategic review new M&A is suspended, new growth capex is paused and maintenance capex is to be cut.
- Restructuring and plant closures
- Q4 2026 one-offs of EUR 70-80m, all restructuring including impairments and plant closures, as capacity is mothballed in Europe.
Challenges and risks
- Weak residential new-build demand
- New residential construction stayed weak, particularly in the UK, the US and Canada, and management expects no real major recovery on the new build side.
- Cost inflation
- Energy costs were EUR 384m in 2025, 8.4% of revenues; in Q3 2026 cost inflation of 8% outpaced 6% pricing as crude oil prices almost doubled.
- Idle capacity and low returns
- Idle-capacity costs were EUR 10m higher in Q3 2026 than a year earlier, and ROCE fell to 8.4% in 2025 against a cost of capital of around 10%.
- High leverage after Italcer
- Year-end 2026 net debt of maximum EUR 2.2bn corresponds to around 3.3x-3.4x operating EBITDA, against a target of about 2.0x.
- US antitrust settlement
- EUR 47m was booked for the settlement of a US antitrust lawsuit involving Pipelife Jet Stream, Inc. and other PVC pipe makers.
What leadership says
“Our focus is clearly on reducing leverage, strengthening the balance sheet, and improving profitability and cash generation to enhance our financial resilience and strategic flexibility.”
“We are currently reviewing the group's entire portfolio without any exceptions.”
“We know that there will be no real major recovery on the new build side.”
“Regarding maintenance CapEx, it's our clear target to spend less.”
Where a supplier can help
- Procurement and sourcing savings
- Tied to the performance enhancement programme, which targets savings from optimising and bundling sourcing: procurement analytics, category management and supplier consolidation.
- Energy efficiency and energy procurement
- Tied to the cost inflation challenge and EUR 384m of energy costs: energy management, hedging advisory and kiln efficiency or electrification, which Italcer already runs in Spain.
- Plant network optimisation
- Tied to idle-capacity costs and Q4 2026 plant closures: capacity planning, mothballing and asset disposal services.
- Working capital and cash tools
- Tied to the leverage priority: working capital, inventory and receivables management, with working capital at EUR 1.4bn at end-September 2026.
- Post-merger integration of Italcer
- Tied to the Italcer acquisition, whose systems and data were not yet aligned with wienerberger standards: ERP and data integration services.
Tamtam's reading of the priorities and challenges above, not the company's own words.
Selling to companies like wienerberger?
Tamtam finds the companies that match your ideal customer, researches each account and tells you who to contact and when.
Find similar companiesKey documents
Read in full by Tamtam; each summary links to the document itself.
- wienerberger Annual Report 2025
- wienerberger is a Vienna-listed provider of solutions for the entire building envelope (wall, facade, roof) and for water and energy infrastructure (plastic and ceramic pipes), with more than 20,000 employees, over 200 production sites and operations in 28 countries; core markets are Europe, North America and India.
- FY2025: revenues EUR 4,566m (+1% vs EUR 4,513m), operating EBITDA EUR 754m (2024: EUR 760m, margin 16.5%), profit after tax EUR 168m (2024: EUR 84m), EPS EUR 1.52 (2024: EUR 0.72), free cash flow EUR 474m (2024: EUR 417m).
- Segments: Europe West 59% of revenues (EUR 2,686m, operating EBITDA +17% to EUR 408m), Europe East 26% (EUR 1,180m), North America 15% (EUR 700m, operating EBITDA down to EUR 132m from EUR 191m on an 8% volume decline).
- Products: Pipes 29%, Roof 27%, Facade 26%, Wall 16%, Surface 2% of revenues; by end market renovation 38%, infrastructure 19%, residential new-build 43%. The CEO says more than half of revenues and earnings now come from roofing and piping.
- Balance sheet: net debt cut to EUR 1,637m (leverage 2.2x vs ~2.0x target); EUR 400m bond repaid; working capital down to 20% of revenues; ROCE 8.4% (2024: 9.5%) after the Terreal acquisition.
- M&A: full-year contribution of Terreal (roofing, acquired 2024); 2025 bolt-ons MFP (drainage, roofline, cable ducting, Ireland/UK), VETA France (insulated facade panels) and remaining stake in GSEi (in-roof photovoltaics); total M&A spend EUR 24m (2024: EUR 637m).
- Outlook 2026 (as published): agreement signed on 24 Feb 2026 to acquire Italcer (high-end ceramic tiles, Italy and Spain); operating EBITDA guided at around EUR 810m including Italcer; no structural recovery of new residential construction expected; Middle East conflict impacts not reflected.
- Key risks: construction-cycle dependency, energy costs (EUR 384m in 2025, 8.4% of revenues), polymer raw material prices for pipes, carbon pricing, substitution by other materials, and US class actions alleging antitrust violations against PipeLife Jet Stream, Inc. (disclosed in the notes).
- Management: CEO Heimo Scheuch (chair of the Managing Board since 2009), CFO Dagmar Steinert (since 1 March 2025), Gerhard Hanke (COO Central & East), Harald Schwarzmayr (COO West); Supervisory Board chaired by Peter Steiner. Dividend proposal EUR 0.95 per share.
- wienerberger Report on the First Half-Year 2026
- H1 2026 revenues EUR 2,434m (+4% vs EUR 2,346m), including EUR 84m from newly consolidated Italcer and NEWS Group; operating EBITDA EUR 326m (-15% vs EUR 383m), margin 13.4% (H1 2025: 16.3%).
- Profit after tax EUR 0 (H1 2025: EUR 108m) and EPS EUR 0.01 (H1 2025: EUR 0.97), after EUR 47m provisioned for settling US PVC-pipe antitrust litigation (Pipelife Jet Stream), EUR 17m restructuring and EUR 7m M&A costs.
- Q2 2026 revenue +13% to EUR 1.4bn (7% organic, 6% M&A) but Q2 operating EBITDA EUR 230m vs EUR 253m, on weak residential new-build in North America and the UK and cost inflation from geopolitical conflict.
- Guidance cut: 2026 operating EBITDA now expected at approximately EUR 700m.
- Italcer (50% + 1 share of an Italian producer of ceramic surfaces) acquired 30 April 2026 for EUR 159m cash consideration (net cash outflow EUR 130m); NEWS Group (Nordic wastewater solutions) acquired 100% the same day; M&A capex EUR 157m.
- Net debt rose to EUR 2,402m (YE 2025: EUR 1,637m); free cash flow EUR -203m; working capital 28% of pro-forma revenues; target to cut leverage to 2.4x by end 2027, then towards 2.0x.
- Segments H1: Europe West EUR 1,445m revenue (+5%) and EUR 189m operating EBITDA (-8%); Europe East EUR 667m (+13%) and EUR 90m (-13%); North America EUR 322m (-14%) and EUR 48m (-36%).
- Gerhard Hanke signs as Interim Chairman of the Managing Board (CEO & COO Central & East); more than 60% of revenue now comes from infrastructure and renovation.
- wienerberger delivers Q3 results in line with guidance and advances strategic review (Q3 2026 press release)
- Q3 2026 revenues about EUR 1.3bn (Q3 2025: EUR 1.2bn), +8%, driven by price increases of close to 6% and acquisitions, primarily Italcer.
- Q3 operating EBITDA EUR 180m (Q3 2025: EUR 202m), reflecting weaker demand and higher energy, raw material and logistics costs; cost inflation accelerated from late August.
- FY2026 operating EBITDA guidance of EUR 640-650m reiterated (as communicated on 6 October 2026).
- Net debt EUR 2.4bn at 30 September 2026, targeted at EUR 2.2bn by year-end.
- Strategic review by CEO Gerhard Hanke: performance measures to lift operating EBITDA by EUR 140m in 2029 (sourcing, operations and SG&A), on top of the existing "Fit for Growth" programme.
- Deleveraging first: M&A paused, capex limited, dividend policy under review, selective disposals possible within a portfolio review that builds on renovation and infrastructure.
- Residential new-build weak especially in the UK, the US and Canada; renovation and infrastructure steadier but not offsetting.
- Next milestones: FY2026 results on 17 February 2027 and strategic review details with the 2027 outlook on 4 March 2027.
- wienerberger Q3 2026 earnings call transcript
- Gerhard Hanke, confirmed as CEO the day before the call after acting as interim CEO since early August 2026, sets three priorities: deleveraging, portfolio optimisation and a EUR 140m performance programme.
- Q3 2026: revenue about EUR 1.3bn (+8%, of which M&A +8% or EUR 93m, mainly Italcer), operating EBITDA EUR 180m; group volumes -6% and prices +6%; 8% cost inflation outran 6% pricing; idle-capacity costs EUR 10m higher than Q3 2025.
- Nine months: volumes -3%, pricing +3%; new residential -5%; renovation and infrastructure close to 60% of revenues; operating EBITDA EUR 506m after EUR 81m adjustments (EUR 47m US antitrust settlement, paid in Q3).
- FY2026 guidance EUR 640-650m confirmed; year-end net debt at most EUR 2.2bn, around 3.3x-3.4x leverage; target of about 2x unchanged; debt reduction plan for 2027-2028 due on 4 March 2027.
- Actions: new M&A and new growth capex paused, maintenance capex to be cut, ongoing projects reviewed, dividend policy under evaluation, aim to postpone the second Italcer instalment.
- Portfolio review covers every business; roofing and piping confirmed as pillars; facade and masonry examined region by region, with Western European wall positions "definitely more challenging".
- Q4 2026 one-offs of EUR 70-80m for restructuring and plant closures/mothballing; about half cash-out in H1 2027.
- Gas: 80% of 2027 volume already hedged; ROCE of around 7-8% versus a cost of capital of around 10% called much too low.
- wienerberger full-year 2025 results call transcript
- FY2025 call (24 February 2026), CEO Heimo Scheuch and CFO Dagmar Steinert; guidance delivered with a 16.5% operating EBITDA margin and profit after tax roughly doubled to EUR 168m.
- Scheuch says relevant markets fell to 65% of their 2021 level in 2025 (70% in 2024); Canada new residential down more than 30% and the US around 9-10%.
- Cost inflation of +4% (more than EUR 100m) absorbed through EUR 30m overhead savings, operational excellence and "Fit for Growth" (annual savings of EUR 15-20m once in full swing).
- 2026 base guidance EUR 760m operating EBITDA assuming flat markets, after EUR 36m of measures and a EUR 30m one-off energy burden; EUR 810m including about EUR 50m from Italcer.
- Italcer: 50% plus one share bought first, about EUR 400m additional debt, enterprise value EUR 560m, EUR 82m full-year 2026 EBITDA, about EUR 10m quick synergies; fit through clay technology, shared distribution channels (e.g. Point P) and thin bricks/slips.
- Capex 2026 planned at EUR 280m (EUR 100m growth, EUR 160m maintenance, EUR 20m safety); net debt to be brought to about EUR 1.8bn by end-2026 via working capital, capex and real estate disposals.
- Dividend EUR 0.95, 28% of free cash flow; factoring close to EUR 200m at year-end 2025; innovation rate 34.4%.
Questions about wienerberger
What does wienerberger do?
wienerberger makes bricks, roof tiles, facades, pavers and plastic pipes for the building envelope and for water and energy infrastructure, with over 200 production sites in 28 countries.
What is wienerberger's revenue?
Revenues were EUR 4,566m in 2025, with operating EBITDA of EUR 754m. For 2026 the company guides operating EBITDA of EUR 640-650m.
How many employees does wienerberger have?
wienerberger had 20,184 employees at the end of 2025.
What is wienerberger's strategy?
Under a strategic review, it is reducing leverage, running a performance programme worth EUR 140m of operating EBITDA by 2029 and reviewing its portfolio, while keeping its focus on renovation and infrastructure.
Who leads wienerberger?
Gerhard Hanke was confirmed as CEO in November 2026 after stepping in as interim CEO in August, succeeding Heimo Scheuch; Dagmar Steinert is CFO.
Written by Tamtam from the company's own published documents listed above, read in full. Figures are as those documents state them, for the periods they name. (2026-11-17)